Board approves $3,500 MRI proposal to widen E3 basin control structure
Mar 24, 2026
The River Ridge board approved MRI Construction Proposal #606 for $3,500 to widen the E3 basin control structure weir to maximum width to improve outflow; board requested before‑and‑after photos and asked about a manual gate option.
The full story
Mrs. Adams presented MRI Construction Proposal #606, which would use a concrete saw to widen the weir at the E3 Basin control structure to the maximum allowable width to improve community outflow. District Engineer Charlie Krebs explained the work and discussed the possibility of installing a manual open/close gate near the control structure.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
or
