The Planning and Zoning Commission reviewed a package of zoning ordinance updates to comply with a recent Idaho state statute affecting accessory dwelling units (ADUs), starter-home subdivisions and other land-use rules; commissioners raised questions about sanitation definitions, allowable unit counts, and a tight Dec. 8 hearing deadline.
Discussion Points
•A map of potentially affected parcels was provided and staff noted legal ways the parcel list could change.
•Approval of minutes and schedule were routine; no final ordinance adoptions occurred.
•Commissioners agreed to retain land-use protections such as fencing and setbacks to protect adjacent properties.
•Commissioners requested clarification on what constitutes required ‘sanitation facilities’ for occupancy and whether parking or hookup rules can be local exceptions.
•Commissioners voiced support and moved to approve the schedule.
•Commissioners want explicit limits: e.g., no additional units within an ADU, and limitations on units in the primary dwelling.
•Concerns were raised about potential loopholes that could allow multiple ADUs or extra dwelling units on single lots.
•Draft language may allow internal, attached and detached ADUs to coexist and potentially create more than one additional unit on a lot.
•Staff argued many operational childcare requirements should be enforced via state daycare licensing rather than local code.
•Staff explained schedule adjustments, including moving a July meeting to avoid conflict with the city budget hearing.
•Staff presented ordinance edits to conform to state ADU law and said package must be noticed for Dec. 8 hearing.
•Starter-home subdivisions require minimum four acres and limit unit size to about 1,500 sq ft.
Decisions
•Commission to recommend hearing on starter-home chapter.
•No final vote at work session; packet to proceed to public hearing.
•No formal vote; direction to include updated language in hearing packet.
•No formal vote; direction to staff recorded.
•Procedural motions approved by voice vote.
•Schedule approved by voice vote.
Directions
•Staff to coordinate with city attorney to clarify sanitation/occupancy wording and unit-count ambiguity.
•Staff to coordinate with city attorney to rewrite ambiguous provisions before hearing.
•Staff to include map and findings in hearing packet.
•Staff to keep broad protective language in conditional-use criteria and finalize items removed prior to hearing.
•Staff to post documents and hearing packet information online and in the foyer.
•Staff to prepare findings of fact and public-notice materials for Dec. 8 hearing.
•Staff to publish the schedule on the website and in the civic center foyer.
SciPlan staff and applicants discussed a rezoning request for three parcels at Lansing and Wilson to allow higher-density residential development and two separate building projects: a commercial addition for an addiction recovery provider at 195 Emerald and the replacement of a seminary building at 873 South Fisher. Staff detailed utility, sidewalk, stormwater and permitting requirements and set a December 8 public hearing for the rezoning.
Discussion Points
•Applicant intends to phase the project and may submit a foundation permit first.
•Applicant outlined programmatic needs including offices, group rooms and recreation space.
•Applicant proposed HDR-1 rezoning for affordable housing and described unit types and intent.
•Applicant to demolish and replace the seminary building; project team asked questions about sewer, water, sidewalks and dumpster placement.
•Staff advised on demo permitting, asbestos testing, CCTV inspection of existing service lines and owner responsibility for the service from main to structure.
•Staff raised sewer depth, ownership and availability fee, lot-size minimums and stormwater treatment requirements.
•Staff recommended fencing and dust control during demolition given nearby students and neighborhood concerns.
•Staff set a tentative public hearing date and next procedural steps.
•Staff specified sewer depth/pipe size, availability fee, sidewalk and dumpster-pad requirements, and water-connection cost estimates.
•No permit approved at meeting; staff provided technical clearance conditions and a path to submit required materials.
•Public hearing scheduled for Dec. 8; no final decision taken at this meeting.
Directions
•Applicant to arrange CCTV inspection, contact water department for meter shutdown before demo, obtain separate demolition permit and provide any asbestos testing documentation.
•Applicant to prepare detailed site plan and replat or PUD to meet HDR-1 requirements and file public notices for Dec. 8 hearing.
