Get email alerts on the Drainage topic
No spam. Unsubscribe anytime.
Board approves $3,500 MRI proposal to widen E3 Basin control structure opening
Summary
The board unanimously approved MRI Construction Proposal #606 to widen the E3 Basin control structure weir to the maximum width, in the amount of $3,500; District Engineer will provide before-and-after photos and investigate adding a manual gate.
Get email alerts on the Drainage topic
No spam. Unsubscribe anytime.
The board considered MRI Construction Proposal #606 to widen the opening on the E3 Basin control structure. District Engineer Charlie Krebs explained the current control structure is slightly shy of the maximum width where it meets the Florida Power & Light easement and said the proposal calls for using a concrete saw to widen the weir to the maximum allowable width to improve outflow.
On motion by Kurt Blumenthal and second by Bob Schultz, with all in favor, the board approved MRI Proposal #606 for $3,500. Krebs said he will provide before-and-after photographs, send project details and specifications to the board, and inquire about installing a manual open/close gate near the control structure.
AI generated
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
