Get email alerts on the Drainage Improvements topic
No spam. Unsubscribe anytime.
Board approves $3,500 proposal to widen E3 Basin control structure to improve outflow
Summary
MRI Construction Proposal #606 was approved to widen the E3 Basin control-structure opening to maximum allowable width for improved drainage; the board requested before-and-after photos and asked about the possibility of adding a manual gate near the structure.
Get email alerts on the Drainage Improvements topic
No spam. Unsubscribe anytime.
Mrs. Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. Mr. Krebs explained the work would use a concrete saw to widen the weir to the maximum allowed to increase outflow toward the FPL easement and discussed whether a manual open/close gate could be installed.
On motion by Mr. Blumenthal and seconded by Mr. Schultz, "MRI Construction Proposal #606 to widen the opening on the E3 Basin Control Structure, in the amount of $3,500, was approved." Mr. Krebs said he will provide before-and-after photos and send project details and specifications to the Board.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
