Board approves $3,500 MRI proposal to widen E3 basin control structure
Mar 24, 2026
The board approved MRI Construction Proposal #606 for $3,500 to widen the E3 Basin control structure weir to the maximum width; the engineer will provide before‑and‑after photos and explore adding a manual gate.
The full story
Mrs. Cleo Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. Engineer Charlie Krebs explained the work will use a concrete saw to widen the weir to the maximum allowable width to increase outflow; the board discussed scope and whether a manual open/close gate could be installed.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
or
