Webster Board of Selectmen met Nov. 9, 2026. The board approved a single tax classification for FY27, appointed a full member to the Zoning Board of Appeals, suspended a liquor license for 120 days after unsecured alcohol was left during demolition, approved a liquor-license transfer to KP Market, granted National Grid permission for a utility pole, and heard presentations on MassTrails and MassWorks grants and the town's strategic planning process.
Discussion Points
•Applicant counsel outlined multi-site experience and manager training plans.
•Board asked clarifying questions about location and reliability benefits.
•Board discussed converting strategy into near-term annual priorities for FY28.
•Board members raised public-safety concerns because site is near the library and young people.
•Board members requested comparators for neighboring towns.
•Board questioned ABCC timing and construction schedule.
•Chief Shaw presented photos and bodycam evidence of about 100 bottles left unsecured after demolition.
•Committee meetings set for Nov. 19 and Dec. 10 to finalize goals and actions; a shorter public-facing document will be prepared.
•Five strategic focus areas were identified and draft goals and actions are being developed.
•License holder said inventory was to be transferred and blamed construction workers.
•MassTrails study aims to connect Webster to regional rail-trail network and assess off-road/on-road alignments; TEC has completed desktop review and begun field work.
•MassWorks grant would fund 25% design of Main Street corridor and a road-safety audit targeting a pedestrian crash cluster.
•Members sought assurance that suspension would not unfairly block a lawful transfer.
•National Grid explained that a new pole will allow remote sectionalizing to backfeed customers and minimize outages.
•Public outreach (February workshop and online survey) is central to both projects; survey will be available in multiple languages.
•Staff presented examples showing how a split rate would shift tax burden to commercial/industrial classes.
•Town property values rose about $145 million to about $3.039 billion.
Decisions
•Approved single (one-rate) tax classification for FY27.
•Board approved the petition.
•Continue the committee process and prepare a draft for board review before end of February.
•License suspended for 120 days; board may lift suspension if transfer conditions require it.
•Local approval granted; ABCC review remains necessary before operations begin.
•Proceed with community outreach and continue grant-funded design and evaluation work.
Directions
•Consultants to launch survey, provide paper copies at town locations and schedule a February visioning workshop; staff to encourage outreach methods to maximize responses.
•Staff to circulate prior goals and draft strategic goals; schedule a short session with board and town administrator to set five priorities for the remainder of the fiscal year.
•Staff to compile comparative DOR data on neighboring communities' use of split vs. single rate for next year.
•Town staff to coordinate permit details with National Grid and DPW.
•Town staff to forward local vote to ABCC and monitor transfer progress.
•Town staff to notify ABCC and monitor the transfer process; report back to board if transfer issues arise.
The Webster Zoning Board of Appeals heard appeals on the Nipmuc Ski Club cease-and-desist order, an interpretation dispute over 0 Eastern Ave, and a special-permit review of an oversized garage at 16 Robinson St.; the board continued the Nipmuc hearing to Dec. 1, 2026 and set a December decision date for Robinson Street.
Discussion Points
•Abutters described blocked light, runoff and alleged undisclosed occupied/party space in the as-built garage.
•Applicant argued nonprofit educational use and long-standing presence; residents disputed occupancy and intensity.
•Board requested documentary proof from applicant and evidence of MassDOT permission.
•Board reviewed findings and criteria for practical difficulty.
•Court remand limits the board’s review to the part of the structure exceeding the original plan.
•Engineering testimony quantified excess volume (~4,000 cu ft) and examined neighborhood comparables.
•Interpretation centers on whether 'structure' is singular in bylaw and how transition-district setbacks apply.
•Members agreed the deck could be allowed under variance standards.
•Neighbors alleged frequent use beyond the club’s claimed schedule and property damage from wakes.
•Parents and club volunteers described training, certified instructors, background checks and community performances.
•Town counsel outlined standards for standing, pre-existing nonconforming use, and Dover Amendment protections.
•Town counsel said one principal structure per lot is common reading, but compliance could be achieved with a single four-unit building.
Decisions
•Hearing closed; decision scheduled for December.
•Hearing continued to Dec. 1, 2026
•Public hearing closed; board to deliberate on decision.
•Public hearing continued to Dec. 1, 2026 at 6:00 p.m.
•Variance granted; Wigglesworth authorized to sign decisions.