•Applicant to provide drainage calculations, consult a civil engineer and submit foundation/site-permit materials.
At the Nov. 13, 2026 Blackfoot City Council meeting, staff presented the FY26 financial close and project updates; the Lions Club introduced its local service work and asked for volunteers; council approved Secog to administer two CDBG grants and cleared a road-closure for the Merry Light Parade on Dec. 12.
Discussion Points
•Ambulance overrun attributed to additional wildland fire deployments; BLM reimbursements offset costs.
The Blackfoot City Council met Nov. 13, 2026. Staff presented the FY2026 financial close showing the general fund closed under budget while the ambulance ran over due to wildland deployments; council approved Secog as CDBG grant administrator for downtown revitalization and Sunset Manor elevator work, set parade road closures for Dec. 12, and heard a Lions Club recruitment presentation.
Discussion Points
•15–20 aging service lines need replacement
•Ambulance overrun (102%) due to wildland deployments
•Appointment of Secog as grant administrator
•Authorization for mayor to sign certifications/letters
•Closure start time set for 5:30 p.m.
•Club seeks volunteers and service-project ideas
•Contractor could complete replacements in 1.5–2 weeks
•General fund closed at 92.3%
•Lions Club history in Blackfoot since 1944
•Parade route and start time
•Replacement ties to EPA lead-and-copper compliance
•Revenues expected to offset overruns
•Services offered: health screenings, eye screenings, scholarships ($2,000 each)
Decisions
•Consent agenda approved; no reserve draw anticipated
•Road closure approved
•Secog appointed; staff authorized to sign
Directions
•Authorize mayor to sign grant documents
•Council to consider connecting the Lions with local volunteer needs
•Proceed with audit prep in January, present audit in February
•Staff to implement closure logistics
•Staff to schedule replacements and consider contractor procurement
A site-plan review and informal rezoning discussion for 195 South Hill covered renovation of an existing commercial building, a proposed new shop with leasable bays, utility and street improvements, and a three‑lot subdivision proposal.
Discussion Points
•Applicant plans to renovate an existing building and add a new shop with multiple bays for lease or owner use.
•Applicant requested rezoning and outlined intent to subdivide into three lots.
•City has capacity to serve the property but requires frontage upgrades when new buildings are built.
•Existing rollback curb must be replaced with high‑back curb and five‑foot sidewalk.
•Sewer main depth and type described; sewer availability fee set at $7,000 per residence.
•Staff said formal staff reports and will‑serve letters will follow via the application process.
•Staff will compute fire flow needs once building dimensions are provided.
•The existing water service was identified as likely four‑inch and may not supply required fire flow.
•Utility easements will be required for back‑lot services.
Decisions
•No final action; application accepted for review.
Directions
•Applicant to include frontage improvements in future building permit submissions.
•Applicant to provide easement documentation and address stormwater retention.
•Applicant to refine concept drawings and submit to building/permitting for review.
•Applicant to submit concept drawings with exact dimensions for fire flow calculation.
•City to supply will‑serve letter indicating service conditions.
•Staff will prepare will‑serve letter and conditions for the minor subdivision review.
City staff and an applicant discussed a proposed purchase and redevelopment of 195 South Hill, including renovating an existing building, adding a multi-bay shop, a minor subdivision to three lots and a rezoning request; staff outlined required street, sidewalk, stormwater and utility upgrades and fees.
Discussion Points
•Adding workshop space increases fuel load and may require increased fire flow at hydrants.
•Applicant intends to purchase and renovate 195 South Hill and add a multi-bay shop; plans are preliminary and concept drawings are rough.
•Applicant stated a future plan to place approximately 14 homes behind the commercial parcel.
•Frontage improvements (high-back curb, gutter, five-foot sidewalk) are required up to city standard when new rear buildings are constructed.
•If units are sold individually, separate water and sewer connections are required; private wells cannot supply culinary water for new residences.
•Large structures may require an engineer-stamped structural plan.
•Meter placement must be in a non-driving 'green space' to prevent damage and irrigation meters have separate considerations.
•Parking ratios (e.g., 1 space per 200 sq ft for offices) and lot-coverage will be applied at permit review.
•Sanitation capacity exists but stormwater must be retained on site and a sewer availability fee applies.
•Sewer connection details depend on future plans and will be reviewed in the application process.
•Staff confirmed the application will proceed through minor-subdivision review and will include written conditions and a will-serve letter.
•Staff recalled an existing 4-inch main at the site and said the line may need to be upgraded to 6 inches depending on building size.
•Staff said housing is a separate future application and will be reviewed through the normal process.
Decisions
•No action on housing at this meeting.
•No final determination at meeting; staff guidance will be applied during permitting.
•No formal approvals were granted at this meeting.
•No formal decision taken at this meeting; staff will attach notes to the application and issue standard letters during minor-subdivision review.
•No infrastructure upgrades were ordered at the meeting; staff will calculate needs after receiving plans.
•No permit decisions were made at this meeting; guidance only.
Directions
•Applicant to coordinate meter placement and water connections with utility staff and plan easements as needed.
•Applicant to prepare and submit concept drawings with dimensions to determine permit triggers.
•Applicant to pursue separate applications for residential development when ready.
•Applicant to submit accurate square footage and volume so the fire marshal can perform flow calculations.
•Applicant to supply detailed drawings with exact dimensions to allow infrastructure and fire-flow calculations.
•Staff will attach meeting notes and include will-serve and conditional decision letters during minor-subdivision review.
Planning commission approved a rezoning on South Broadway and a conditional-use permit for an equine veterinary center; neighbors raised infrastructure and notice concerns during public comment.
Discussion Points
•Applicant stated the equine hospital was part of the original proposal.
•Community events and business outreach dates provided.
•Developer said plans are preliminary and dependent on Meridian project right-of-way.
•Neighbor raised concerns about notice and whether initial plans had changed.
•Public commenter asked about Meridian schedule and potential use of cut-off road.
•Staff found C3 consistent with comprehensive plan and adequate infrastructure.
•Staff recommended approval with conditions and detailed EDU/SAF assessment.
•Transcript records chair declarations of passage but full roll-call tallies are not printed.
•Twin Bridges grant application was unsuccessful this round; staff plans to reapply.
•Two motions carried by voice vote with staff conditions attached.
•Well 14 construction fencing and site work underway.
Decisions
•Both actions approved.
•Conditional use permit approved with standard conditions.
•Rezoning approved from MDR1 to C3 for parcel RP1138301.
Directions
•Staff to ensure EDU/SAF accounting prior to permit issuance.
The planning commission approved a rezoning request to change a South Broadway parcel from MDR1 to C3 and approved a conditional-use permit for an equine veterinary center at 301 Ridge Lane after brief public comment about infrastructure and timing of a Meridian Street project.
Discussion Points
•Applicant: stated the equine hospital was proposed from the start.
•Circle K sign variance pending additional variance application and sewer installation delays.
•Developer described flexible development timeline tied to Meridian right‑of‑way.
•Public commenter asked about Meridian project timing and business impacts.
•Resident asked for Meridian project timeline and potential business impacts.
•Resident: concerned about notification and change of adjacent parcel uses.
•Routine approvals of minutes and consent items.
•Staff reported consistency with comprehensive plan and infrastructure capacity.
•Staff said ITD has no funding for Meridian in the next three years; project likely two‑to‑three years out.
•Staff: site suitable and recommended conditional approval with standard conditions and EDU/SAF calculations.
•Trick‑or‑treat downtown set for Oct. 30; business tour Nov. 5.
•Well 14 construction ongoing; twin bridges non‑consumptive water project grant to be re‑applied for next year.
•Zone change and CUP recorded and passed.
Decisions
•Conditional‑use permit approved.
•Minutes approved; consent agenda accepted; zone change and CUP approved.
•Rezoning approved (MDR1 to C3).
Directions
•Applicants must complete recording and acceptance steps for road dedication; staff to track permit applications.
•Coordinate future development with Idaho Transportation Department Meridian intersection project.
•Developers and owners should plan in consideration of ITD schedule.
•Staff to enforce standard frontage/site conditions and confirm sewer assessments (EDUs).
The Blackford Planning & Zoning Commission met to review proposed edits to setback language, common open-space requirements for planned unit developments, and updates to conditional-use permit rules for child daycares to align with recent state statute changes. The commission voted to send the proposed code changes to public notice and approved the draft conditional-use permit amendments.
Discussion Points
•Commissioners debated keeping a 20% common-space target versus lowering to 15% or 10%.
•Commissioners debated using the term 'architectural' versus explicit features and favored simpler wording for clarity.
•Eliminate locally duplicative technical requirements that the state inspection enforces (exits, fencing, indoor square footage rules).
•Raise the city registration/permit thresholds to align with state background-check and licensing thresholds (background checks at four, license at six).
•Require registration with the city business registry for operators so staff can track providers.
•Staff recommended replacing the three-foot formulation with code-aligned language listing cornices, canopies and eaves.
•Staff to allow water superintendent to include capacity findings in staff reports for development applications.
•State statute requires starter-home subdivisions and ADUs in certain residential zones with minimum dimensions (30 ft width, 1,500 sq ft footprint) and density implications.
•Three formal motions to advance items to public notice were made: minutes approval; common-open-space changes advanced with direction to include water superintendent input; daycare CUP amendments advanced to align with state law.
Decisions
•Advance draft to public notice with commission recommendation for stronger common-open-space expectations.
•Advance the conditional-use permit amendments to public notice.
•Items advanced; no final ordinances adopted at this meeting.
Directions
•Staff to draft conforming language and prepare it for public notice before the statutory deadline.
•Staff to prepare public notice, include relevant departmental analyses and return the items for public hearing before final council action.
•Staff to prepare public-notice materials and include clarifications on fees, registry steps, and state point-system impacts in the packet.
•Staff to prepare public-notice materials and include the water superintendent's analysis in the staff report.
•Staff will draft final text aligning with the building code and prepare it for public notice.
Planning and Zoning Work Meeting - October 13, 2026
The Blackfoot Planning & Zoning Commission met to review draft zoning code changes: clarified setback-projection language to mirror building-code phrasing, debated common open-space minimums amid water-capacity concerns and voted to recommend 20%, and revised conditional-use rules for child daycares to align with recent state statutes (raising the local conditional-use threshold to four children and adopting state definitions).
Discussion Points
•Adopt state statutory language for definitions and exclusions (occasional care, family daycare home).
•Commission discussed fee burden and administrative implications for small home providers.
•Commissioners debated 10% vs. 15% vs. 20% minimums and discussed the commission's leverage with city council.
•Commissioners debated using 'horizontal projections' (narrower) vs. 'architectural features' (broader).
•Require registration with the city's business registry to track small providers.
•Staff proposed aligning local CUP thresholds with state statute and to register small operators with the city's business registry.
•Staff proposed replacing a three-foot-projection formulation with building-code wording (cornices, canopies, eaves) to align with the 2018 building code.
•Staff said the water superintendent worried that larger common-open-space requirements could strain culinary water systems.
•Staff summarized statutory minimums for starter-home subdivisions and ADU rules and flagged practical design conflicts with local right-of-way, parking and setback rules.
Decisions
•Recommendation of 20% transmitted for public notice and hearing.
•Set local CUP trigger to four children for family daycare homes; proceed to public notice and hearing.
Directions
•Staff to correct schedule-of-uses table headings and prepare public-notice materials including updated definitions and registration instructions.
•Staff to prepare public-notice package, incorporate Title 39 language into local code, and include fee/notice calculations.
•Staff to refine draft code, correct schedule-of-use tables and return before public notice.
•Staff to remove bay-window mentions and revise setback/projection wording to follow building-code language; circulate revised draft before public notice.
•Staff to update draft to recommend 20% open space and include the water superintendent's analysis in the staff report for the hearing.
Applicant asked the planning staff about annexing a roughly four‑acre parcel near Berkeley Lane and Tanner for commercial use and possible self‑storage; staff outlined zoning options (C2/C3/M1), utility connections, FAA overlay limits, required fees, and deadlines for annexation hearings.
Discussion Points
•Applicant described site, preferred uses, and preliminary layout.
•Curb/gutter/sidewalk requirement is conditional on future city road development.
•Existence of a 12‑inch water main was confirmed.
•FAA pre‑application may be required before conditional‑use review.
•Hydrant requirement contingent on number of units and design.
•Parcel sits in airport overlay; structures over 73 ft trigger additional review.
•Recommendation to align approach with Tanner for traffic control.
•Staff reviewed zoning alternatives and potential permit requirements.
Decisions
•Applicant indicated intent to pursue M1 zoning
Directions
•Applicant to consider alignment consistent with Tanner; town will enforce street standards when road improvements occur.
•Applicant to submit annexation/multi‑use application online; staff to post meeting notes.
•If applicant proposes tall structures or towers, follow FAA pre‑application and conditional‑use procedures.
•Utility details to be addressed at the commercial building permit stage.
A site-plan meeting where an applicant (Jeff) described a four-acre property near Merkley Lane and Highway 91 and requested annexation and a commercial zoning change to allow storage or manufacturing. City staff and utility representatives discussed water, hydrant and gas-main access, street improvement requirements, zoning categories (C2/C3/M1), conditional-use permitting, fees and hearing deadlines.
Discussion Points
•Airport overlay imposes height limits; structures over 70 feet may require FAA coordination.
•Annexation fees estimated at $11,145 plus per‑notice mailing fees.
•C3 would allow commercial uses but requires a conditional‑use permit for commercial self‑storage.
•Existence of a gas main along Murray and a 12‑inch water main in front of the property.
•Filing deadline Oct. 23 for Dec. 8 hearing and later steps for findings and city council scheduling.
•Hydrant requirement may depend on the count of storage units; staff will verify distance and requirements.
•Jeff described site, frontage, proposed uses and preliminary layout options.
•M1 would allow storage outright and may be a preferable zoning choice for the applicant.
•Staff outlined application timeline and noted Planning & Zoning may alter recommendations.
•Staff reviewed zoning options (C2/C3/M1) and permit implications.
Directions
•Applicant advised to file multi‑use/annexation application online; staff to post meeting notes.
•Applicant to consider applying for M1 to permit storage without conditional use.
•Applicant to contact utility representatives (Austin/ Ashley) and city engineering as needed.
•Applicant to file by deadline and prepare notices; staff to post notes online.
•Planning & Zoning to review and recommend a zoning action at public hearing.
The Blackfoot City Council met Oct. 6, 2026. Business included ceremonial recognitions and a police swearing-in, an Arbor Day proclamation, a treasurerudget/investment update, approval of a five-year lease for a Timco street sweeper, a special-permit street closure for a downtown market, tabling of a historical-home renditions proposal, and adoption of Ordinance No. 2301 imposing a moratorium on starter-home subdivisions.
Discussion Points
•Closure from Bridge to Pacific Streets to support small home-based businesses
•Council authorization for mayor to sign
•Council decision to defer until presenter available
•Investment balances and upcoming audit schedule
•Lease-to-own structure with $80,000 annual payment for five years
•Moratorium will stop accepting certain subdivision applications until local ordinance is adopted
•Permit requested by Next Step Forward Foundation for Oct. 23 market
•Preview of Ken Harris' historical home drawings
•Project updates: Meridian Hwy 91, West Bridge Street Bridge, Pendleberry, Bateman Hall, Twin Bridges Landing, wastewater phase three
•Read Arbor Day proclamation and urged planting and care of trees.
•Recognition of Andrew Barabikam for Class One Collection Wastewater Operator certification
•Reintroduction and swearing-in of Officer Jake Yancy
•Replacement of two Elgin sweepers (1992, 1994)
•State statute effective July 1 requires municipal adoption by Feb. 1 for certain starter-home subdivision standards
•Year-to-date spending at ~92% of FY26; department-level expenditures
Decisions
•Item tabled
•Lease approved
•Ordinance No. 2301 adopted; readings waived
•Permit approved
Directions
•Mayor authorized to sign lease
•Staff to coordinate event logistics
•Staff to coordinate future presentation by Mr. Harris
•Staff to draft implementing ordinance language to meet Feb. 1 deadline
City council meeting in Blackfoot covered employee recognitions and a police swearing-in, the Arbor Day proclamation, the treasurer's monthly report and investments, multiple project updates and grant results, approval of a Timco sweeper lease, a special-permit street closure for a downtown market, and adoption of an ordinance imposing a moratorium on starter-home subdivisions.
Discussion Points
•Application presented by staff; described as routine and part of street marketing to support small home-based businesses.
•Audit on-site projected Jan. 20, 2027.
•City\u0002s Build America grant application (~$25M, no match) was not awarded because the project lacked final design/shovel-readiness.
•General fund at 84.8% expended year-to-date; department breakdowns provided.
•Investment balances across several city accounts provided.
•Lease payments budgeted in FY27; meets municipal lease criteria.
•Meridian Highway 91 awaiting state right-of-way and property valuation steps.
•Reading of historical context and benefits of Arbor Day.
•Recognition of Andrew Barabickam's certification at the wastewater treatment plant.
•Reintroduction and swearing-in of Officer Jake Yancey; acknowledgement of his training and local ties.
•Replacement needed because two aging Elgin sweepers cost more in repairs.
•Staff recommended notice via inclusion on regular agendas rather than emergency hearing due to alignment with state action.
•State statute effective July 1 requires municipalities an option to adopt local code; moratorium is a notice/holding action until implementing ordinance language is adopted by Feb. 1.
•West Bridge Street bridge awaiting SHPO approval to move from preliminary to final design.
Decisions
•Council accepted the treasurer's report.
•Motion approved by voice vote.
•Officer Jake Yancey sworn in; no additional council action recorded.
•Ordinance No. 2301 adopted; moratorium in effect.
•Permit approved by voice vote.
•Proclamation declared for September 30, 2026.
Directions
•Approve the permit; staff to manage closure logistics.
•Authorize mayor to sign lease; staff to finalize paperwork.
•Staff to continue design and coordinate with SHPO and state partners to be shovel-ready for future grants.
•Staff to draft implementing ordinance language and schedule public hearings as required before Feb. 1.
Residents and staff discussed a county list, street-department name records and steps for neighborhood building approvals. A resident said they are willing to comply with new codes to get permission to build; staff explained the county will handle subdivision work and asked attendees to scan receipts into the shared folder.
Discussion Points
•Clerk requested scanned receipts be uploaded to the shared/open deck.
•Residents expressed willingness to comply with new codes to pursue building approvals.
•Staff has a county list and street-department names to compare for naming/administrative purposes.
•Staff has county and street-department lists and offered to compare them.
Directions
•Attendees asked to scan receipts and upload to the shared/open deck for staff review.
•Attendees to scan receipts and upload to shared folder for staff review.
Planning and Zoning Commission - September 22, 2026
The Planning and Zoning Commission met Sept. 22, 2026. The commission approved a variance to split 1231 South Meridian into a sublot below current MDR‑1 minimums, granted a conditional use permit for agricultural animals at 1385 South Schilling, and approved a consent conditional use permit for a drive‑up window at 991 West Bridge Street; staff also presented project and city announcements.
Discussion Points
•Commissioners and applicant clarified that current city criteria limit permitted species to horses, cows or sheep and that mixing species is not allowed under the cited criteria.
•Commissioners asked for clarification why existing, older lots can receive variances after new standards are adopted; staff explained variance authority for exceptional, site‑specific circumstances.
•Meridian Highway project is queued by the state and not yet progressing.
•No public testimony or opposition recorded for the drive‑up window.
•Pendlebury Lane construction expected to start in spring next year; city has received FAA grant for airport snow‑removal equipment.
•Seasonal outdoor storage application was withdrawn prior to the consent vote.
•Staff argued the lot predates MDR‑1 standards and is constrained by its configuration; neighboring lots are single‑family homes and nearby zones include commercial and medium density residential.
•Staff emphasized that setbacks and manure‑management requirements would apply when animals are placed on site.
•West Bridge in final design requires relocation of water and sewer lines before demolition and rebuild; Twin Bridges pond mitigation requires coordination with Fish and Game and local groundwater specialists.
Decisions
•Conditional use permit approved with staff‑recommended conditions.
•Conditional use permit for drive‑up window approved on consent.
•Variance approved to reduce minimum lot size to 6,407 sq ft for Lot 1, Block 1 of Harvest Ridge Estates.
City planning staff and applicants reviewed several site-plan and land-use proposals, including a proposed 105-lot starter-home subdivision; staff flagged concerns about secondary access, fire-code interpretation and utility capacity and said the city cannot accept the starter-home plan until the state-model ordinance is adopted or the plan is revised.
Discussion Points
•Applicant described commercial concept; city staff flagged eminent-domain work on Meridian could change parcel layout.
•Applicant outlined small interior remodel and HVAC replacement.
•Applicant presented concept for a 105-lot starter-home subdivision and asked for utility and access feedback.
•Applicant presented four-lot minor subdivision concept.
•City staff require a hydraulic water model (Keller Associates) and a traffic study if the project exceeds 100 units or roughly four acres.
•Fire and building staff raised concerns about secondary access and fire-flow capacity.
•Idaho Power requested square footage and panel-size details to start a service request.
•Planning staff said the city will not accept the plan under the state starter-home ordinance until it is adopted or the Feb. 1 deadline passes.
•Sewer department requested a post-remodel reassessment and gave a contact number.
•Staff observed sewer stubs in Lawrence Lane and flagged sewer availability fee and future curb/gutter obligations.
•Staff recommended C-3 and explained fees, notices and hearing timelines.
Directions
•Applicant to address comments, investigate record easements and return with revised plans and any variance requests.
•Applicant to apply for building permits; staff to post notes to the project portal.
•Applicant to file zone-change application and pay fees by specified deadline; staff to schedule hearing and prepare notices.
•Applicant to start utility service requests and provide final plans and panel sizes.
•City legal counsel to review conflicting code citations (Appendix D vs general code 503 and section 102.10).
•Developer to coordinate a hydraulic model with Keller Associates and provide engineering calculations and plans.
Blackfoot City Council meeting on Sept. 1, 2026: council recognized wastewater staff, held public hearings on downtown revitalization and elevator upgrades, approved a revised fee schedule (Resolution 437), updated several airport hangar lease forms and discussed the SkyRiders arrangement, and approved street-name and development-agreement amendments.
Discussion Points
•Addressing committee recommended name change to reduce affected addresses and align with high school mascot
•Council described increases as nominal and incremental
•Estimated cost and vendor quotes provided
•Honeybrook Three to be split into three phases with stormwater retention and fire-access conditions
•Mayor read proclamations for Constitution Week and library support
•Need to add clear FAA compliance language and proration language for annual billing cycle
•Older leases contained assignment and term issues
•Project is a continuation of Phase One for Broadway between Bridge and Judicial
•Project scope: modernization/replacement of Sunset Manor elevator
•Public comment process for written submissions
•Public hearing opened per statute for fee increases
•Public opposition focused on tree removal, water lines for artificial plantings, sidewalk quality and prioritization of streets
•Recognition of wastewater operators for certification advancements
•Resident testified about impacts on fixed-income households
•Shorter, non-automatic leases suggested for SkyRiders hangar given city ownership and lack of tenant investment
Decisions
•Adopt Resolution 437
•Approve addressing change and Honeybrook Three amendment
•Approve updated lease form and authorize amendments
•public hearing closed with no action taken
•public hearing closed with no speakers
Directions
•Authorize mayor to finalize lease language
•Notify affected residents and implement addressing change on schedule
•Prepare phase-specific development agreements
•Publish and implement revised fee schedule effective Oct. 1, 2026
•Staff to negotiate with Natalie Ringamon for instructional use
The Blackfoot City Commission approved a conditional-use permit for a drive‑up window on West Bridge and tabled a proposed seasonal RV storage conditional‑use permit after resident concerns about traffic, stormwater and operations.
Discussion Points
•Airport grant prospects tied to FAA safety needs and walkway relocation.
•Applicant described lane lengths, pedestrian access and operational measures to prevent off‑site queuing.
•Commissioners asked about map orientation and monitoring of potential stacking into West Bridge or Bergner Drive.
•Commissioners asked for more operational and liability details before acting.
•Commissioners: debated whether the city should provide storage, whether six spaces would meaningfully help, and the lot's stormwater function.
•Public: nearby resident worried about traffic, enforcement, who collects fees and liability for vandalism or damage.
•Resident asked who would regulate payments and access and expressed traffic concerns.
•Staff: proposed seasonal operation April 1–Oct. 31, limited to Champions Gate residents, six lanes, no maintenance, site must remain pervious for stormwater.
•Staff said reservations/payments could be handled online as with the airport RV park and leases could impose further restrictions.
•Staff said the plan meets drive‑up criteria and identified conditions to prevent queuing off‑site.
•Wastewater treatment plant entering phase three to address phosphorus limits.
Decisions
•Conditional‑use permit approved with staff conditions.
•Drive‑through CUP approved; RV storage CUP tabled.
•Item tabled until next month.
Directions
•Staff to monitor traffic, coordinate with sanitation and public works if complaints arise.
•Staff to provide additional information on tabled items.
•Staff to provide additional operational details (fees, lane marking, insurance, access control) and return next month.
•Staff to return with operational plan detailing fees, enforcement, insurance and lane marking.
Planning and Zoning Work Meeting - August 11, 2026
A Planning and Zoning Commission work session covered street-name recommendations (Bronco Way/Circle), proposed setback measurement clarifications, common-space minimums for subdivisions, street-lighting requirements, playground safety standards, DEQ approval timing and development-agreement enforcement, and several procedural items including approval of minutes.
Discussion Points
•Commissioners argued 10% is insufficient and criticized vague exceptions allowing reductions for 'exceptional public benefit'.
•Commissioners asked whether residents had been contacted and whether house numbers would change; staff said house numbers would not change and residents would get 90 days' notice.
•Commissioners asked who would fund future upgrades if HOAs dissolve and whether the city would inherit costs.
•Commissioners cited inconsistent lighting in recent subdivisions and requested model standards.
•Commissioners questioned corner-lot exception language and asked for clearer differentiation between interior and corner lots.
•Staff confirmed that street lights are required under Title 12 and that the street superintendent determines specifics.
•Staff noted misalignment of York Drive across Walker Street created dispatch hazard and estimated notification counts (approx. 32 vs 15).
•Staff proposed a 10% minimum permanent common space with possible council increases to 20%.
•Staff proposed measuring setbacks to the exterior face of building walls rather than to eaves or nearest points.
•Staff proposed requiring playground equipment to meet current CPSC handbook and technical standards before dedication.
Decisions
•Motion to rename approved; forwarded to city council for documentation.
Directions
•Staff to clarify maintenance-assurance text and responsibilities for post-dedication upgrades.
•Staff to place recommendation on city council agenda and follow up with dispatch and notifications.
•Staff to research model street-lighting language (e.g., Idaho Falls) and propose Title 12 insertions.
•Staff to revise language to clarify standards for reductions and ensure maintenance assurances are explicit.
•Staff to rewrite the corner-lot exception language and clarify projection measurements in the draft code.