Citizen Portal

Get email alerts on the Lake Management topic

No spam. Unsubscribe anytime.

River Ridge board OKs $7,026 repair work order for nano‑bubbler systems

River Ridge Community Development District · April 28, 2026

Summary

Premier Lakes' one‑time work order to repair nano bubble machines and replace nonstandard pumps was approved for $7,026 as a lower‑cost alternative to a $25,000 manufacturer replacement proposal; Lake H1‑B prioritized.

Bill Kurth of Premier Lakes told the board the lakes and dry retention areas (DRAs) "are in good condition," but his inspection identified nano bubbler issues on Lakes H1‑A, H1‑B and E7‑A. Kurth presented a manufacturer proposal to replace nano bubblers for $25,000 but proposed Premier’s One‑Time Work Order to replace two nonstandard 8‑horsepower pumps, an aeration compressor and several check valves as a lower‑cost diagnostic and repair approach.

The board discussed warranty terms, the priority of Lake H1‑B and the difference between Premier's contract terminology and the district’s standard agreement. On a motion by Mr. Blumenthal, seconded by Mr. Twombly, the board approved the amended Premier Lakes One‑Time Work Order Agreement to repair the nano bubble machines on Lakes H1‑A, H1‑B and E7‑A in the amount of $7,026. Staff noted the repair work will make the aeration and pump systems operable to allow fuller evaluation, but additional repairs may still be necessary.

AI generated

The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.

AI can make mistakes, so if you spot one, and we will fix it for everyone.

Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.

Source