Citizen Portal
Sign in
Front PageNationalFollowingFavorites
Common Pleas Court in Lucas County, Ohio (Toledo) in the USA

Photo: Joel Rossol·CC BY-SA 2.0·via Wikimedia Commons

Saturday, November 14, 2026
Ohio / Lucas County

Lucas County

OverviewMeetingsDataOfficials
Population
428,0182024
Higher than communities in Ohio
Household income
$62,2242024
Similar to communities in Ohio
Home value
$163,9002024
Similar to communities in Ohio
Unemployment
4.7%2026
Less favorable than communities in Ohio
Violent crime
7482023
Less favorable than communities in Ohio
Work from home
8.9%2024
Similar to communities in Ohio
Source: Polco GPAL, using data from the original source shown for each indicator.Data from Polco

Meetings

Loading meetings…

Lucas County, Ohio

Open map →
Ohio · Census county shapes

Quick actions

Lucas County officials

All officials →

Hot topics in Lucas County

  1. 1 Flock Safety Cameras
  2. 2 Data Center Development
  3. 3 Short-Term Rental Rules
  4. 4 Property Tax Rates
  5. 5 Homeless Encampments
See more →
Citizen Portal
See government, clearly.
Platform
About usFor citiesTopicsNewsDiminished Fourth Estate
Support
Help center
Community
Affiliate programSupport CPVolunteer
Legal
PrivacyTerms
Find your state
ALAKARAZCACOCTDEDCFLGAHIIAIDILINKSKYLAMAMDMEMIMNMOMSMTNENHNJNMNVNYNCNDOHOKORPARISCSDTNTXUTVAVTWAWIWVWYPRGUASVI
© 2026 Citizen Portal. Meeting records and summaries sourced from the public record.
32°F (0°C)
Mostly clear · H 46° L 30°
20 meetings
10
Nov

City of Waterville Ohio Live Stream

Ohio//City of Waterville

City of Waterville council met Nov. 9, 2026. Council approved three ordinances (solid-waste code update, zoning for annexed parcels, and final plat for Stonefield Village), heard a citizen petition seeking a charter amendment to ban data centers, discussed the proposed FY2027 five-year capital program, and moved into executive session on potential legal action.

Discussion Points

  • •Administrator John explained the ordinance aligns the codified ordinances with the new refuse and recycling contract and addresses container storage.
  • •Administrator presented revenue assumptions, pre-funding methodology, and highlighted capital projects (water-line, traffic signal reimbursement, brownfield remediation, equipment purchases).
  • •Council member asked about implications of the term 'permanent zoning' and whether it raises any higher threshold to change in the future.
  • •Council members asked for clarifications about tree maintenance, vehicle purchases, storm-sewer funding, and timing of public-works expansion.
  • •Council noted the ordinance preserves numbering and avoids cross-referencing issues.
  • •Council offered logistical support and requested a flyer.
  • •Gray laid out the program, venues, and logistics for Dec. 5 and requested community promotion.
  • •Petitioners asked whether petitions have been forwarded to Lucas County Board of Elections and when verification results will be returned.
  • •Petitioners cited Ohio Supreme Court and Ohio Constitution guidance on municipal obligations regarding charter-amendment petitions.
  • •Planning Commission recommended approval based on compatibility; administrator explained temporary zoning at annexation and reason for permanent classification.
  • •Planning Commission recommended approval with conditions; city engineer confirmed plat conformance with engineering and zoning standards.

Decisions

  • •No council action required; informational item.
  • •No formal council vote; matter to proceed via normal petition verification and election placement procedures.
  • •No vote taken; plan remains under review.
  • •Ordinance 1426 adopted on third reading.
  • •Ordinance adopted after public hearing.
  • •Ordinance No. 1126 adopted on third reading.

Directions

  • •Administrator to sign plat upon ordinance adoption and staff to complete recording and condition compliance.
  • •Council asked members to review the capital program and return with questions; staff to fine-tune the operating budget and consider passing the capital program at an upcoming meeting.
  • •Mayor/staff: follow municipal code and forward petitions to Lucas County Board of Elections for verification; report back to council when verification completes.
  • •Organizers to distribute flyers to schools and businesses and post on community Facebook pages.
  • •Staff to implement the code updates and coordinate with Archbold Refuge Service.
  • •Staff to record zoning change and update city maps; no further action required from county beyond prior annexation approval.
3
Nov

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County Board of Commissioners met Nov. 3, 2026 to approve routine contracts and agreements including a $1,000 economic development partnership, sheriff's technology contracts (with a noted price increase), a $325,400 boiler-repair contract, several Job and Family Services Title 20 agreements, a vehicle purchase for Clerk of Courts, and an executive session on personnel and imminent litigation.

Discussion Points

  • •Administrator Ford described the $1,000 partnership for Songs for Justice 2026.
  • •Berner listed statutory topics for executive session and noted legal counsel would join.
  • •Commissioners asked about responsible-contractor vetting and OSHA checks.
  • •Commissioners asked how these contracts affect general-fund positions and whether the programs reduce recidivism.
  • •Commissioners asked whether funds offset the general fund and whether the programs demonstrate measurable results.
  • •Commissioners confirmed the purchase is not from the general fund.
  • •Kunkel said the Jeep Grand Cherokee was the lowest bid after multiple quotes and that the county would receive trade-in and rebate offsets.
  • •Nock said two boilers were past useful life and one was out of service.
  • •Options discussed included tabling, passing at budgeted amount, or amending the item.
  • •Osborne said case management and prevention programming are part of the domestic-violence agreement.
  • •Simsek explained a later quote increased the scanner cost after the budget was prepared.
  • •Staff confirmed contracts offset positions and cited performance measures, noting mediation improves attendance.