Directions
•Applicant to submit MassDOT email/letters and documentation of programming by Nov. 30, 2026.
•Board asked applicant to submit staff qualifications, program descriptions and evidence of MassDOT communications before Dec. 1.
•Staff to place item on Dec. 1, 2026 agenda and circulate submitted materials to board.
•Staff to prepare draft decision and findings for December meeting; board to deliberate on whether the excess volume is 'substantially more detrimental.'
•Staff to prepare draft decision and process signatures.
The Webster Planning Board on Oct. 26, 2026 continued a public hearing on an 8‑lot subdivision at 70 Gore Road after extended discussion of three road/landscaping options, waivers, stormwater and tree preservation. The board approved two routine items, accepted a withdrawal on a completeness request, and set the subdivision to continue to Nov. 30 for revisions and peer‑review signoff.
Discussion Points
•Applicant said waiver requests were motivated by environmental and watershed protection concerns.
•Board questioned emergency access, tree spacing, impervious coverage and stormwater treatment.
•Engineer presented three road/layout options and described existing erosion into Webster Lake.
•Owner paid outstanding engineering bill and will revise parking lot design.
•Planner explained notice procedure for companies with interests in other towns.
•Staff reviewed the endorsement package and conditions on the last two pages.
Decisions
•Hearing continued to Nov. 30; no final approval granted.
The Webster Conservation Board met to review planning and zoning results, discuss comprehensive plan timing and public hearings, review stormwater and site-review practices, and consider outreach initiatives including a pollinator partnership and a tree-planting effort.
Discussion Points
•A Fairlife partnership could support pollinator gardens with park and community-group involvement.
•Board will track outstanding engineering and environmental conditions noted in site reports.
•Committee will compile public feedback and consider revisions before recommending to the town board.
•Engineers reclassified a site feature as bioretention and traced drainage to a town easement.
•Large unsolicited donation of seedlings (reported ~16–18) and plans for care and planting.
•Proposal to create videos and improve website visibility for documents.
•Public hearing moved to November due to scheduling conflicts.
•Staff reported multiple planning-board decisions including a 135-foot tower approval and tabled applications.
•Tree City USA standards considered achievable but some require code amendments.
•Wetland determinations can be delayed by court actions, increasing the importance of local site reviews.
Directions
•Board to pause formal Tree City push until comprehensive-plan/code issues are resolved.
•Conservation board to document and flag potential wetlands during site visits.
•Make the revisions spreadsheet and key documents more prominent on the project website.
•Parks department to care for seedlings and staff to coordinate planting sites and a ceremony.
•Project-review committee to confirm status of open items and wetland/permit conditions before final approval.
•Staff to confirm closure of outstanding site-review comments prior to final approvals and to raise tree-marking and permit conditions at preconstruction meetings.
•Staff to coordinate with parks department and community partners to schedule planning meetings and clarify funding/maintenance.
•Staff to make the revisions spreadsheet more prominent on the project website and notify board members of the new hearing date.
Town meeting in Webster, Mass., covered six articles including capital repairs to Fire Station 2, a new town-hall LED sign, and multiple wastewater projects; each article passed by voice/electronic vote after public questions about bids, funding and project scope.
Discussion Points
•$20,000 of the appropriation covers the study; remainder covers full design.
•Building commissioner recommended accelerating the project; scope includes roof, gutters, front door, tree removal, fence replacement.
•Current sludge disposal contract and capacity limits are causing cost increases.
•Design funds will come from sewer retained earnings.
•Drying sludge into a cake would provide more disposal options and potentially mitigate rising hauling costs.
•Existing chlorination system dates to 1950s and stores ~2,500 pounds of chlorine gas on site.
•Finance committee members requested itemized cost estimates and spending plan.
•Finance committee members requested itemized receipts and clarifications about retained earnings and reimbursements.
•Interceptor shows concrete failure and leaking bell joints; repairs have been temporary.
•Procurement thresholds and bid process will determine vendor and schedule.
•Resident requested itemized bids and spending plan.
•Residents asked about advertising the farm stand and local events.
•Residents asked whether drinking water is affected; superintendent said it is not and is tested regularly.
•Sign structure is deteriorated and screens have failed; replacement recommended.
•Town administrator and town accountant confirmed later procurement and accounting steps will be public.
Decisions
•Appropriation approved; design phase funded.
•Appropriation approved for design/repairs; vote recorded 60-0.
•Appropriation approved; procurement and signage content to follow.
•Appropriation for design approved; construction to be decided later.
•Supplemental design funding approved; construction funding to be pursued later.
Directions
•Proceed with full design; return to town for construction appropriation based on bid estimates.
•Proceed with study and design; return to town for construction funding after design complete.
•Proceed with supplemental design to complete scope and cost estimates.
•Town accountant to maintain financial records and report reimbursements affecting retained earnings.
•Town will solicit bids and award contract publicly; town accountant will make records available.
•Town will solicit quotes and follow procurement rules; content decisions deferred until sign is erected.
The Webster Conservation Commission on Oct. 13, 2026 continued a Notice of Intent for 15 Lakeview Road and approved twin Notices of Intent for 25A and 25B Goddard Street with conditions including camera inspection/cleaning of storm systems, repair of a broken pipe, wetland markers and a two‑year monitoring requirement. The board also approved minutes, continued the 2027 schedule decision, and reviewed an enforcement update for 25 South Shore Road.
Discussion Points
•Board agreed to resume the matter at Oct. 26 meeting.
•Board requested clearer attendance notation and clarification that a deck was rebuilt, not rehabilitated.
•Board required camera inspection/cleaning and DPW coordination before restoration work.
•Chair noted the engineer already presented earlier and recommended a continuance.
•Engineer reported missing wetland restoration, possible broken storm pipe discharging sediment, and unverified subsurface chambers.
•Fines at 25 South Shore Road paid by homeowner; contractor not responding to notices.
•Staff will research options and return with follow‑up plans.
•Two‑year monitoring and 75% survival standard to receive Certificate of Compliance.
Decisions
•Approve corrected minutes (motion passed).
•Approved 25A and 25B with special conditions (each 6–0).
•Continue item for further follow up.
•Continue to Oct. 26
Directions
•Applicant to perform camera inspection and submit as‑built plans; coordinate pipe repairs with DPW.
•Members to suggest outreach options for the next meeting; staff to prepare enforcement options.
•Staff to draft precise condition language and relay DEP file numbers to applicant.
•Staff to insert a break and attendance note and update wording in minutes.
The Town of Webster Zoning Board of Appeals met on Oct. 6, 2026. The board approved minutes, reorganized and confirmed a clerk, set its 2027 meeting schedule, directed staff to submit Chapter 91 comments for 325 Thompson Road, continued the Nippon Ski Club appeal to Nov. 4 with an extended decision deadline, and closed the public hearing on a variance for 175 Kildeer Road (decision expected Nov. 4).
Discussion Points
•A Chapter 91 application requires municipal comments to be filed with DEP by a stated deadline.
•Applicant argued unique lot shape and interior sliding doors justify practical difficulty.
•Applicant requested continuance to assemble engineering and legal materials.
•Board preference to keep current meeting structure.
•Property at 325 Thompson Road is adjacent to an existing marina and is in B5 zoning where new marinas are generally not allowed.
•Residents testified alleging commercial operation, excessive hours and safety hazards in the cove.
•Resignation of previous clerk and need to appoint a clerk.
•Staff reported no departmental objections; neighbors contacted showed no opposition in that outreach.
Decisions
•Appointed Maxton McMahaffey as clerk; approved preliminary 2027 meeting schedule.
•Board authorized staff to file comments and sign on behalf of the board.
•Continue hearing to Nov. 4 and extend decision deadline to Jan. 6.
•Public hearing closed; decision scheduled for Nov. 4.
Directions
•Board scheduled hearing for Nov. 4 and directed staff to accept additional materials before that date.
•Board to consider variance criteria and prepare findings for Nov. 4 decision.
•Maintain preliminary 2027 schedule with right to amend.
•Staff to prepare and submit comments and sign the municipal zoning certificate; keep town comment period open to Oct. 19.
The Webster Planning Board reviewed and approved site-plan decisions for 56 Main Street and several routine completeness and subdivision items; it opened and continued a contentious public hearing on a proposed 8‑lot subdivision at 70 Gore Road (Spalding Way), extended that application's decision deadline to Dec. 29, 2026, set the next hearing for Oct. 26, and approved minor administrative changes to its 2027 schedule.
•Landscaping installed but shifted; proposed fence not installed; security achieved via lighting and cameras; peer review account funds to be returned.
•Residents raised shoreline and easement concerns and safety concerns about an 8% road slope; board asked for a landscaping plan and waiver clarity.
•Staff confirmed the split met frontage (50 ft) and lot size requirements; mobile home relocation noted.
•Staff requested board input on the marina filing; members discussed comment options.
•Staff updated exhibits and findings; applicant added an off‑street customer parking spot; waiver no longer required; conditions added for plantings, dumpster, erosion controls and stormwater maintenance; board reserved right to request post‑occupancy traffic study.
Decisions
•Accept extension to 12/29/2026; continue hearing to Oct. 26 at 6:30 p.m.
•Approve A& R.
•Approve site plan and conditions; authorize designee to sign.
•Continue application.
•Determine complete; return funds.
•No formal board comment recorded at meeting.
Directions
•Applicant to provide landscaping plan, revised waiver sheet, and responses to sewer/water peer review comments; staff to coordinate DPW and conservation commission reviews.
•Continue to Oct. 26; staff to notify applicant and request restoration of funds.
•Members may forward comments to staff for submission before deadline.
•Staff to file approval documents and notify applicant.
•Staff to finalize decision documents and exhibits and prepare signature authorization for designee.
•Staff to process return of unused peer review funds.
The Webster Finance Committee met Sept. 21, 2026, reorganized its leadership, heard a year-end finance report and voted recommendations on six town-meeting warrant articles including capital projects for the fire station, town sign and multiple wastewater studies and designs.
Discussion Points
•Existing sign's brick support and LED panels are deteriorated; replacement would improve visibility.
•Funds to be used for feasibility study and engineering to determine repair/replacement options.
•FY26 books closed Sept. 10; balance sheet drafted for Department of Revenue.
•Members requested clearer cost breakdowns in the town meeting guide.
•New chair outlined goals to run meetings efficiently and in compliance with state law, asked members to address comments through the chair.
•Purpose: study/design to determine actual construction cost and compliance needs.
•Resident asked about a $4.5M increase in spending and requested itemized lists.
•Scope: roof, gutters, front door, tree/fence removal and incidental costs.
•Several funds showed negative balances at June 30; town awaiting ~$1,000,000 in PFAS reimbursements that could change certifications.
•Site review documented ~270 linear feet of exposed pipe and additional 45 linear feet.
•Synagro indicated it would not renew the contract at the conclusion of the existing term (understanding: Oct. 2027).
•Tim said funding proposed from cable-TV fund (fees from Spectrum/Charter).
•Town is contracted with Synagro to haul sludge to Woonsocket; Synagro experienced operational challenges and Woonsocket has moved away from accepting merchant sludge.
Decisions
•Committee recommended Article 2 (5–0).
•Committee recommended Article 3 (5–0).
•Committee recommended Article 4 (4–1).
•Committee recommended Article 5 (5–0).
•Committee recommended Article 6 (4–0–1).
•New chair and vice chair elected.
Directions
•Finance director to update schedules and submit balance sheet once reimbursements are received; staff to monitor divisional backlog and auditor schedule.
•Follow parliamentary procedure; address questions through the chair.
•If funded, department to provide itemized costs and supporting quotes to the committee.
•Proceed with design funding recommendation to evaluate dewatering options and future disposal strategies.
•Proceed with design study if town meeting approves funding.
•Proceed with funding recommendation from cable-TV fund; IT to finalize quotes.
•Staff to provide a more detailed breakdown of study components and estimated costs before town meeting.
Regular Webster Board of Selectmen meeting including a ceremonial presentation, a police swearing-in, votes on municipal property and utility pole petitions, several appointments, a strategic master plan update, and administrative reports.
Discussion Points
•Board asked about drawing accuracy and whether the updated plan matched prior public hearing materials.
•Board discussed using the lot for future river access and DPW cleanup.
•Board members expressed support and moved to appoint.
•Committee outlined next steps (meetings Sept. 24 and Oct. 15) and planned interviews with property owners and consultants.
•Committee reported focus-group and survey results highlighting lake and mill heritage.
•National Grid clarified sketch corrections and emphasized system reliability.
•Request to discharge lien to allow sale completion.
•Staff asserted town would not lose funds under the discharge.
•Staff said parcel had long tax-title history (since 1955) and low expected sale value.
•Staff summarized Supreme Court-driven changes to tax-title law and appraisal requirements.
•Waitrich described conservation interests and family background in wildlife rehabilitation.
Decisions
•Appointment approved.
•Board voted to approve the petition.
•Board voted to discharge the lien.
•Board voted to retain the parcel for municipal purposes.
The Webster Zoning Board of Appeals met Sept. 8, 2026, to consider an appeal related to a ski-club property at 235 Thompson Road; the board agreed to continue the hearing to Oct. 6 and—by written extension—extend the 100-day decision deadline to Dec. 2, 2026. The board also approved minutes from May 5 and June 2 and adjourned.
Discussion Points
•Applicant agreed to sign written extension form at meeting.
•Applicant requested continuance of hearing to Oct. 6 at 6:00 p.m.
•Chair explained statutory 100‑day decision timeline and proposed extension to Dec. 2.
•Members reviewed minutes and found no errors.
Decisions
•Approve minutes from May 5 and June 2.
•Continue appeal hearing to Oct. 6 at 6:00 p.m.; extension of decision deadline to Dec. 2, 2026, by written agreement.
Directions
•Applicant to provide signed written extension to extend 100‑day deadline to Dec. 2, 2026.
•Board to hold full hearing on Oct. 6 and then file decision under the extended timeline if needed.
Town board meeting with public comments on school displays and infrastructure, a lengthy SEQR debate leading to a negative declaration for the Webster Transportation Infrastructure Project, discussion of a police-captain benefits resolution that passed, and several routine financial approvals.
Discussion Points
•Citizen argued for consistent standards for government displays of group symbols.
•Citizen reported flare of excess biogas at wastewater plant and urged revisiting a defeated renewable natural gas project (previously voted 3–2).
•Members added clarifying language to the contract text before vote.
•Members discussed returning round-table public interactions; Chair said they remain suspended pending HR concerns.
•Position created previously by resolution; not a union position; goal to mirror union benefits to retain leadership.
•Public commenters urged a positive declaration and EIS due to Toyota Drive extension and culverting impacts.
•Routine approvals proceeded without substantive debate.
•Student reported repeated exposure to Pride messaging at school and requested equal consideration for students with different religious beliefs.
•Town engineer said staff lacked completed responses to questions until late and could not fully answer certain legal nuances (e.g., parkland alienation).
Decisions
•Approved minutes, finance items, asset recycling; moved into executive session.
•Board classified project as Type 1 under SEQR and issued a negative declaration.
•Resolution passed authorizing supervisor to execute contract.
Directions
•Authorize supervisor to sign the benefits contract.
•Board asked staff to complete outstanding responses and to monitor potential schedule and reimbursement impacts.
•Record routine approvals; follow up on HR meeting regarding complaints.
•Staff to follow up with the speaker if contact information provided to the clerk.
The Webster Planning Board met Sept. 1 to consider multiple business sign permits, exterior lighting at Bloom and Blend, two Verizon cell-tower applications (Webster North at 1222 Wildflower Drive and Lake Road at County Line Road) and a preliminary plan for a building addition; the board approved several signs and lights and tabled both Verizon tower applications and the building addition to Oct. 6 for further review.
Discussion Points
•Applicant agreed to prepare requested material and work with town engineer.
•Applicant argued a 135‑ft monopole is necessary due to coverage and capacity gaps; independent RF consultant generally corroborated coverage gaps.
•Applicant confirmed fixtures are downward pointing, non‑flashing, app‑controllable and may be dimmed.
•Applicant: mid‑band capacity and terrain/tree canopy warrant a taller structure than code's 100 ft standard in this area.
•Applicants described materials and mounting and confirmed non‑flashing and downward‑directed lighting for illuminated signs.
•Board classified each action as SEQR Type II and approved the permits after brief discussion.
•Board reviewed outdoor lighting code for nuisance and spill control.
•Residents and local counsel: questioned completeness of site‑selection analysis and documentation from the landowner (Windmill Farms).
•Residents raised concerns about tree removal, visual impact, property values and health effects; applicant noted legal limits on consideration of RF health effects where FCC compliance shown.
•Town engineer requested SWIP/drainage calculations, ADA/sideswalk details, ingress/egress details, and fire sprinkler requirements.
Decisions
•Application tabled to Oct. 6 pending resolution of engineer comments.
•Application tabled to Oct. 6; public hearing remains open.
•Application tabled to Oct. 6; public hearing remains open; applicant permitted to proceed to Zoning Board of Appeals concurrently.
•Approval granted; classified SEQR Type II.
•Approvals granted for all four sign applications as presented.
Directions
•Applicant to submit SWIP and engineering corrections prior to Oct. 6; town engineer will review.
•If cleared, applicant may seek preliminary and final approval on Oct. 6.
•Planning staff and consultants to continue analysis and circulate supplemental RF materials to board members before Oct. 6 meeting.
•Proceed with installation; staff to confirm orientation if complaints arise.
•Staff to confirm monument setback with applicant for the McKelpin site prior to permit issuance.
•Staff to request more detail on alternative sites, outreach logs and lease constraints; consultant follow‑up ahead of Oct. 6.
The Webster Conservation Commission met Aug. 31, 2026, hearing requests for dock installations at two properties, reviewing a multi‑phase repair of the Point Breeze marina with fuel‑handling concerns, discussing several retaining‑wall and demolition proposals along Webster Lake, ratifying an enforcement order at 12 Cooper Road, and receiving a staff report on a local stream discoloration event.
Discussion Points
•Agent said the dock was off the navigable channel and plans included necessary profiles and dimensions.
•Applicant described stepping the wall back to reduce in‑water work and to meet setback guidance.
•Applicant described two‑phase approach with turbidity controls and upland jacking/I‑beam stabilization.
•Commissioners repeatedly pressed on tank inspections, groundwater, and the need for on‑site spill response.
•Commission requested planting/mitigation plan and verification of setbacks.
•DEP flagged that the proposed wall length likely constitutes bank alteration requiring WPA Form 3 and wildlife habitat evaluation.
•DEP reviewed and advised the pond owner about downstream liability and discouraging discharge into connected streams.
•Discussion clarified what 'temporary' meant under Chapter 91 and noted seasonal removal for ice.
•Homeowner and neighbors assisted in placing silt fence and rock armoring.
•Members had no substantive technical objections.
•Staff observed sediment transport following storms and required immediate erosion controls.
•Staff recommended a negative determination based on plan contents.
•Staff recommended moving the wall landward to reduce dewatering and in‑water work.
•Staff traced a blue dye to a product marketed for pond muck control used in an upstream pond that feeds into Brown Brook.
Decisions
•Approve with special conditions; applicant to submit documents within one week.
•Continue to allow applicant to address DEP comments.
•Continue to Sept. 14.
•Enforcement order ratified 6–0; stabilization measures appear to be reducing sediment.
•Negative determination approved 6–0.
Directions
•Agent to file the negative determination and notify applicant.
•Applicant to provide a written construction sequencing document with decision points and an emergency response plan including fire‑department recommendations.
•Applicant to provide Chapter 91 filings if required.
•Applicant to provide revised drawings and dewatering details before Sept. 14.
•Applicant to revise plans and provide additional sediment control, dewatering and planting/mitigation details.
•Continue to Sept. 14.
•Staff sent a letter advising the pond owner and will continue to monitor the downstream reach.
•Staff to continue monitoring; commission ratified enforcement order.
•Staff to draft order conditions reflecting those items.
Webster Board of Selectmen meeting (Aug. 24, 2026) covered routine approvals, a public hearing on a used-car dealer license for 1 East Main Street, three National Grid pole petitions (two approved, one tabled), several board appointments, rescission of a downtown liquor license, a strategic master plan update, and town operational updates including an oversized load through town and a bridge ribbon-cutting.
Discussion Points
•Applicant described plan for up to eight sale vehicles, one employee parking space and two customer spaces; engineer to prepare detailed site plan.
•Board asked for updated sketch for South Main Street and tabled the petition.
•Board expressed appreciation and noted specific areas where appointees can assist (historical preservation, cultural programming).
•Brief remarks from each prospective appointee about local ties and volunteering.
•Full committee meeting scheduled Sept. 24 to review results; follow-up meeting Oct. 15 to draft goals.
•National Grid explained each petition’s purpose (road reconstruction on May Street; internal reliability on Bigelow Road).
•No public opposition recorded during the hearing.
•Oversized load routing and timing through Webster on Aug. 31–Sept. 1 with a stopover and subsequent movement.
•Planning Board special-permit and site-plan approval is required before Selectmen will grant a Class 2 license.
•Records-retention work per Secretary of State schedules is underway; budget process to begin early in September.
•Selectmen raised traffic and turning concerns at the East Main/North Main intersection and recommended right-turn-only exit as a mitigant.
•SOAR exercise completed on July 30; consultant and committee will synthesize results.
•Temporary bridge is open and ribbon-cutting scheduled Aug. 28 at 3:45 p.m.
•Three focus groups completed/ongoing; public short survey to be released via Civic Alerts.
Decisions
•All four appointments approved by voice vote.
•Continue data-gathering; next committee milestones set for Sept. 24 (review) and Oct. 15 (goal drafting).
•May Street and Bigelow Road petitions approved; South Main Street tabled.
•No formal votes; informational updates and direction to staff to notify the public.
•Public hearing closed; board requested reapplication after Planning Board action.
Directions
•Applicant to obtain Planning Board site plan and special permit and reapply to the Selectmen with the approved site plan.
•Committee to publish survey and continue outreach; staff to circulate focus-group links and survey reminders.
•Staff to publish oversized load route and timing online and distribute ribbon-cutting logistics to board members.
•Staff to request updated sketch from National Grid for South Main Street petition and schedule a new hearing when materials are available.
•Town Clerk to administer oath and complete onboarding.
The Webster Conservation Commission met Aug. 17, 2026, reviewed multiple lakeside projects, approved repairs at 200 Kilder Road and Notices of Intent for 20/22 Lakeside and an amended order for 270 Kilder Road with conditions, continued several items, and handled staff updates and enforcement scheduling.
Discussion Points
•Agent described deck collapse and dry‑laid block wall replacement plan; contractors unfamiliar with lakeside erosion controls.
•Applicant will replicate wetland area and use bottomless culvert; test pits and replication elevations required.
•Board requested additional plantings and updated drawings; applicant agreed to four additional plantings and to provide as‑built documentation.
•Commission agreed to continue enforcement item for monitoring.
•Continuances requested where DP numbers or full board presence were missing.
•Erosion controls, track pad, spill kit and porta‑potty required; no stockpiling in resource area; permanent wetland signage to be installed.
•Minutes for July 6 approved; August 3 draft to be considered at next meeting.
•Project team explained the after‑the‑fact wall and confirmed it remains outside the floodplain.
•Special conditions added to ensure no heavy equipment, no beach sand addition, and staff verification of silt fence placement.
•Staff reported specific tree removals and asked that reasons and replacement ratios be recorded in notes.
Decisions
•Amended Order approved with conditions; follow‑up required prior to continued work.
•Continue enforcement matter; require documentation of tree removals and one‑for‑one plantings where applicable.
•Continue multiple hearings to Aug. 31; approve July 6 minutes.
•NOI approved with special conditions; follow‑up plans and verification required prior to ground disturbance.
•RDA approved 4‑0 with special conditions.
Directions
•Agent to meet with contractors at preconstruction to locate erosion controls and verify methods.
•Applicant to show access axis on plan; Conservation Agent to confirm placement of erosion controls at pre‑construction meeting; applicant to remove debris before start.
•Applicant to supply updated plan showing accurate building footprint and access/driveway details and to submit as‑built documentation.
•Clerk to place continued items on Aug. 31 agenda and provide missing draft minutes.
•Continue 12 Cooper enforcement review to next meeting.
•Staff to confirm DP numbers and applicant availability.
•Staff to include rationale for tree removals (dead/diseased vs other) in action notes and to supply photos.
•Staff to verify infiltration/test pit results and oversee planting implementation.
Webster Conservation Commission met Aug. 3, 2026; the board approved several Certificates of Compliance, continued multiple hearings to Aug. 17, issued negative determinations for two residential projects (including an above‑ground pool), and ratified enforcement orders—one at 23 South Shore Road with fines and one at 49 Birch Island Road requiring restoration.
Discussion Points
•Agent presented multiple site visits showing continued unauthorized work; homeowner and contractor cited misunderstanding and communication issues.
•Agent presented photos confirming stabilization.
•Applicant described covered breezeway, pervious pavers and rear deck; agent confirmed no excavation.
•Applicant described pool, dry well and dechlorination plans.
•Commission confirmed dock permits where applicable.
•Commissioners probed removal method and material handling.
•Commission queried draining procedure and material types.
•Contractor proposed booms and scraping to recover ~85% of sand and redistribute pebbles to restore microhabitat.
•DEP advised formal enforcement when sand is placed in lake; approximately 16 cubic feet of sand documented.
