Water Pollution Control Authority 10-19-2026
Norwalk WPCA meeting on 2026-10-19: the board approved a 3-year, up-to-$750,000 extension with Wright Pierce for engineering on pump stations, created a dedicated operating account and transferred funds for 493 Connecticut Avenue, reviewed construction and engineering project updates (Beacon Street, Keeler Brook, sewer separation), and heard a storm-response briefing on the Sept. 13 extreme rainfall that produced 19 sewer overflows.
AI-Generated Content
The text on this page is AI generated. Summaries, highlights, analysis, and video transcripts are all produced from the original source material.
AI can make mistakes, so if you spot one, and we will fix it for everyone.
Note: the source content is unaltered by us. Any content source we link to, be it a video, an audio recording, or a document, is presented exactly as its publisher released it. That publisher is usually a government body, sometimes an individual official or another organisation.
No transcript available.
