Eagle Point Solar pitches two rooftop systems for Bloomington wastewater plant

Feb 2, 2026

Eagle Point Solar proposed two photovoltaic systems for the Village wastewater treatment plant — a 29.8 kW option estimated to offset 25% of power use and a 69 kW option to offset 59% — with payback periods of about seven years and an expected 30% investment tax credit available to municipalities.

The full story

Eagle Point Solar presented the Village of Bloomington with two options for installing solar panels at the wastewater treatment facility, offering the board a chance to reduce annual electricity costs.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in