Get email alerts on the Drainage Infrastructure topic
No spam. Unsubscribe anytime.
Board approves $3,500 MRI proposal to widen E3 Basin control structure
Summary
The Board approved MRI Construction Proposal #606 for $3,500 to widen the E3 Basin control structure weir to its maximum width to improve outflow; District Engineer will supply before‑and‑after photos and explore a manual gate option.
Get email alerts on the Drainage Infrastructure topic
No spam. Unsubscribe anytime.
Mrs. Cleo Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. Charlie Krebs said the current control structure is slightly shy of the maximum width and that the proposal calls for using a concrete saw to widen the weir to the maximum to improve outflow; he also said he would provide before‑and‑after photos and investigate the feasibility of installing a manual open/close gate near the structure.
On a motion by Kurt Blumenthal, seconded by Bob Schultz, the Board approved MRI Construction Proposal #606 in the amount of $3,500. The minutes record the motion as passed "with all in favor." Staff will provide photos and follow up on the manual gate inquiry.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
