Sewer operator reports facility functioning, town on track with phosphorus allocation

Jan 12, 2026

The wastewater treatment facility is operating normally, solar power came online Dec. 30, and the town is on track with its phosphorus allocation per the TMDL report, the sewer report states.

The full story

The town's sewer report, recorded in the minutes and signed "Respectfully, Edward Tracey," states: "I am pleased to report that the Wastewater Treatment Facility continues to perform without incident." The report notes that cold weather required a heat lamp in the effluent chamber to prevent surface freezing that could interfere with flow-meter readings and that solar power was activated on Dec. 30, 2025.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in