Get email alerts on the Lake Maintenance topic
No spam. Unsubscribe anytime.
River Ridge board approves MRI inspections: $65,000 cleaning and $5,800 rip‑rap work
Summary
The Board approved MRI Inspection estimates for diver cleaning of heavily blocked structures at $65,000 and rip‑rap installation in CB‑130 for $5,800. Both motions passed unanimously; the rip‑rap estimate was corrected from the originally referenced CB‑139 to CB‑130.
Get email alerts on the Lake Maintenance topic
No spam. Unsubscribe anytime.
The River Ridge Community Development District unanimously approved two MRI Inspection proposals: Estimate #6583 for diver cleaning of structures with 25% or greater blockage at a cost of $65,000, and Estimate #6604 for rip‑rap installation in CB‑130 for $5,800. Brenda Radford of MRI Inspection LLC presented the proposals and clarified that the rip‑rap work will be performed in CB‑130, not CB‑139 as initially noted.
On motion by Assistant Secretary Kurt Blumenthal and seconded by Assistant Secretary Robert Twombly, both estimates were approved “with all in favor” and the Board directed staff to proceed with contracting. The approvals authorize the district to engage MRI for both the cleaning and the minor rip‑rap installation; staff will follow standard contracting and invoice‑deduction procedures for any related property damages.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
