Board approves $2.77 million low bid for 7-mile R77 resurfacing project

Feb 10, 2026

Hamilton County approved a resurfacing contract for R77 after the county engineer presented three bids; the low bid was $2,774,083.63, roughly $481,832 under the county estimate of $3,015,000.

The full story

Hamilton County authorized the county engineer to sign a contract for a 7-mile resurfacing project on R77, which will extend from the Story County line north to Highway 175. The project scope presented includes milling the top 3 inches of existing surface, placing a 1-inch interlayer and additional HMA lifts for a total new pavement depth of 4 inches, plus pipeline repairs at approximately 22 crossroad locations. The engineer said the work will occur this summer and that the road will remain open with traffic control by flaggers.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in