Citizen Portal

Get email alerts on the Infrastructure topic

No spam. Unsubscribe anytime.

Board approves $3,500 MRI proposal to widen E3 basin control structure

River Ridge Community Development District Board of Supervisors · March 24, 2026

Summary

The Board approved MRI Construction Proposal #606, a $3,500 contract to widen the E3 Basin control structure weir to maximum width to improve outflow toward the FPL easement; the engineer will provide before-and-after photographs and investigate a manual gate option.

The Board approved MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure for $3,500. Charlie Krebs explained the work is intended to maximize outflow to the Florida Power & Light easement by using a concrete saw to widen the weir to its maximum allowable width.

Krebs told the Board, "the current control structure going out to the Florida Power & Light (FPL) easement is slightly shy of the maximum width and the proposal entails MRI using a concrete saw to widen the weir width to the maximum to get the most water out of the community." The motion to accept MRI Proposal #606 was made by Kurt Blumenthal and seconded by Bob Schultz and carried unanimously.

Krebs said he will provide before-and-after photographs of the control structure, share project specifications with the Board and inquire about installing a manual open/close gate nearby to offer additional flow control.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source