Engineer says Wheeler Road Bridge replacement not in five‑year plan; estimated cost $1.4 million

Aug 25, 2026

County Engineer Cathy Nicholas said the closed Wheeler Road Bridge would cost roughly $1.4 million to replace, receives low priority in statewide bridge funding because of low traffic volumes, and is not currently in the county's five‑year plan.

The full story

County Engineer Cathy Nicholas reviewed the Wheeler Road Bridge history and replacement prospects, noting the bridge was closed around 2020 and that a similar sister bridge (Nesbitt Road) was replaced in 2014. Nicholas said a replacement would likely be a standard slab bridge and "we do believe it would be approximately $1,400,000 to replace that structure."

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in