Operator-in-Charge reports wastewater plant met effluent limits for June
Summary
Operator-in-Charge Bruce Neerhof told the Waldo Water & Sewer Utility Board that all effluent parameters met limits in June; staff also reported a low-flow condition, a pressure-tank fitting air leak, and a water-tower overflow incident.
Operator-in-Charge Bruce Neerhof, participating by phone, reported to the Waldo Water & Sewer Utility Board that "All effluent parameters met limits at the Wastewater Treatment Plant." He provided the June operations and lab summary at the July 13 meeting.
Neerhof said alum/ferric dosing was achieving 4.5 mg/L, below the stated 6.4 mg/L limit, and described dry, low-flow conditions under 10 gallons per minute. He also reported a pressure-tank fitting air leak and a water-tower overflow incident and noted that staff held a training meeting. The board took no separate action on operations beyond receiving the report.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
