Digester cover implodes at treatment plant; utility explores replacement and insurance
Aug 27, 2026
Utility staff told the board a digester cover at the treatment plant imploded during preparation for sandblasting and painting, is beyond repair, and will be scrapped; replacements are available but could take months and insurance is being pursued.
The full story
Utility staff reported that a digester cover at the treatment plant imploded while the tank was being prepared for sandblasting and painting, leaving the cover a total loss and requiring removal and scrapping. "So now the cover is imploded, and the cover is a total loss," the utility staff said, describing a sudden failure of the vacuum breaker that was intended to relieve pressure.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →