Architect/consultant walks committee through 100% construction documents

Sep 10, 2026

A Tecton representative presented the 100% construction drawings and three-volume specifications for the new 9-1-1 center, highlighted life-safety, structural and acoustic design choices, and identified two bid alternates that could be omitted to reduce cost.

The full story

A Tecton presenter told the committee the team submitted 100% construction documents to the city and walked members through the 108-sheet drawing set and three volumes of specifications, noting code analysis, life-safety provisions, stormwater and grading, and structural brace-frame work appropriate for a public-safety facility. "We submitted, last last week, a 100% construction documents, to the city," the presenter said, and explained the drawings and specifications are complimentary: drawings show where components go and the specifications describe what products are to be used.

Free newsletter

Sign up to keep reading.

Your free newsletter brings you what your city council, county, and school board discussed and decided.

or
Already have an account? Sign in