Get email alerts on the Drainage topic
No spam. Unsubscribe anytime.
Council orders quotes to fix blocked drainage and wrong‑size culvert after contractor digging
Summary
Council directed staff to obtain quotes to uncover and repair a drainage pipe blocked by digging and to replace an incorrectly sized culvert; motions to obtain quotes will return for vote at the next meeting.
Get email alerts on the Drainage topic
No spam. Unsubscribe anytime.
The council directed staff to obtain repair quotes after code enforcement reported a drainage pipe had been blocked during excavation.
Donnie Spradlin (code enforcement) told the council that Terry and Doris Miller of OpenInfra blocked a drainage pipe while digging; the council moved to get quotes to uncover and repair the drain. A separate motion directed staff to obtain a quote to replace an incorrectly sized culvert. Minutes also record that the mayor will contact TVEC to remove wood still piled next to the road at 1012 Savannah.
The motions to obtain quotes were made and seconded and are set to return to the council for a vote at the next meeting; the minutes do not record dollar estimates or contractors selected for the repair work.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
