Box Elder County code sets strict standards for flag lots, including stem width, hydrants and occupancy hold
Summary
The county code requires Planning Commission approval (or administrative conditional-use review), a minimum stem width of 30 feet, maximum stem length of 250 feet, fire-hydrant planning and no certificate of occupancy until required improvements are installed.
The Box Elder County Land Use and Development Code requires special approval for so-called "flag lots," including minimum and maximum dimensions and infrastructure conditions. The code states: "All flag lots shall be approved as a special provision to the Land Use and Development Code by the Planning Commission," and then lists objective criteria for approval.
Among the specific technical requirements, the code prescribes that "the staff of the flag lot has a minimum width of thirty (30) feet" and a maximum stem length of "two hundred and fifty (250) feet." The rules say the flag-lot area (exclusive of the stem) must meet all zoning requirements for the area or be at least one-half acre, whichever is greater. Applicants must submit a plan showing fire-hydrant locations and receive approval from the Fire Marshall; the code also specifies that all improvements, including hard surfacing and hydrants, be performed at the applicant's expense and that "no certificate of occupancy shall be issued for the proposed flag lot until the improvements are fully installed."
The code limits flag-lot approvals to subdivisions containing four lots or fewer, restricts the stem to ingress and egress (and utilities), and requires the stem to be improved to a private-road standard consistent with county public-works standards. The code permits the Planning Commission to impose additional conditions on approvals and authorizes, in some instances, administrative conditional-use review by the Zoning Administrator with the same objective tests.
No formal action, vote or change to the text is recorded in the provided excerpt; the transcript is the Code language itself and does not document an adoption event or amendment process.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.