Citizen Portal

Get email alerts on the Traffic Study topic

No spam. Unsubscribe anytime.

Pershing Road traffic study flags a Board decision point; engineer's letter provided

Neville Township Board of Commissioners · September 5, 2024

Summary

An engineer's letter dated Aug. 1, 2024 includes recommendations and specifically asks the Board to decide how to proceed on page five of the report; the Board was asked to review and act at a future meeting.

The caucus minutes show the township received the engineer's letter regarding the Pershing Road Traffic Study dated Aug. 1, 2024. Manager Creese provided the report and informed the Board that page five of the letter requires the Board to make a decision on next steps.

The minutes do not record a motion or the Board's decision at this caucus; commissioners were asked to review the paper and the item will return for a formal decision at a future meeting. No specific mitigation measures, cost estimates, or timelines were included in the minutes.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source