Get email alerts on the Stormwater topic
No spam. Unsubscribe anytime.
Board approves $3,500 MRI proposal to widen E3 Basin control structure
Summary
The board approved MRI Construction Proposal #606 to widen the E3 Basin control-structure weir to the maximum width using a concrete saw; the contract was approved for $3,500 and the district engineer will provide before-and-after photos and investigate a manual gate.
Get email alerts on the Stormwater topic
No spam. Unsubscribe anytime.
The River Ridge board approved MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure for $3,500.
District Engineer Charlie Krebs explained the control structure is slightly narrower than the maximum allowed width and said the work would use a concrete saw to widen the weir to maximize outflow. The motion was made by Supervisor Kurt Blumenthal, seconded by Chair Bob Schultz, and passed unanimously. Krebs said he will provide before-and-after photographs and inquire whether a manual open/close gate can be installed near the control structure.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
