Get email alerts on the Drainage Infrastructure topic
No spam. Unsubscribe anytime.
Board approves $3,500 MRI proposal to widen E3 Basin control structure
Summary
The board approved MRI Construction Proposal #606 to widen the E3 Basin control-structure weir to maximize outflow for $3,500 and asked staff for before-and-after photos and scope details.
Get email alerts on the Drainage Infrastructure topic
No spam. Unsubscribe anytime.
Mrs. Adams presented MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure; District Engineer Charlie Krebs explained the work would use a concrete saw to increase the weir width to the maximum allowed to improve outflow. Board members discussed the control structure location near the FPL easement and whether a manual open/close gate could be added.
On a motion by Kurt Blumenthal and seconded by Mr. Schultz, the board approved MRI Construction Proposal #606 in the amount of $3,500. Mr. Krebs agreed to provide before-and-after photographs of the control-structure work and to send project specifications to the board; he also said he would inquire about the feasibility of a nearby manual gate.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