Decisions

  • •Approved partnership agreement for $1,000.
  • •Award contract to Bays Incorporated at the lowest bid of $325,400.
  • •Board approved Items 5 and 6.
  • •Board approved Items 7 and 8.
  • •Board approved procurement at budgeted amount of $23,511.
  • •Board approved then-and-now certificates and the vehicle purchase.
  • •Board entered executive session by recorded roll call.

Directions

  • •Administration staff to run responsible-contractor checks as part of procurement review if not already completed.
  • •Funds will continue to be Title 20-funded and offset general-fund positions.
  • •Staff to provide prior-year performance measures and metrics.
  • •Staff to share prior-year outcome metrics and recidivism/attendance statistics.
  • •Staff to work with vendor to reconcile the $935.55 difference off the floor.
27
Oct

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County commissioners held budget hearings and considered three ditch-improvement hearings plus infrastructure agreements; they approved cooperative and assessment items and heard budget presentations from the Veterans Service Commission and Integrated Justice staff.

Discussion Points

  • •He identified a potential problem in low VA loan guarantees and said he will work to investigate and improve that metric.
  • •Ingraat characterized the Curtis Road item as an accommodation tap; owners will share costs if the waterline extends.
  • •Ingraat reported an OPWC grant of $899,500 and estimated total project cost at $3,500,000; he characterized the county share as a long-term payment over 20 years.
  • •Integrated Justice described completed integrations, upcoming domestic relations Tyler go-live (June 2027), and ongoing training and support needs.
  • •Loan request for sanitary sewer at 851 Countway Road was described as a cost-recovery action.
  • •No detailed county financing schedule was provided; staff will return with specifics.
  • •Orovitz reported outreach expansion, kiosk installs, and metrics (social media, kiosk views, billboard impressions).
  • •Panuski said Walensky and Meyer ditches are in the Swan Creek watershed and described the Shadow Valley detention basin as condominium property owners seek county maintenance.
  • •Presenter said the office achieved a 5.5% reduction versus a 13% target by combining vendor concessions and internal cuts.

Decisions

  • •Board scheduled viewing on Dec. 8 and first hearing on Feb. 2, 2027; motion approved to place items on calendar.
  • •Both administrative items approved by roll-call vote.
  • •Cooperative agreement approved.

Directions

  • •No formal direction recorded; commissioners expressed thanks and the hearings remain open.
  • •None recorded beyond continuing budget review.
  • •Staff to document and process assessment and loan per county procedures.
  • •Staff to provide financing schedule and implementation plan.
27
Oct

Board of County Commissioners Regular Meeting

Ohio/Lucas County

The Lucas County Board of County Commissioners held budget hearings and routine business on Oct. 27, 2026, approving multiple contracts, grant acceptances and budget submissions while beginning detailed reviews of departmental 2027 budget requests including the sheriff's office, clerk of courts and information services.

Discussion Points

  • •Award amounts and cash-match requirements
  • •Chargeback-driven appropriation needs (health insurance, appointed counsel)
  • •Commissioners requested the sheriff share contract documents and finance details with OMB and the board
  • •Enterprise budget request of $2,946,797 with $80,528 increase
  • •Estimated price increases and contract terms
  • •Extension of registration deadline and penalty waiver for 2027
  • •Fee remains $25 per license; registration opens Dec. 1
  • •Guardianship referrals for APS cases
  • •HR subscription renewal and benefits consulting scope and costs
  • •List of approved items and follow-up contracting steps
  • •Major cost drivers: Oracle, Microsoft 365, OnBase, data center and security
  • •Program dollars and participating sites for Partners in Education
  • •Records retention work and microfilm cataloging
  • •Sheriff cited staffing shortages, wage gaps, and the shift to a new medical services contractor as key drivers
  • •Sheriff estimated $3.3M exposure if township contracts are not sufficient
  • •State cybersecurity mandate obligations with limited state funding
  • •Storage volume (~45,000 cubic feet; ~38,000 boxes) and vendor proposals
  • •Use of funds across main office, juvenile and felony court settings
  • •WEP worksites template and number of sites (approx. 70)

Decisions

  • •Appropriations and HR contracts approved
  • •Board accepted the grants
  • •Board approved the agreements
  • •Contract awarded; budget queries to be addressed during appropriation process
  • •Multiple approvals recorded; several follow-ups assigned to departments
  • •No final budget approval; follow-up required prior to township votes
  • •Resolution approved

Directions

  • •Auditor to implement extension and publicize it
  • •Clerk to finalize contract paperwork and report back with signed agreement
  • •Departments to finalize agreements and coordinate with OMB; sheriff to provide contract details and OMB to implement appropriations
  • •Director will provide a breakdown of support tickets by office and pursue grant opportunities
  • •JFS to execute agreements and provide site lists as needed
  • •OMB and HR to finalize paperwork and implement appropriation/contract actions
  • •Prosecutor's office asked for legal memorandum if general-fund obligations are expected
  • •Prosecutor to coordinate matching funds and implementation with finance staff
  • •Sheriff to send the most recent contract and cost calculations to county staff and commissioners
20
Oct

Board of County Commissioners Regular Meeting

Ohio/Lucas County

County commissioners held a regular meeting and budget hearings on Oct. 20, 2026, approving routine items (bond participation, grant acceptances, donations) and conducting budget hearings including a lengthy coroner presentation warning that staffing cuts could delay autopsies; several courts did not appear for their hearings, drawing commissioners' criticism.

