County commissioner: Upper Cannon River draft study open for comment through Aug. 18

Aug 6, 2026

County Commissioner David Preisler told the council the Upper Cannon River flood-study draft is available for public comment through Aug. 18 and that the draft narrows 36 options to 30, with engineering next steps including culvert resizing, Schmitke rock-arch rapids construction, and potential channel dredging.

The full story

County Commissioner David Preisler presented the county’s Upper Cannon River flood-study draft and urged residents and council members to submit comments by Aug. 18 to ensure options remain eligible for future grant funding. He said the draft evaluates 36 flood-reduction alternatives and narrowed them to 30 viable phased options; six were removed because of cost or low efficacy.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in