Citizen Portal
Sign In

Mid-Kings River GSA Meeting (07/28/2026)

Mid Kings River Groundwater Sustainability Agency · July 29, 2026

At its July 28, 2026 meeting the Mid Kings River Groundwater Sustainability Agency heard consultant updates on well registration, subsidence and model work; learned the state is preparing an interim plan that could include a pumping moratorium along the Frank Kern Canal; and the board accepted Prop 218 engineers report and Prop 26 cost-of-service study and set public hearings for Sept. 29, 2026.

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.