Discussion Points

  • •Coroner described staffing shortages, accreditation and potential service delays; proposed reductions may eliminate routine weekend autopsy work, causing delays in returning decedents to families.
  • •Description of donated unit; fair market value range $46k–$52k; intended countywide multi‑agency capability.
  • •Grant up to $50,000 not to exceed 10% of department budget; program allows found dogs to stay with finders during the stray hold; grant covers up to five days of food, microchip, vaccinations and spay/neuter if adopted.
  • •MOA between juvenile court and Mental Health & Recovery Services Board for youth supports; agreement with Unison Health to provide in‑detention services funded by the board.
  • •Ohio law requires publication of delinquent tax lists and a bid solicitation when multiple newspapers exist; digital availability will continue on the auditor's website.
  • •OVI task force grant is $249,883.41; impaired driving enforcement grant is $66,582.08; grants fund overtime saturation patrols and checkpoints within Lucas County roadways; quarterly state reporting required.
  • •Port Authority participation to support Akron's Envision Apartments (112 units) on ~4.46 acres; TEFRA approval already held in Akron; participation considered reciprocal with Summit County.

Decisions

  • •Board accepted both grants.
  • •Board accepted the donation.
  • •Board approved agreements.
  • •Board approved resolution to participate in financing up to $7,000,000.
  • •Board authorized application submission.
  • •Board authorized the advertisement for publication.
  • •No formal funding decision made at this hearing; presentation to inform budget deliberations.
13
Oct

City of Oregon City Council Regular Meeting 10/12/2026

Ohio//Oregon

Oregon City Council heard extended public comment on a proposed data center and related November charter amendment (Issue 25), approved five ordinances including grant applications and an insurance renewal, and received administration updates on outreach materials and next steps. Council also heard public appeals about a senior-center levy (Issue 15) and scheduled a November public hearing on a special-use permit.

Discussion Points

  • •Administration noted existing noise, wastewater and stormwater codes and discussed limits on targeting rules to a single industry; said strict mitigation language could be included in the EDA or via ordinance.
  • •Administrator demonstrated a city-run website with documents and timelines to inform residents.
  • •Attendees pushed for clear complaint processes, remediation funding and enforceable fines.
  • •Finance explained limited market responses and the risk of leaving a pooled insurer if outstanding claims remain (intergovernmental 'golden handcuff').
  • •Law Director said mediation and legal review are ongoing; some protections could be codified in ordinance or the EDA.
  • •Novacek described services funded by the levy (meals, transport, screenings) and cost examples for homeowners.
  • •Ordinances covered police systems and grants, building repairs, and an insurance renewal.
  • •Residents raised health, noise, diesel storage, setback and transparency concerns about the proposed data center.
  • •Residents requested specific measurement standards for low‑frequency and continuous noise at neighboring property lines and independent monitoring and public reporting.
  • •She recounted an administrative error in 2023 that caused the renewal to fail and presented historical vote outcomes (2013 and 2018).
  • •Speakers urged a Citizens Advisory Board and a legally enforceable development agreement (EDA) to set enforceable standards.
  • •Walters said documents on the site include signed agreements and evidence of prior public meetings, to rebut claims of secrecy.

Decisions

  • •No council vote on levy; matter is on the Nov. 3 ballot.
  • •No formal council action on the project; five ordinances unrelated to the project were passed; the EDA/term sheet remains a negotiation item.
  • •No ordinance change adopted at meeting; staff signaled willingness to draft enforceable mitigation language for future consideration.
  • •No policy change adopted; the site is an outreach measure and informational resource.
  • •Ordinances 1-32 through 1-36 adopted unanimously (7–0).

Directions

  • •Administration to maintain the page, distribute printed fact sheets with QR codes and hold a town-hall meeting before the election.
  • •Administration to publish and maintain a 'facts vs. myth' website and provide QR-coded handouts; city staff said they will pursue additional outreach and a town-hall before the election.
  • •Departments to execute contracts/grant submissions and report on implementation.
  • •Finance to finalize insurance renewal tasks.
  • •Public awareness; no council action taken at meeting.
  • •Staff to consider stricter mitigation language for an EDA or ordinance; administration to include enforceability provisions where legally permissible.
13
Oct

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County Board of Commissioners held a budget hearing and routine business on Oct. 13; the board approved several routine items, adopted a resolution clarifying supplemental appropriations under Chapter 5705, heard Destination Toledo

Discussion Points

  • •Administrator asked OMB to notify departments projected to be over budget.
  • •Administrator explained legal requirements of Ohio Revised Code chapter 5705 and the need for fiscal officer certification before expenditure.
  • •Commissioner Gerken emphasized accountability and attendance at public budget hearings.
  • •Commissioners discussed the merits of the Destination Toledo work relative to county budget targets.
  • •Commissioners highlighted the cost of deferral and need to prioritize capital spending.
  • •Commissioners sought clarification on midweek strategy and hiring practices.
  • •Consent items included grants and administrative authorizations.
  • •Destination Toledo presented visitor metrics, economic-impact estimates, and a plan to pursue more midweek conventions.
  • •Operators described specific deferred items: escalators and elevators from 1987, ice-plant compressors and facade/concrete repairs.

Decisions

  • •All listed consent items were approved.
  • •No budget change; Destination Toledo proposed a flat budget and will provide additional details.
  • •No immediate appropriation recorded; board will consider requests as part of capital budget.
  • •Resolution adopted clarifying supplemental appropriations process.

