Local developer urges 8.5-acre by-right threshold for 3 MW solar projects
Jan 27, 2025
Gary Hurrell of Elevation Energy urged the Planning Commission to increase the by-right acreage for solar projects from 5 to 8.5 acres so 3-megawatt systems can qualify for Appalachian Power net-metering; he said a 3 MW Washington County project is coming forward and estimated large lifetime savings.
The full story
Gary Hurrell, who identified himself as owner of Elevation Energy during public comment, asked the Washington County Planning Commission to revise its proposed solar ordinance to allow larger by-right projects. Hurrell said the utility’s 3-megawatt net-metering limit typically equates to an 8–8.5 acre installation and asked the commission to consider 8.5 acres rather than the draft’s 5-acre threshold.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →