Norton plans Redi‑Rock repair for Ridge Avenue wall; design authorization approved
Jul 7, 2026
Jul 7, 2026
After consultant review, council authorized design work for a Redi‑Rock wall to stabilize a failed section of Ridge Avenue; the estimated Redi‑Rock repair cost is about $523,800 and council approved up to $40,000–$45,000 for design services.
The full story
City engineers told Norton City Council that a Redi‑Rock facing installed in front of the remaining stone wall is the preferred low‑cost option to stabilize a failing section of Ridge Avenue and limit loss of historic rockwork.
Sign up to keep reading.
Your free newsletter brings you what your city council, county, and school board discussed and decided.
or
Free account
Keep reading for free
Create a free account to finish this story and see the video, transcript and key details.
Continue with GoogleContinue with emailAlready have an account? Log in →