DRC asks for engineering details on detention basin; basin size could reduce lots
Sep 3, 2026
Committee members stressed the detention basin is still conceptual and that final engineering could increase basin size and reduce buildable area, potentially affecting lot counts; the applicant said engineers will determine final detention needs during detailed design.
The full story
Committee members flagged that the detention basin configuration is conceptual and urged the applicant to provide engineered plans. "Without seeing the engineering of that, we really don't know the configuration of that detention basin in terms of its capacity," one member said, noting that if the basin must be larger it could reduce the number or size of lots.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →