Engineering flags co-location design and water-level discrepancy at Lincoln Tank

Mar 12, 2026

HRG reported a cell-carrier contractor ordered railing materials but has not provided engineered sealed design drawings; HRG will not permit work until detailed review. Separately, Water Operations Manager Scott Mohn reported a water-level discrepancy discovered during the PLC upgrade and will notify local fire chiefs.

The full story

HRG advised the Authority that a cell carrier contractor issued a purchase order for materials and manufacture of a railing system for the Lincoln Tank on Feb. 26, 2026, but HRG has requested professionally engineered, sealed design drawings and structural analyses and will not permit any work until the Authority’s detailed review is complete. HRG said the PADEP public water system construction permit for the rehabilitation project expires Nov. 17, 2027.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in