Get email alerts on the Infrastructure Maintenance topic
No spam. Unsubscribe anytime.
Board approves $3,500 MRI proposal to widen E3 basin control structure
Summary
The River Ridge board approved MRI Construction Proposal #606 for $3,500 to widen the E3 basin control structure weir to maximum width to improve outflow; board requested before‑and‑after photos and asked about a manual gate option.
Get email alerts on the Infrastructure Maintenance topic
No spam. Unsubscribe anytime.
Mrs. Adams presented MRI Construction Proposal #606, which would use a concrete saw to widen the weir at the E3 Basin control structure to the maximum allowable width to improve community outflow. District Engineer Charlie Krebs explained the work and discussed the possibility of installing a manual open/close gate near the control structure.
On motion by Kurt Blumenthal and seconded by Bob Schultz, with all in favor, the board approved MRI Construction Proposal #606 in the amount of $3,500. Mr. Krebs will provide before‑and‑after photographs of the structure, send project specifications to the board, and inquire about installing a manual gate.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