Directions

  • •Destination Toledo to follow up with specifics on midweek bookings and staffing advertising.
  • •Facilities/OMB to provide prioritized capital recommendations.
  • •Office of Management and Budget to distribute the resolution and notify departments/elected officials.
13
Oct

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County Board of County Commissioners convened Feb. 13, 2026. The board approved two county engineer items and two sanitary-engineer items, heard a budget presentation from the Lucas County Board of Elections about staffing, vendor cost increases and election expenses, and met in executive session to deny a grievance (T&S grievance 26-08).

Discussion Points

  • •Chargebacks are set by Ohio law and funds go to the general fund; prepayment is required for special elections.
  • •Commissioners asked for additional information on the digester amendment before acting.
  • •County engineer presented two items for approval (contract award and final plat).
  • •Denali was the lowest responsive bidder among three bidders; Rocky Ridge's earlier price was substantially lower and Rocky Ridge appears to have withdrawn.
  • •Executive session held to discuss discipline and collective bargaining (T&S grievance 26-08).
  • •Some costs (e.g., board staff pay) are not eligible for chargeback and therefore are not recovered from requesting entities.
  • •Staffing levels and vacancy of IT manager; need for succession planning and cross-training.
  • •Vendor contract increases and limitations due to state certification and vendor lists.

Decisions

  • •Approve contract award to ER Zeiler Excavating for Wicks Ditch restoration
  • •Approve final plat for Bridal Creek Plat 7
  • •Approve private agreement for Apple Blossom Plat 12
  • •Award biosolids contract to Denali
  • •Deny grievance 26-08 as submitted
  • •Table the Peterson Construction digester amendment for one week

Directions

  • •Board of Elections to continue cross-training and present follow-up cost details as requested.
  • •Sanitary engineer to return with more information on the digester amendment.
13
Oct

City of Waterville Ohio Live Stream

Ohio//City of Waterville

City of Waterville council held its Oct. 12, 2026 meeting: public comment raised privacy and accuracy concerns about Flock license-plate cameras; council received administrator reports on tax-sharing and year-end budget amendments; first readings held for solid-waste and zoning ordinances; an emergency amendment to 2026 appropriations passed; two annual tax-related resolutions passed; council entered executive session on personnel.

Discussion Points

  • •Administrator described intent to codify current contractor practices and to avoid overly prescriptive technical details.
  • •Administrator outlined added revenues and new expense needs including fire overtime and water meters.
  • •Council acknowledged suggestions from Scott Johns were incorporated.
  • •Council confirmed action does not raise taxes and accepted staff explanation.
  • •Council confirmed schedule for subsequent readings and public hearing.
  • •Council discussed TIF explanation and why the amendment was needed to close year-end gaps.
  • •Council recommended a meeting with Police Chief Joe Balvano to review Waterville’s camera use and data retention/sharing practices.
  • •Developer described lot-size reductions and house-size targets to hit a target price point in the low-to-mid $300,000s.
  • •Mayor announced executive session for personnel matters and roll call was recorded.
  • •Planning commission reviewed and requested revisions now incorporated.
  • •Resident Daniel Reski raised privacy and accuracy concerns about Flock cameras based on incidents in other jurisdictions.
  • •Staff explained the purpose of requesting advanced tax payments and the difference between inside and outside millage.
  • •Staff noted planning commission recommendation and consistency with the 2025 comprehensive plan.

Decisions

  • •Entered executive session; no public action reported.
  • •Ordinance 13-26 passed as emergency measure
  • •Resolutions 33-26 and 34-26 adopted.

Directions

  • •Council entered executive session; no further public business scheduled.
  • •Ordinance adopted as emergency measure; staff to publish ordinance and update financial records.
  • •Staff to arrange meeting between complainant and Police Chief Joe Balvano; staff to report back to council if problems are found.
  • •Staff to prepare public hearing materials and draft ordinance refinements.
  • •Staff to provide prior preliminary plat for council comparison at next meeting.
  • •Staff to refine ordinance language and return for second reading on Oct. 26.
  • •Staff to submit resolutions to Lucas County auditor and continue reconciliation.
6
Oct

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County Commissioners held budget hearings and considered routine agenda items including bond inducement for Otterbein Homes, a land detachment request for Sylvania, grant applications for public safety and juvenile services, IT contract renewals, and a contested budget hearing with Recorder Ashford about a proposed 13% cut.

Discussion Points

  • •Board approved extension and will coordinate with state grantor.
  • •Bond counsel explained Warren County is the issuer and Lucas County's approval is procedural.
  • •Commissioners approved during roll call without extended debate.
  • •Commissioners had brief clarifying questions and moved to approve.
  • •Commissioners proposed trimming advertising/outreach lines as a compromise and highlighted different vacancy-management strategies among elected offices.
  • •County allocation and sheriff share amounts disclosed.
  • •CTF's budget variance driven by insurance increases, staffing costs, and the loss of a court-funded contract.
  • •Director said reductions would reduce transportation services and work-release capacity and could increase county jail bed days.
  • •Intergovernmental agreement with Toledo required for administration and some funds to TPD/CJCC.
  • •IT staff presented costs and reductions in portions of the HCM training license line.
  • •Presenter cited demolition delays and site surprises; project remains on budget.
  • •Recorder Ashford argued a 13% cut would reduce operating funds to $116,000 and force frequent supplemental requests.

Decisions

  • •Approval granted.
  • •Approval granted; no county indebtedness assumed.
  • •Authorization to apply approved.
  • •Extension approved through June 30, 2027.

Directions

  • •Board asked staff and budget analysts to continue review and return recommendations before final budget adoption in December.
  • •Economic Development to submit extension paperwork to Ohio Department of Development.
  • •OMB/commissioners to review options and finalize decisions during December budget adoption.
  • •Sheriff's Office to execute intergovernmental agreement if awarded.
6
Oct

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County commissioners held budget hearings on Oct. 6 that included multiple public works contract amendments and a lengthy public-defender budget presentation; commissioners approved several utility- and road-related amendments but held one item for follow-up and sharply criticized Prosecutor Julia Bates for not attending her budget hearing.

Discussion Points

  • •Board discussed necessity of methane sensor and electrical compatibility for new screens; staff described change-order costs and unforeseen subsurface rock.
  • •Board expressed frustration that Prosecutor Julia Bates and two judges did not attend the scheduled public hearing.
  • •Board members accused the prosecutor of preferring private negotiations to public accountability and questioned midyear spending and missed budget targets.
  • •Board recorded approvals for several items while holding item 9 for follow-up.
  • •Commissioners questioned whether Fishbeck (consultant) should bear responsibility for the omission and requested contract and bonding details.
  • •Incrotte explained the $174,587 change order stemmed from selecting Westech as an "or-equal" supplier whose covers lacked pressure-relief valves.
  • •McNulty emphasized Sixth Amendment obligations and national caseload standards as drivers for staffing needs.
  • •McNulty reported an initial $6.5M need for 2027, later reduced to $5.7M after removing fellowship and internship items and accounting for grant offsets.

Decisions

  • •Items 6,7,8,10 and 11 approved; item 9 held.
  • •Item was held/tabled for follow-up; no approval given.
  • •No appropriation decision made; matter returned for further review during budget process.
  • •No formal sanctions; request for in-person presentation and offer of special meeting.

Directions

  • •Board invited the prosecutor to present at a future public meeting or special session.
  • •McNulty to provide additional data on case counts, diversion use, and salary comparators.
  • •Staff to provide contract documents, bond status and a written report from Fishbeck before next meeting.
  • •Staff to provide documentation and written reports on held item 9.
29
Sep

City of Oregon City Council Regular Meeting 09/28/2026

Ohio//Oregon

Oregon City Council held a public hearing and meeting that included approval of a special use permit for an outpatient counseling provider at 445 Earlwood Ave and an extended public comment period about a proposed Vantage data center and related economic development agreements ahead of a Nov. 3 charter amendment vote.

Discussion Points

  • •Applicant described service model and hours
  • •Community concerns: noise/infrasound, wetlands, nondisclosure agreements, local hiring/PLA
  • •Council asked about medication storage and emergency calls
  • •Council request for written commitments and technical detail
  • •Decommissioning plans and adaptive reuse concerns
  • •Low‑frequency noise (infrasound) concerns and lack of local code for LF noise
  • •MOU signed with building trades and PLA anticipated
  • •Nondisclosure agreements and transparency
  • •Pickle Road design and ODOT $500,000 grant
  • •Planning Commission recommended approval (4–0, 1 absence)
  • •Police vest grant eligibility (75% coverage up to $8,000)
  • •Procedural steps required: CRA/TIF amendments, EDA, site plan, possible land vacates
  • •School district fiscal shortfall and potential mitigation through milestone and property payments
  • •Sidewalk program scope and low bidder selection
  • •Supplemental appropriations including opioid settlement uses and TIF receipts
  • •Timing of payments and milestones (sale of property, $5M milestone payments)
  • •Wetlands adjacency and potential runoff during construction

Decisions

  • •No formal council action on EDA or CRA/TIF taken at this meeting
  • •Ordinance 1‑26‑2026 passed 6–1 authorizing the SUE
  • •Ordinances 1‑27 through 1‑31 passed, most unanimously

Directions

  • •Administration to finalize contracts and proceed with right‑of‑way acquisition and grant reporting
  • •Administration to schedule additional public meetings and advisory committee sessions; Vantage asked to send experts to community meetings and town hall.
  • •Building & Zoning to continue enforcement of Certificate of Occupancy conditions
  • •Developer to provide written PLA/MOU commitments and attend town hall with experts; administration to document payment timing in writing.
  • •Vantage to provide technical details at a town hall (timing within two weeks); administration to collect site and permitting details for public record.
29
Sep

City of Waterville Ohio Live Stream

Ohio//City of Waterville

Waterville City Council heard a presentation from the Toledo-area Metroparks about a proposed inclusive playground at Farnsworth Park, considered annexation and rezoning of Port Authority parcels, approved engineering work for a historic-society parking-lot upgrade, addressed public safety and infrastructure reports, and moved into executive session on a potential property purchase.

Discussion Points

  • •Administrator explained grant award and estimated scope (~35 stalls), design and bidding timeline, and lease proposal for overflow parking.
  • •Administrator explained the annexation history, ownership (Toledo-Lucas County Port Authority), and revenue-sharing with Waterville Township.
  • •Commenter described mass, warrantless retroactive search capability and external access to municipal camera feeds.
  • •Council discussed grading/retaining-wall questions and confirmed engineering role.
  • •Council members asked about maintenance, warranties, long‑term costs and site impacts; Metroparks cited established maintenance protocols and a 10‑year capital plan.
  • •Council noted that much of the city’s non‑residential income comes from Farnsworth Industrial Park and that annexation expands that base.
  • •He estimated preliminary net proceeds from a kickoff fundraiser and described ongoing fundraising tactics.
  • •He recommended an independent audit and third‑party safety testing before deploying analytic software.
  • •Metroparks presented equipment selection, accessibility features, estimated budget ($1.0–$1.1M), timeline (break ground late 2027; open spring 2028), and fundraising plan.
  • •Police described prior education efforts and planned interjurisdictional coordination with neighboring municipalities and legal counsel.
  • •Potential remedies discussed: civil-style citations, parental accountability, registration/education programs and enforcement.
  • •Procedural approvals and roll-call votes recorded for large items (annexation, engineering authorization, MOU).
  • •Volunteer reported test data and engineering engagement; organizers plan more fundraisers and pro bono technical support.

Decisions

  • •Council approved Resolution 32-26 authorizing the MOU and supporting Metroparks' grant application.
  • •No formal action recorded at the meeting; council acknowledged the comment.
  • •No formal city funding or action recorded; volunteers will continue fundraising and coordinate with engineers.
  • •Resolution 30‑26 accepted by roll call (one 'No' vote).
  • •Resolution 31-26 authorized engineering services; one member abstained due to Historical Society board membership.
  • •Resolutions 30‑26, 31‑26, and 32‑26 approved (with one no vote and one abstention across votes).
  • •Short-term: continue education and targeted enforcement; longer-term enforcement approach to be proposed after coordination.

Directions

  • •Annexation accepted; parcels referred to the planning commission for M‑1 rezoning consideration on 10/05/2026.
  • •Authorize engineering agreement; bring lease and final plans back to council during design review.
  • •Metroparks to apply for state grant and continue fundraising; city to execute MOU and support grant application.
  • •Planning commission referral scheduled; staff to pursue grant application and engineering contracts.
  • •Police to meet with prosecutors and neighboring towns and return with recommended enforcement language or approach.
15
Sep

City of Waterville Ohio Live Stream

Ohio//City of Waterville

The Waterville City Council received a presentation on the PACE (energy assessment) program and approved related resolutions and emergency ordinances to join the Northwest Ohio Advanced Energy Improvement District; council also authorized ODOT to build a federally funded roundabout at State Route 64, heard staff project updates, and received community event announcements including the Roche des Beaux festival and an Arbor Day proclamation.

Discussion Points

  • •Chief Albano will present a report at the next meeting describing camera functionality, audit process, and officer access
  • •Construction expected summer 2028 with ~90 days closure
  • •Filed application to replace water line near Waterville Primary School; utility rate study will consider future rate increases and county sewer debt share
  • •PACE projects must be affixed to the parcel; cannot be moved
  • •Parade route and timing (10 a.m.), vendor counts (130+), children's activities, shuttle locations
  • •Program commonly uses bond pooling or a revolving loan fund; small projects under ~$100,000 may use revolving funds
  • •Project estimated cost $2,357,000, 100% federally funded; no city contribution requested
  • •Sidewalk replacement: ~275 panels, 16 ADA ramps; project cost $98,625 with a $90,000 grant
  • •This first project is a 100% petition from property owner, waiving objections
  • •Traffic study cited 9 crashes (2020–2022) and 51 crashes (2017–2022) in the area
  • •Two Flock cameras were vandalized and cut down within the last month
  • •Typical interest rates recently were around 6.25–6.5%; rate fixed when locked
  • •Veteran grand marshals (20 veterans aged ~75–100) to be honored
  • •Widening project nearing Oct. 5 completion; contractor performing restoration and mailbox reinstallation

Decisions

  • •Resolution 28‑26 approved; ordinances to proceed and levy passed as emergency measures
  • •Resolution 29‑26 approved by voice vote

Directions

  • •Chamber to post full itinerary on website and request volunteers via city channels
  • •Chief Albano to present a transparency and operations report on Sept. 28
  • •City to consent to ODOT construction and coordinate maintenance opportunities
  • •City to join the Northwest Ohio Advanced Energy Improvement District and process each petition individually
  • •Staff to carry out hydrant flushing beginning Sept. 21 and to complete a water/sewer rate utility study
  • •Staff to finalize assessment paperwork and coordinate with the port authority/energy district
15
Sep

Board of County Commissioners Regular Meeting

Ohio/Lucas County

The Lucas County Board of Commissioners met Sept. 15 for routine business, approving several county contracts and grants, hearing department budget requests for 2027 (including Soil & Water and OSU Extension), and taking personnel actions after an executive session.

Discussion Points

  • •Appointments were specified to be in the CSCA bargaining unit at pay grade 18, step 1.
  • •Board authorized acceptance of grant funds.
  • •Confirmation that the $292,120.28 cost will be paid from grant funds.
  • •County contributes majority of flows to Sylvania station per 1973 agreement and recent flow data.
  • •Executive session covered a wide range of personnel topics; HR then presented specific appointments and compensation.
  • •How vendor selection was conducted (RFQ/RFP and technical review).
  • •Land application is cost-preferable to landfill disposal.
  • •No detailed program scope discussed at meeting.
  • •OPWC grant amount requested ($899,500) and county matching obligations discussed.
  • •OSU Extension presented three appropriation options for 2027 including hiring 0.333 FTE and adding an office associate; SNAP‑Ed grant expirations were noted.
  • •Project budget exceeded original $625,000 estimate; RCOG offered to cover the difference after bids are received.
  • •Rocky Ridge provided a 30-day termination notice but is current on work; staff can store materials on pads for the near term.
  • •Soil & Water highlighted leveraged grant funding ($4.7M) from a $225k local investment and described projects (river restoration, wetland pilot).

