Resident proposes commercial compost facility; engineer flags road and bridge impacts
Oct 8, 2024
A resident, Abe Sanquist, proposed a commercial composting site near Multi-Pig Heron Ave expected to generate about 4–5 semi-truck trips per day; county engineer raised concerns about gravel road and bridge capacity and routing.
The full story
Abe Sanquist requested a meeting with the board to discuss a potential commercial compost facility near Multi-Pig Heron Ave that would convert food waste into fertilizer. Sanquist estimated the operation would see about 4–5 semi-truck trips per day. Supervisors and staff asked about odor control, routing, planning and zoning, and possible local job creation.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →