The Haralson County Board of Commissioners heard public comments on a proposed industrial rezoning and considered construction, tax, event-support, fire-equipment and road-striping matters. The transcript records no final vote on the items discussed.
Discussion Points
•A Board of Assessors representative requested further review with counsel and the assessors.
•A speaker explained the difference between a clerical-error refund request and an assessment appeal.
•A staff speaker described the assessors’ existing review and recommendation role and the possibility of delegating authority.
•Commenters disagreed about likely effects on neighboring homes, property values and county revenue.
•Kellum sought a refund based on alleged factual errors and cited property-record information and comparable sales.
•Participants raised scheduling concerns related to weather and the amount of striping work.
•The applicant proposed rezoning two parcels to I-1 light industrial, with conditions and a buffer.
•The contractor presented the proposed Part 2 maximum and described project savings and anticipated donations.
•The fire department sought permission to sell older air packs and use proceeds toward replacement packs.
•The presenter described a proposed budget-line shift and asserted the total would not increase.
•Two bids were opened with different stated pricing formats.
•Welch requested a $2,000 contribution and use of county buses, describing event transportation and tourism.
Directions
•A recommendation was sought for the voting meeting, but none is recorded.
•The chair said the matter would proceed with legal counsel.
•The item was moved to the voting meeting for consideration.
The Haralson County Board of Commissioners is scheduled to consider a construction GMP, policy updates, vehicle disposal and a rezoning request. The regular meeting is listed for Nov. 17, 2026, at 6 p.m. in Buchanan; the rezoning notice separately lists its public hearing for 5 p.m.
Discussion Points
•The applicant requests rezoning and a related comprehensive land-use map amendment, subject to proposed conditions.
•The application previously went back to the Planning Commission for reconsideration of its site plan and conditions.
•The estimate details the construction scope and proposed GMP amount.
•The proposal would replace fixed meal and mileage reimbursement amounts with rates established by federal agencies.
•The proposed written policy would formalize an existing vacation cash-out practice described for the Sheriff’s Office and Fire Department.
•The request states that county policy requires board authorization before vehicle disposal.
•The Sheriff’s Office requests authorization to crush eight listed vehicles as scrap.
•The staff report says the total budget effect is difficult to assess because department travel varies.
Haralson County commissioners heard competing presentations about telephone, internet and IT services, including proposed costs, existing contracts, network security and a possible transition. No vote or decision is recorded in the transcript.
Discussion Points
•Commissioners asked about the phone price and why replacement handsets were being offered at no charge.
•Digital Agent and Sync Global presented differing views on whether existing firewalls and switches needed replacement.
•Participants raised questions about existing Parker Fiber commitments and whether overlapping IT or network services would result in duplicate costs.
•Sync Global presented a $5,279.53 monthly option and said it could produce $6,144.90 in monthly savings if certain existing services were discontinued.
•The Digital Agent presenter said the $3,000 monthly managed-core charge was largely for on-site labor and monitoring.
•The presenter described an AT&T backup circuit, Parker Fiber connectivity between the 911 center and sheriff’s office, and 107 no-line-item-cost handset replacements.
•The presenter described potential communications, election-department and cybersecurity benefits of a private fiber network.
•The presenter estimated possible site costs but said some individual fire station bills had not been reviewed.
•The presenter said phone number transfers could be staged over 30 to 45 days with training and no anticipated service lapse.
•The presenter said the fire stations appeared to use separate circuits and hotspots rather than one managed network.
•The presenter warned that splitting equipment management could delay troubleshooting and raised cybersecurity and software-license concerns.
The Haralson County Board of Commissioners reviewed proposals for phone services and managed IT services, including cost, transition, cybersecurity and staffing considerations. Commissioners discussed a possible additional work session before expected Tuesday votes, but this transcript records no vendor selection or formal vote.
Discussion Points
•A commissioner proposed month-to-month outside support and an employee job description.
•A later Tuesday meeting was expected to address phone and IT selections.
•Bids varied in tax treatment, circuits, installation charges, handset provision and on-site support.
•Commissioners considered a Monday work session with the attorney, IT consultant and vendors to clarify proposal and contract questions.
•Commissioners discussed possible connectivity benefits and concerns about vendor ownership and future labor costs.
•Commissioners discussed whether further bidding or negotiations could create procedural fairness issues.
•Commissioners emphasized complete cost estimates, prompt support and provider experience.
•Commissioners raised cybersecurity and ransomware concerns.
•Fifteen providers submitted managed IT proposals with different service coverage and pricing structures.
•Four proposals were identified by the consultant as appearing to meet phone-service needs.
•The consultant cautioned that moving telephone numbers could involve a lengthy transition and overlapping costs.
•The consultant estimated approximately $2 million over three years for two employees and necessary tools and infrastructure.
•The consultant identified four possible-fit firms but said some required services and costs were not included or specified.
•The county attorney had not yet determined whether the county could exit or restructure the existing agreement.
•The county's Parker Fiber commitment and its monthly cost could affect the total cost of a bundled alternative.
•The IT consultant recommended hiring and training county technology staff while retaining outside support during the transition.
Directions
•A commissioner proposed seeking legal review and holding a possible Monday work session with relevant parties.
•A commissioner proposed seeking the county attorney's advice before deciding whether to hold the additional work session or proceed with later negotiations.
•A commissioner said they would seek more information from another county's chair; no formal assignment or deadline was adopted.
The Haralson County Board of Commissioners has a special called work session scheduled for Nov. 13, 2026. Its agenda lists a summary of bids for managed IT and phones/circuit services.
Special-called Haralson County commission meeting to consider the countys 2026 budget and tax levies; commissioners approved the budget after public comment and debate about assessment backlogs and meeting timing.
Discussion Points
•Backlog of assessment correction orders at tax commissioner's office
•Canvassing in 2024 led to new growth being added to the digest
•Clarification of prior-year budget variance and source of funds
•Question and acceptance of rates
•Read-through of millage rates and district levies
•Source of $2M variance between prior-year actuals and budget figures
•Timing of meetings and public access to hearings
•Whether commissioners had sufficient time for line-by-line review with department heads
•Whether delayed tax collections were moved into the new budget year
Decisions
•Adopt 2627 budget resolution
•Adopt the 2026 millage and district levies
Directions
•Clerk to file resolution and certify rates
•Consider software to better pair assessor and tax commissioner systems in future years
•Finance to file adopted budget with tax commissioner and state revenue department
The Haralson County Board of Commissioners held a special called meeting scheduled Oct. 30, 2026, in Buchanan to hold public hearings on the 2026-2027 county budget and the five-year digest/millage rate and to consider resolutions to adopt the budget and to levy taxes.
Discussion Points
•Public hearing on five-year digest/millage rate was scheduled.
•Public hearing on the proposed 2026-2027 budget was scheduled.
Haralson County Board of Commissioners work session covered personnel policy updates (vacation cash‑out, holidays, travel reimbursements), a discussion of raising the personal property taxable-threshold, consideration of creating a standalone EMA director position (tabled), three audits and the planned liquidation of old county vehicles, and an RFP process for IT/cybersecurity and phone services with multiple vendor presentations.
Discussion Points
•Advisor recommended waiting until a new fire chief is in place.
•Commissioners asked finance to quantify the fiscal impact before adoption.
•Commissioners debated who would bear shifted tax burden and the size of millage changes.
•EMA duties include EOC management, grants and state coordination.
•Ratio study result 39.95; three‑year audit due next week; potential third audit cost around $20,000.
•RFPs close next Tuesday; consultant will evaluate technical bids and present findings.
•Staff described the proposed handbook language and operational details (40‑hour cash‑out cap, 240‑hour accrual cap, 80‑hour minimum).
•Staff presented digest impact estimates for threshold increases to $100,000 and $250,000.
•Sync Global/Crossbeam previewed a county‑wide fiber and equipment alternative with no one‑time capital cost for the county.
Decisions
•Item tabled; no vote recorded.
•No procurement decisions made; certified sealed proposals will be evaluated.
•No vote; item deferred pending analysis.
•No vote taken.
•No vote taken; item set for further study.
Directions
•Commissioners asked to review vendor materials and consultant will provide evaluation.
•Commissioners to review three‑year audit and decide on further audit action.
•Finance to run cost analysis for countywide implementation.
•Staff to prepare detailed fiscal analysis with finance director and return to board.
•Table the item until the board has named a new fire chief.
At its October 13 meeting the Haralson County Planning & Zoning Commission took no final action on a rezoning request for property owned by Atlanta Structural/ASC (recently acquired by Tyndall), voting instead to send a recommendation back to the Board of Commissioners. Company representatives described buffers and job benefits; multiple neighbors raised concerns about noise, lights, runoff and property values.
Discussion Points
•Applicant described larger buffers (150 ft) than county minimums
•Applicant said laydown yard will not host production; potential small maintenance shops may be added
•Calls for amber/directional lighting, sound barriers, and retention of agricultural buffer
•Chair moved to take no action and forward the matter to the Board of Commissioners
•Commissioners described the process as unusual and cautioned about precedent
•Counsel requested that the commission hear testimony and public comment despite procedural concerns
•Equity concerns raised about impact to a predominantly Black neighborhood
•Health and safety concerns: asthma/COPD, truck traffic, road wear
•Staff explanation that the Board of Commissioners had referred amended materials back to planning commission
•Staff said the board expressly asked the commission to review changes
•Whether Haralson County Code §50-292's 12-month restriction prevents rehearing the same property
•Whether the 12-month limit for reapplication applies when the Board of Commissioners refers an amended application back to planning commission
Decisions
•Motion passed 4–0 to forward to commissioners
•Motion passed to take no action and send recommendation to commissioners (4–0)
Directions
•Forward the recommendation and record no final action; Board of Commissioners to consider on November 17
Haralson County Board of Commissioners Live Stream
Haralson County work session covered consolidating meetings to once monthly, a proposed standardized road-abandonment application and fee schedule (vote set for Oct. 6), donation and disposition of rescue/fire vehicles, a GIS procurement bid from a local vendor, creation of a county vehicle maintenance division, and extended public comments calling for greater agenda transparency.
Discussion Points
•1996 apparatus had a major overhaul in 2024 (~$12,335) and likely needs another rebuild; selling it would free funds for other equipment.
•2005 rescue truck has been out of service for ~2 years and lacks paperwork; Carroll County expressed interest in refurbishing it.
•Board members acknowledged recent investments in livestreaming and clerk efforts to post documents when available.
•Board must decide whether to charge an application fee and, if so, how much.
•County currently spends substantial outside labor on vehicle repairs; cited figures include the fire department's spend and sheriff's office maintenance lines.
•Janice Daniel asked that documents and backup be submitted to the clerk in advance so they can be included in agenda packets and online downloads.
•Need to require affidavit of ownership and consent of adjoining landowners; process involves title checks, legal descriptions and recording fees.
•Petitioners say the spur has not been maintained since approx. 1997 and is unused by the traveling public.
•Proposal envisions hiring mechanics, creating preventive-maintenance schedules, performing warranty work and reducing vehicle downtime.
•Staff explained required steps: application, advertisement, public hearing, formal vote and deed preparation.
•Staff should prepare a fee schedule and return it for a formal vote.
•State expectations require updated imagery and GIS capability; options include national vendors and a local capture/vendor that offers licensing and asset management.
•Vendor offered capture pricing: $130,000 (or $100,000 if paid upfront) and $10,000/month for up to 50 user licenses; vendor suggested monetization of data to offset costs.
Directions
•Board requested staff and presenters to provide materials to the clerk ahead of meetings when possible.
•Petitioners may pick up the finalized application and fee and submit it to the roads department; staff to process and advertise once received.
•Place donation and sale items on Oct. 6 agenda for formal board approval.
•Staff asked to prepare implementation details including staffing levels, cost estimates and how to reallocate existing maintenance budgets.
•Staff to examine funding sources (SPLOST, departmental contributions) and return a procurement/funding recommendation for Oct. 6.
•Staff to present fee proposal and finalized application for Oct. 6 voting meeting.
Haralson County Board of Commissioners Meeting September 1st, 2026
Haralson County Commission meeting with public comments focused on a proposed data-center-related land sale and transparency concerns; commissioners approved routine minutes/agenda items and voted to renew an ambulance services contract while hearing a conditional-use/annexation request and an intergovernmental agreement for a small parcel.
Discussion Points
•Agency official said contract has been in place since 1995; contract requires three dedicated emergency ambulances.
•Board indicated the matter was premature for final approval until annexation/survey and planning review occurred.
•Chair described parcel on Buck and Bypass adjacent to county health department and railroad.
•Chair read parcel and tax map details; counsel explained annexation and survey requirements.
•Commissioner explained the county vote would not approve or deny any project; city annexation and zoning remain critical.
•Commissioners clarified the vote before them would allow the development authority to handle sale/transfer but would not itself approve a data center or override annexation/city approvals.
•Committee member asked for parcel description and planning next steps; motion and second recorded but no vote tally provided.
•Public commenters expressed distrust over lack of posted documents about IGA and future use; asked for transparent studies and public meetings.
•Residents asked why the development authority membership had been expanded and who represents the community on the authority.
•Speakers raised operational issues about patient transfers and 'wild time' where ambulances remain at hospitals, reducing county coverage.
Decisions
•Motion to approve payment under AmityCare contract passed (no recorded opposition in provided segments).
•No final amendment vote recorded in the provided segments.
•No final approval recorded during the supplied segments.
•No final decision recorded in provided segments; item deferred for necessary steps.
•No final decision recorded in provided transcript segments to change the intergovernmental agreement; matter remained under discussion.
Directions
•Commissioners offered to answer individual questions after the meeting and to clarify steps for annexation and city approvals.
•Commissioners offered to meet with residents after the meeting to answer questions and provide clarification.
•Send item to planning and zoning and require survey documentation and public notice.
•Staff to follow up with transfer statistics and operational details.
•Staff to provide clearer parcel description, survey and planning requirements before final action.
Haralson County Board of Commissioners Meeting August 18th, 2026
A Haralson County work session featured an external review of the county fire department that criticized governance and recommended a multi-year plan for equipment, staffing and HR reforms; the tax office reported improved assessment metrics; and a developer requested county approval to accept a property deanexation to support a Super Petroleum development.
Discussion Points
•Assessor concluded governance, not frontline personnel, is the primary problem; commissioners asked how to limit their direct operational involvement.
•Assessor described jury‑rigged ladder straps and rising apparatus costs; recommended phased replacement and fleet tracking.
•Commissioners asked questions about contiguity and service capacity.
•Developer requested county acceptance of deanexed parcel to enable re‑annexation into the city and to provide water/sewer service; indicated company will build infrastructure.
•Recommend staffing baseline of two per apparatus and eventual goal of three; turnover of experienced staff noted as a major issue.
•Tax office reported improved ratios; public utilities' ratio and valuation gap noted.
•Three briefings given; no votes taken.
Decisions
•Called meeting canceled and moved to September; annexation to be scheduled.
•No formal action during session.
•No formal vote taken.
•No formal vote taken; assessor to remain available for assistance.
•No funding decisions taken at session.
•No vote; item to be scheduled for a future meeting.
Directions
•Assessor advised compensation study and objective promotion standards with HR oversight.
•Assessor recommended board adopt a governance policy and integrate HR/legal review into personnel/promotion processes.
•Assessor recommended independent safety inspections and an apparatus inventory led by the new fire chief.
•Clerk/staff to place item on a future agenda for formal consideration and notify city for intergovernmental coordination.
•Clerk to schedule annexation item; staff to compile assessor recommendations for further review.
•Continue monitoring and addressing uniformity and valuation issues.
Haralson County Board of Commissioners Meeting August 4th, 2026
At a Haralson County commission meeting, RBW Services Group requested a conditional-use permit for a proposed wireless communications tower on a 22.73-acre agricultural parcel; commissioners heard a presentation and questions but took no formal vote on the request. The meeting included a public comment by Linda Smith of the Haralson County Public Authority and a motion to move into executive session for personnel, litigation and land acquisition.
Discussion Points
•Applicant described tower, compound, and coverage maps; committee asked about carrier access and fall radius; applicant said co-location would be allowed in future and tower would be engineered to limit hazard.
•Chair stated intent to discuss personnel, litigation and land acquisition in executive session.
•Community announcement about a Saturday event and annual scholarship presentations.
Decisions
•No county action recorded.
•No decision recorded in provided transcript segments.
•No resolution, vote or conclusions recorded in the public transcript.
Haralson County Board of Commissioners Meeting July 21st, 2026
Haralson County Board of Commissioners met June 21 to adjust the agenda, discuss a service contract rate increase, hear public comment on the county courthouse/historical building and library lease, review a site-plan request from Tender Corporation, and receive extended public comment about property tax assessments and the tax assessor's office.
