Get email alerts on the Water Infrastructure topic
No spam. Unsubscribe anytime.
Village approves engineering work order for Prairie Ridge Road water-main replacement, $104,000
Summary
The board authorized Baxter & Woodman Work Order No. 19 for Prairie Ridge Road water main replacement and looping, not to exceed $104,000, approving the engineering services agreement at the Jan. 16 meeting.
Get email alerts on the Water Infrastructure topic
No spam. Unsubscribe anytime.
President Toni Wardanian presented a motion to authorize Baxter & Woodman Work Order No. 19 for engineering services related to the Prairie Ridge Road water main replacement and looping in an amount not to exceed $104,000. The work order covers engineering services to plan and oversee the water-main project.
Trustee Craig Kunz moved to approve the work order and Trustee Linda Weiss seconded. The board approved the measure on a roll-call vote with Trustees Elliott, Kunz, Metz, Peiler and Weiss voting aye; Trustee James Gerasco was absent. The authorization allows the village to proceed with engineering work subject to the not-to-exceed cap.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