•Members debated whether more than one winner is appropriate and agreed to clarify the award rubric.
•Members had difficulty accessing meeting links and asked staff to circulate corrected links.
•Several commissioners argued fines and NOI were necessary to ensure fairness and protect the lake.
•Several items lacked DEP numbers or had consultant scheduling conflicts.
•Staff will prepare award narratives.
Decisions
•Candidate 2 selected; staff to draft narrative.
•COCs issued for five properties
•Continue hearings to allow agency processing and completeness.
•Enforcement order ratified; fines imposed; NOI pathway required.
•Negative determination issued
•Negative determination issued for RDA at 6 Ridgewood Drive
•Restoration approved under enforcement order; no fines at meeting.
Directions
•Agent to follow up on construction logistics and verify erosion controls if needed.
•Agent to track Chapter 91 follow‑ups and monitor hydroseed success.
•Agent to verify dry well and erosion controls in follow‑up.
•Applicants to supply DEP numbers; staff to reissue meeting link and materials.
•Draft plaque text and circulate for sign-off.
•Ratify enforcement order; agent to administratively approve mitigation plan and contractor may proceed under enforcement order.
•Ratify enforcement order, require erosion controls, impose fines for July 13–21, and require NOI and professional oversight for substantial shore work.
The Webster Planning Board heard an 8‑lot subdivision proposal for 70 Gore Road that drew extensive public comment about density, stormwater, road safety and lake access; the board continued the application to August 24 for more review.
Discussion Points
•Applicant confirmed building function as used‑car sales (no commercial garage).
•Applicant present and plan availability confirmed.
Regular meeting of the Webster Board of Selectmen on 2026-07-13 covering routine approvals, several licensing items (including a contested entertainment license for Dockside), authorization to apply for state Clean Water Trust assistance, an appointment to the planning board, and updates on the town strategic master plan and town operations.
Discussion Points
•Abutters and board members raised concerns about parking, lighting, lake echo effects on sound, and enforcement mechanisms.
•Applicant said he is relocating from Southbridge due to eminent domain and described parking layout.
•Attorney acknowledged two recent violations (jukebox music outside; advertised performance) and described corrective actions.
•Board confirmed product mix includes ice cream and lottery.
•Board confirmed vehicles would not be parked on the sidewalk.
•Board debated allowable instruments (acoustic only; bongos excepted) and hours before voting.
•Board inquired about a new exterior sign and whether it needs planning-board review.
•Board read and discussed the authorization language required by state programs.
•Board thanked him for volunteering and discussed the importance of filling vacancies.
•Kildeer Island Club submitted certificate of insurance; event indoors so no police detail required.
•Nipmuck Ski Club use of Memorial Beach appears to have occurred without approvals; staff to meet with club representatives.
•Saints Constantine & Helen Church must provide an updated certificate of insurance from the diocese before the license is final.
•Snow summarized his background in land development and local permitting.
•Thompson had not filed a reply to the town's pretrial brief; procedural deadlines approaching.
•Town Administrator and board noted this is a routine annual requirement for applying to the state Clean Water Trust.
•Town-office move is nearly complete; accessibility and furniture work remain.
•License approved; sign matter to be clarified by staff.
•License approved with hours Mon–Sat 12:00–20:00 and Sun 12:00–17:00; acoustic-only outside music; bongos allowed; parking attendant required on Fri/Sat.
•No formal board action; staff follow-up planned.
Directions
•Require a parking attendant on Friday and Saturday evenings.
•Staff to collect and verify required insurance documentation for church event.
•Staff to confirm sign-permit requirements if any.
•Staff to continue office-fitout and complete records/purchase items.
•Town Administrator authorized to file applications and execute agreements.
•Town Administrator to meet with club representatives and report back.
•Town clerk and planning board to be notified.
•Town inspectors/public safety to monitor compliance; proprietor to provide updated parking and lighting documentation.
The Webster Confirmation Commission met July 6, 2026; members approved prior meeting minutes, continued several certificate-of-compliance (COC) matters for further work or documentation, approved one-year extension for 124 Gore Road, approved a COC for 42 Bates Point Road, and heard staff reports on enforcement and a planned lake cleanup.
Discussion Points
•Chair called meeting; quorum established and minutes reviewed and corrected
•Commission chose to continue rather than proceed without applicant.
•Commission debated whether environmental award(s) should be singular or plural and requested full committee vote with materials available