Feasibility study recommends Metropark site; consultants estimate $30M–$46.6M depending on pool

Jun 3, 2026

Consultants recommended a Metropark site for a Rifle field house/activity center and proposed a multi‑amenity concept; estimates show about $30M for a non‑aquatic facility and roughly $46.6M with an indoor aquatic amenity, with an expected operating subsidy if a pool is included.

The full story

Consultants from Collab Architecture and Studio CKA presented a feasibility study for a proposed Rifle field house and activity center and recommended a preferred site at Metropark adjacent to existing pool amenities. The consultants showed concept plans that include a multi‑court gymnasium, turf area, indoor aquatics, an indoor playground and elevated walking track, and said the building should reflect downtown character and connect to Rifle Creek Trail.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in