Decisions

  • •Board approved acceptance.
  • •Board approved advertisement for the project.
  • •Board approved contract award and authorized commitment letter pending confirmation.
  • •Board approved the appointments by roll call.
  • •Board approved the PSA to proceed.
  • •Board authorized advertising.
  • •No final funding decisions were made; hearings remain open.

Directions

  • •Advertise for new hauler and return with procurement results.
  • •Budget hearings to remain open while staff refine figures.
  • •Commissioners and departments to continue advocacy to state legislators for enhanced match and regulatory support.
  • •Negotiate scope and fee with selected firm and return with final contract.
  • •Proceed with advertising for bids; return with bid results and funding confirmation.
  • •Proceed with onboarding and probationary requirements.
  • •Sheriff's office to complete acceptance and reporting processes.
  • •Staff to refine bid and cost estimates and report back with final county match figures and loan options.
8
Sep

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County commissioners received a strategic-plan presentation from the Office of Management and Budget and approved multiple engineering and sanitary contracts, including a $546,902 design agreement for a roundabout largely funded by ODOT and two water/sewer projects.

Discussion Points

  • •Commissioners approved the renewal by roll call.
  • •Commissioners asked for parcel counts and confirmation whether affected parcels are in the county rate base.
  • •Commissioners asked how many roundabouts are planned and whether funding would be the limiting factor.
  • •Commissioners asked whether change orders or other issues were likely.
  • •Commissioners requested parcel-level data to assess proportionality of the county's contribution.
  • •Hayes and Administrator Ford said a dedicated grants position exists and centralization would be phased.
  • •Hayes proposed 3 strategic actions: rebuild OMB capacity, create a 5-year CIP, and centralize grants management.
  • •Incrot presented the low bid and noted robust local competition.
  • •Incrot said the county accounts for approximately 84% of the flow into the Sylvania pump station and the city will seek OPWC funding up to $899,000.
  • •Panuski presented the Colliers contract for design and said design costs were 90% covered by ODOT.
  • •Panuski presented the Trimble Unity renewal and stated the amount of $171,700.
  • •Spencer Township requested the project and agreed to contribute roughly 20% of the cost.

Decisions

  • •Approve Colliers design contract
  • •Approve joint cooperative agreement as part of items 4 and 5
  • •Approve Trimble Unity renewal
  • •Award contract to Wonderly Trucking

Directions

  • •No specific direction recorded beyond approval of the contract.
  • •Sanitary Engineering to provide parcel and flow data for commissioners.
  • •Sanitary Engineering to provide parcel-level flow and rate-base information to commissioners.
  • •Staff will continue phased implementation of OMB centralization and provide follow-up materials to commissioners.
8
Sep

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County Board of Commissioners held a regular meeting on 2026-09-01. The board appointed Sandra Rivers Gill as Lucas County Poet Laureate, passed a resolution condemning the attempted unlawful seizure of Palestinian homes, proclaimed September 2026 National Workforce Development Month, heard strategic-plan and sustainability updates, approved several agreements and leases, and authorized administrative parking and staffing actions.

Discussion Points

  • •Arts Commission described selection process and ARPA-funded subgrants supporting artists.
  • •CDBG administration and clean audit for program year 2022 noted.
  • •Commissioners discussed disseminating the resolution to elected officials.
  • •Commissioners encouraged partner outreach and participation.
  • •Dan Reedy described property loss and ongoing legal action.
  • •EcoFest attendance and educational programming.
  • •Gerken framed the item as community support for a family affected overseas.
  • •Greenhouse gas inventory nearly complete; potential operational audits and grant opportunities.
  • •Outgoing laureate and commissioners emphasized community outreach and representation.
  • •Plans to compile tiered site and building inventory and support reuse of county-owned properties.
  • •Presentation of three strategic pillars and program metrics such as BR&E visit targets and active projects.
  • •QuickPark management fee is $9,000 per year; reimbursable staffing expenses and potential repair cost sharing were discussed.
  • •Signage and staff authority for towing removal; targeted lots were described.
  • •SolSmart bronze designation and permitting checklist work to ease solar installations.
  • •Workforce partners described training, job fairs and mock interview programs.

Decisions

  • •Adopted proclamation; proceed with planned events.
  • •Adopt resolution condemning attempted unlawful seizures
  • •Approved towing designation and QuickPark agreement.
  • •Formal appointment of Sandra Rivers Gill as poet laureate
  • •Informational update accepted; no vote required.
  • •Informational update; no formal vote.

Directions

  • •Continue BR&E visits, finalize site/building inventories and coordinate permitting improvements.
  • •Continue partnership outreach and use inventory findings to identify energy efficiency and grant opportunities.
  • •Coordinate a photo and schedule appearances for the new poet laureate.
  • •Coordinate events across partners and report results post-October.
  • •Explore targeted industry data-driven strategies for 2027.
  • •Implement signage and hang-tag system; execute agreement and MOU with Common Pleas Court.
  • •Staff to email the resolution to Ohio congressional delegation and neighboring states' delegations.
25
Aug

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County Board of County Commissioners held a regular meeting on August 25. The board received a presentation on the countys Oracle system modernization, voted to oppose a FirstEnergy rate increase application at the PUCO, approved several small grants and routine budget/resolution items, and entered executive session.

