Get email alerts on the Water Infrastructure topic
No spam. Unsubscribe anytime.
Manager reports recurring electrical problems at well #3; surge suppression and temporary fixes planned
Summary
County Manager Thomas Weaver reported persistent electrical problems at well #3, said Burgamy Electric has done work, and that staff expects a surge suppression unit from Texas in about 20 days; temporary options (window unit HVAC) and further electrical contracting were discussed.
Get email alerts on the Water Infrastructure topic
No spam. Unsubscribe anytime.
At the Sept. 22 work session County Manager Thomas Weaver updated the commission on ongoing electrical failures at well #3 in the county water system and said Burgamy Electric has performed much of the repair work. Weaver said staff believe the recurring failures are electrical rather than mechanical and that a surge-suppression system being manufactured in Texas is expected to arrive and be installed in about 20 days.
Weaver said short-term measures include using a window-unit HVAC for the computer components and continued electrical diagnostic work; if problems persist staff will hire an electrical contractor. "Until we get the line vat replaced, we would rather get a window unit for now," Weaver said, describing interim steps to protect control equipment.
Weaver also reported work on a leak on Highway 137 and several recent service-line repairs; the water department has added two new employees to carry the workload.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
