Citizen Portal

Get email alerts on the Stormwater Infrastructure topic

No spam. Unsubscribe anytime.

Board approves $3,500 to widen E3 Basin control structure to improve outflow

River Ridge Community Development District Board of Supervisors · March 24, 2026

Summary

The River Ridge board approved MRI Construction Proposal #606 to widen the E3 Basin control-structure opening to its maximum width for improved outflow and requested before-and-after photos and consideration of a manual gate; the motion passed unanimously for $3,500.

The River Ridge board voted on March 24 to accept MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure, a change intended to increase outflow from the community basin. The motion, made by Assistant Secretary Kurt Blumenthal and seconded by Chair Bob Schultz, passed unanimously and authorized $3,500 for the work.

District Engineer Charlie Krebs explained that the existing control structure is slightly narrower than the maximum permitted width, and the work would use a concrete saw to widen the weir to allow more water to exit the basin. Krebs said he will provide before-and-after photographs of the work and will inquire whether a manual open/close gate could also be installed near the structure.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source