Board approves $3,500 MRI proposal to widen E3 Basin control structure opening

River Ridge Community Development District · March 24, 2026

Summary

The Board approved MRI Construction Proposal #606 to widen the E3 Basin control structure weir to the maximum width to improve outflow to the FPL easement; the work was authorized for $3,500.

Mrs. Cleo Adams presented MRI Construction Proposal #606 to widen the E3 Basin control structure, explaining the current weir is slightly narrower than maximum and widening would improve water outflow into the Florida Power & Light easement. District Engineer Charlie Krebs said the work would use a concrete saw to widen the weir and noted the Board could consider installing a manual open/close gate.

On motion by Supervisor Kurt Blumenthal, seconded by Chair Bob Schultz, the Board approved MRI Construction Proposal #606 in the amount of $3,500; Krebs will provide before‑and‑after photographs and send project specifications to the Board, and he will inquire about the feasibility of installing a manual gate near the control structure.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source