Operations report: pump replacement, pool repairs, weed spraying and beaver controls underway
Jul 28, 2026
Operations reported a full pump replacement for the clubhouse charged to Capital Reserves ($3,134.45), a $220.41 pool-filter gasket repair, ongoing open-space weed spraying and relocation of a beaver-leveling device to a drainage ditch.
The full story
The Operations Manager reported on several maintenance issues and completed repairs. The clubhouse pump required full replacement (the motor had previously been replaced), a $3,134.45 expense charged to Capital Reserves. PoolDoctorRX identified and repaired a failed gasket in a filter multi-valve that was allowing water loss; that repair cost $220.41. Staff also reset the South Meadow Pool autofill and added the item to daily inspections.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →