Citizen Portal

Board approves $3,500 proposal to widen E3 Basin control structure weir

River Ridge Community Development District · March 24, 2026

Summary

The board unanimously approved MRI Construction Proposal #606 for $3,500 to widen the E3 Basin control structure weir to the maximum width to improve outflow; the engineer will provide before-and-after photos and explore adding a manual gate.

Cleo Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure; Charlie Krebs explained the proposal to use a concrete saw to expand the weir width to the maximum to improve outflow into the FPL easement. "On MOTION by Mr. Blumenthal and seconded by Mr. Schultz, with all in favor, MRI Construction Proposal #606 to widen the opening on the E3 Basin Control Structure, in the amount of $3,500, was approved," the minutes state.

Krebs will provide before‑and‑after photographs, send project details and specifications to the board, and investigate whether a manual open/close gate could be installed near the control structure.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source