Discussion Points
•Applicant described buffer zones on Monroe Road and Old Jacksonville Road and internal layout for production and storage
•Board agreed deferral until budget hearings
•Commissioners asked staff to follow up off-agenda
•Commissioners clarified the assessor's office and assessor board govern valuation and personnel
•Commissioners noted the revised plan differed from the prior planning submission and recommended re-review by planning staff
•Commissioners want vendor present and written contract breakdown
•County provides $26,000 distributed across three county libraries and $33,000 specifically to the Botanic Library
•Long-term operations depend on lease outcomes and county budget decisions
•Regional system can provide bookmobile and outreach as interim services
•Resident alleged incompetence and potential conflict, asked for recusal of Ryan Farmer
Haralson County Board of Commissioners held a special called meeting agenda for July 21, 2026, listing a rezoning request by Tindall Corporation, consideration of the county manager position, and a magistrate court lease; the agenda set each as a vote item.
The Haralson County Board of Commissioners was scheduled to consider a handful of local items on July 21, 2026, including a Historical Society lease renegotiation request and a church request to retain deeded property; several personnel and pay items were also listed.
Discussion Points
•Agenda cites lease provision that property reverts to the church if rideshare is no longer needed.
Haralson County Board of Planning and Zoning Meeting July 14th, 2026
Chris Reynolds of RBW Services Group presented a conditional-use permit request for a 235-foot Verizon cell tower called "Copper Rock" on parcel 00980073 in Haralson County; nearby residents asked about exact siting, health effects, fire risk, maintenance and lease terms. No formal vote was recorded; the presentation closed with the applicant offering contact information and a promise to provide permit documentation.
Discussion Points
•Applicant presentation of CUP for 235-foot tower and technical rationale.
•Residents asked about exact site location, health/radiation concerns, fire and structural risk, lease length, maintenance and access to application documents.
Decisions
•No formal decision or vote recorded during this session.
Directions
•Applicant offered to provide documentation and contact information for follow-up; engineering and permitting documents to be filed through building-permit process if CUP approved.
Haralson County Board of Commissioners Meeting July 7th, 2026
A Haralson County meeting opened with a prayer and moved through routine approvals before a public hearing on a proposed partial road abandonment; Public Works described a landowner request affecting a 144-acre parcel and residents raised rezoning and First Amendment concerns during public comment.
Discussion Points
•A commenter raised First Amendment and transparency concerns, requesting disclosure about NDAs and meetings with Tallapoosa officials.
•A resident speaker warned rezoning the parcel as 'light industrial' could set a harmful precedent and urged adherence to the county comprehensive plan.
•Public Works described a landowner request to abandon a portion of road inside a 144-acre parcel and noted the road segment is not used to reach other properties.
Decisions
•Approval of minutes and agenda (recorded by voice/gesture).
•Motion to adjourn carried.
Directions
•No formal direction to staff recorded in the transcript; Public Works listed the procedural context for abandonment and noted historical easement date (1990).
Haralson County Board of Commissioners Meeting June 16th, 2026
Haralson County commission held a public hearing on a rezoning request from Atlanta Structural Concrete (ASC), heard public comments for and against, approved a server upgrade after a presentation about cyber and backup risk, placed a one-cent sales-tax rollback (HB581) on the November ballot for voter consideration, and approved several routine items including terminating an unused Nationwide retirement plan and a lighting upgrade for county courts/recreation facilities.
Discussion Points
•ASC requested rezoning from R2/R1 to industrial to create uniform zoning across a site on Mono Road and offered mitigation conditions (75‑ft buffer; exclusion of 25‑acre parcel with transmission lines).
•Board placed HB581 rollback on the ballot and clarified its limited legal uses for property tax rollback.
•Board voted to terminate the legacy Nationwide retirement plan and approved several procurement and agenda motions.
•CIO explained single physical server hosts many virtualized county services and described backup and archival limitations.
•CIO proposed new hardware and migration off a subscription model to mitigate vendor subscription cost increases.
•Residents contended rezoning would increase dust, truck traffic, lighting and lower property values; ASC emphasized jobs, compliance with environmental rules and a complaints/driver discipline policy.
Decisions
•Board approved server upgrade motion by voice vote.
•Multiple motions carried by voice vote; no fiscal changes from HB581 were enacted by the board without voter approval.
Directions
•Staff to coordinate ballot language, procurement and participant outreach and return to the board with final documents.
•Staff to proceed with procurement steps and return with vendor options and finalized pricing.
Haralson County Board of Commissioners held a special called work session, joint with Haralson County municipalities, scheduled June 4, 2026. The agenda listed two discussion items: "FLOST/LHOST Discussions" and "TSPLOST Discussions."
Brian L. Walker
Chairman and CEO, Board of Commissioners — At-Large