Discussion Points

  • •Commissioners argued for formal opposition and more public participation.
  • •Item presented as a calendar-year 2026 partnership award.
  • •Need to distinguish LCIS technical support vs System Solutions functional support; Freshservice ticketing process clarified.
  • •No extended public debate; moved and approved on roll call.
  • •No substantive debate recorded.
  • •OMB explained amounts and rationale: amortize rolling notes instead of renewing without principal paydown.
  • •Presenter said county typically receives 30% of interlocal JAG awards and will use funds for equipment and training.
  • •Staff outlined PUCO process and potential customer impacts.
  • •Transcript records ambiguous award amount that was not clarified on the record.

Decisions

  • •Board voted to oppose the application as written.
  • •Finance package approved by the board.
  • •Grant acceptance approved by roll call.
  • •Grant approved by roll call.

Directions

  • •OMB to execute agreement and report as required.
  • •OMB to execute financing and report back as required.
  • •Sheriff's Office to finalize interlocal paperwork and budget for county share.
  • •Staff to continue cleanup and provide updates on integrations and learning module deployment.
  • •Staff to monitor the docket and provide updates to the board.
25
Aug

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Lucas County commissioners met to consider a one-year lease renewal for Boyd and Associates at Spencer Township Neighborhood Center (tabled), to advertise a roof repair at the Lucas County Recreation Center (architect estimate $300,000; approved to proceed to advertise), and to rescind a five-year lease and approve purchase of a Freightliner truck using Sourcewell pricing (approved).

Discussion Points

  • •Extent of disrepair at Rec Hall 1; architect estimate of $300,000; capital amendment previously approved to fund the work.
  • •Vehicle price of $638,330, Sourcewell discount of $14,008.52, expected $150,000 trade-in value, and funding split between water and sewer funds.
  • •Whether Boyd and Associates is a current tenant and whether the county intends to dispose of the property; timing and appropriateness of a one-year lease while pursuing disposition.

Decisions

  • •Authorization to advertise for roof repairs (approved).
  • •Motion to table the lease request (unanimous).
  • •Rescind lease and approve purchase (approved).

Directions

  • •Proceed to advertise for the roof repair project; staff to return with bids and contract recommendation.
  • •Proceed with purchase under Sourcewell pricing and trade-in; staff to document funding split.
  • •Staff to check lease language and any out clause with Jeff Teague and return with clarification.
18
Aug

Board of County Commissioners Regular Meeting

Ohio/Lucas County

Board of County Commissioners of Lucas County met August 18; items included an HR strategic-plan update (onboarding, a new LMS, and policy standardization), multiple contract and grant approvals (records storage RFP, sheriff grant applications, juvenile court agreements, CHIP mortgage release), several capital project advertisements, and personnel actions following an executive session.

Discussion Points

  • •Acceptance of opioid remediation funds.
  • •Annual build-a-bike program and funding source (Ohio DYS grant).
  • •Aramark contract renewal and amendment for correctional food services.
  • •Authorization to advertise for domestic-violence shelter providers under specific ORC citation.
  • •Certification of delinquent sewer and water charges across townships.
  • •Consolidated monthly focused onboarding to improve new-employee orientation and reduce redundant department-level sessions.
  • •Continuation of enforcement and victim-services grant applications.
  • •Details of CHIP mortgage: original amount $28,818, remaining payoff $5,763; taxes current and borrower still in residence.
  • •Estimated volume: ~37,000 boxes; move timeline 2–3 months if vendor changes.
  • •Executive session topics: appointments, promotions, collective bargaining, discipline, purchase/sale of property, pending or imminent court action; legal counsel present.
  • •Fund adjustments to cover health insurance increases and align grant budgets.
  • •HUD requirement for five-year anti-displacement plan for CDBG allocations.
  • •Medical staffing and Aramark food-service arrangements (37¢ per meal).
  • •Mental-health service scope (medication management, psychotherapy, telemedicine).
  • •Official-intent declarations for multiple waterline and pump station projects.
  • •One chiller at the juvenile justice center is out of service and requires repair.
  • •Policy standardization lifecycle: research, draft, bargaining-unit review (10 days), director review, then commission consideration.
  • •Public personnel actions approved with stated compensation rates and probationary periods.
  • •Purchase and Oracle integration of Biz Library LMS with 14,000 trainings in 8 languages to allow job-coded and push/pull training deployment.
  • •State term contract ended; necessity to reprocure storage services.
  • •Two North Building boilers remain to be replaced from prior renovation.
  • •WERF intents for equipment replacement at the treatment works.

Decisions

  • •Authorize advertising the records-storage RFP.

Directions

  • •Aramark amendment to be executed as approved.
  • •Clerk to advertise RFP and proceed with procurement.
  • •Economic Development to file the adopted plan and record the mortgage release.
  • •Facilities to advertise both projects and pursue procurement.
  • •HR to proceed with integration phases for Biz Library and Oracle (phase 1 high-compliance trainings; phase 2 full library by year-end).
  • •HR to process hiring and promotion paperwork in accordance with collective bargaining agreements.
  • •HR to revise onboarding pilot based on feedback and prepare launch in September.
  • •Juvenile Court to finalize agreements and proceed.
  • •OMB to file appropriation changes and publish the domestic-violence provider application per ORC 3113.35.
  • •Sanitary Engineer to proceed with OPWC applications and project planning.
  • •Sheriff's Office to submit grant applications and execute food-service amendment as authorized.
Lisa A. Sobecki
County Commissioner, President
Anita Lopez
County Commissioner
Pete Gerken
County Commissioner