Board authorizes survey for County Road A sewer-main replacement project

Jun 10, 2026

Delta 3 Engineering presented a proposed sewer-main alignment timed with county road reconstruction; the board authorized a fall survey to allow design this winter and directed coordination with the county schedule.

The full story

The Village Board on June 10 authorized a survey for a proposed replacement of the sanitary sewer main along County Road A, aligning village work with a planned county road reconstruction. Mark Digman of Delta 3 Engineering said the timing is favorable because a sinkhole on 1st Street and a failed pipe section under State Highway 35 indicate the need for replacement.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in