11/2/2026 Carroll County Public Service Authority Meeting.
Carroll County Public Service Authority held its November 2 meeting where the board approved minutes and multiple routine contracts, authorized a loan to fund an Exit 1 wastewater consent order, approved as‑needed engineering agreements, selected firms for Exit 1 design work, approved $171,000 in bad‑debt write‑offs for auditing purposes, and agreed to extend a water line for three lots at Beemer's Knob.
Discussion Points
•A member moved to approve the extension and the board voted in favor.
•Board asked for clarification on whether penalties/fees included in the $171,000 figure would be removed for ledger reporting.
•Board confirmed motion to select RETAR and moved to vote.
•Board confirmed that the agreement does not guarantee work and is intended for small or non‑grant tasks.
•Board discussed whether that attorney will also serve the PSA and suggested staff check availability.
•Board recalled a prior discussion and that the plat showed water was paid/offered for the lots.
•Dana explained auditors had requested write‑offs, legacy system conversion shows older items, and penalties in the system inflate receivable totals.
•Staff described updated quotes for Exit 1 consent‑order work and proposed increasing loan authorization to $700,000.
•Staff explained purpose of an RFP to shortlist engineering firms for civil/mechanical/architectural work.
•Staff noted RD/parity processes in Washington will be required for loan approval.
•Staff noted the county hired a new county attorney whose primary duties are with the board of supervisors.
•Staff provided monthly payment estimate ($6,891.08) and loan term/interest info in packet.
•Staff recommended RETAR Engineering citing prior work and a proposal included in the packet.
•Staff summarized Rinker Design as the purchaser of The Lane Group and described project financing as mostly grant plus loan.
Decisions
•Board accepted Rinker Design as project designer and authorized staff to proceed with engineering steps.
•Board accepted the shortlist and authorized staff to proceed with associated procurement steps.
•Board approved recommended write‑offs; staff to document the process for auditors.
•Board approved selecting RETAR Engineering to perform the work.
•Board approved the motion to authorize the loan authorization up to $700,000 and allowed staff to sign loan documents.
•Board approved the water‑line extension for the three lots.
•Board directed staff to reach out to the county attorney and to schedule PSA director interviews, preferring multiple interviews on a single afternoon.
Directions
•Approve write‑offs for audit cleanup and retain files for possible later collection.
•Authorize staff to sign loan documents and proceed with engineering procurement once funding is available.
•Proceed with design and submit RD documents as required.
•Staff to contact the county attorney to confirm PSA representation; if unavailable, staff to seek alternate counsel.
•Staff to coordinate and schedule formal interviews for the PSA director and involve board interviewers.
•Staff to finalize and return executed agreements as needed.
•Staff to finalize contract and scope for consent‑order tasks.
•Staff to proceed with extension planning under PSA procedures.
11/2/2026 Carroll County Board of Supervisors Meeting.
Carroll County Board of Supervisors met Nov. 2, 2026. The board certified a closed session, adopted a permanent data-center ordinance after a public hearing, approved an unclaimed-property ordinance and several routine items, accepted an opioid settlement payment, approved nonprofit grants, and voted on a performance agreement tied to a proposed data-center project.
Discussion Points
•Board members stressed ordinances and water restrictions as protective tools
•Collins worried the clause removes future oversight if the end user is unknown
•Concerns about long-term water demand, property values and generator emissions were raised
•Contract language in Section 7 that 'agrees not to disapprove the project in the future' raised concern
•No public speakers signed up
•Ordinance implements statutory disposal of unclaimed property
•Questions about water use, generator emissions, noise, and property values
•Resident testimony urging permanent ordinance
•Supervisor Collins objected to performance agreement language limiting future local discretion.
•Tour participants described noise, water-recycling, community hiring and educational programs at the Google facility
Decisions
•Ordinance adopted
•Performance agreement accepted with recorded dissent
•Permanent adoption of data-center ordinance
Directions
•County administration and sheriff to implement procedures
•County attorney involvement to clarify implications; board to continue public engagement
•County staff to provide ordinance and water-restriction documentation to residents
•County staff to provide ordinance copies and engage developers in future community meetings if proposals move forward
•County to host developer presentations and community meetings if proposals move forward
The Carroll County Board of Supervisors was scheduled to meet Nov. 2, 2026, to hold two public hearings (a proposed data center ordinance and a proposed unclaimed‑property ordinance) and consider several routine and new‑business items including acceptance of opioid‑related funds, nonprofit grants and a performance agreement.
10/27/2026 Carroll County Economic Development Authority Meeting.
Carroll County Economic Development Authority held a regularly scheduled meeting on 2026-10-27. The board approved minutes and the treasurer's report, authorized a new billboard installation, convened and certified a closed session under Virginia FOIA, and voted to discontinue the county's contract with BSGA Group effective this month.
Discussion Points
•Board agreed to leave southbound sign unchanged.
•Board certified closed session conformance with Virginia FOIA on return to open session.
•Chair cited statutory basis for closed session.
•Chair solicited motion to approve treasurer's report and pay October invoices.
•Committee member presented Skyway Outdoor estimate of $4,496.23, 50% deposit required, 4–6 week turnaround.
•Committee member proposed termination of the BSGA Group contract effective this month.
•Minutes approved; treasurer's report approved with payment of October invoices; billboard installation approved based on Skyway Outdoor estimate; closed session taken and certified under Virginia statute; motion to discontinue BSGA Group contract made and passed.
•No detailed invoice amounts were discussed in the public meeting.
•No reasons or implementation details were provided in the public transcript.
Decisions
•All noted motions were approved during the meeting.
•Closed session certified as lawful by recorded member certifications.
•Motion approved to pay October invoices.
•Motion carried to place the northbound sign on county property.
•Motion to discontinue the contract was approved.
Directions
•Authorize vendor to proceed pending deposit payment.
•Follow-up needed to clarify invoice totals and contract details for BSGA Group.
The Carroll County Board of Supervisors held a called meeting Oct. 26, 2026, and voted 4-1 to retain Guynn Waddell PC as county legal counsel; Supervisor Jody Early cast the only dissent. The board completed routine opening items and promptly adjourned.
Discussion Points
•Board voted to retain new counsel and then voted to adjourn.
•Chair Dickson said interviews were held and the board decided to move forward with Guynn Waddell PC.
•Invocation and pledge preceded business.
•Supervisor Jody Early said changing counsel was unnecessary and praised Sands Anderson and Steve Durbin.
Decisions
•Adjournment approved following the counsel retention vote.
•Board voted to retain Guynn Waddell PC as county legal counsel, effective Oct. 26, 2026.
On 2026-10-26 the Carroll County board of advisers voted 4-1 to retain a new law firm, then moved to adjourn; one member said switching counsel at this time was unnecessary and praised the county's current attorneys.
Discussion Points
•A board member objected, calling the change unnecessary and citing satisfaction with current counsel (Sands Anderson and Steve Durbin).
•Adjournment was procedural and expeditious.
•Chair introduced item and recommended moving forward with the firm identified in the transcript as 'Gwen Waddle, PC'.
•Legal services item included discussion and a dissenting comment.
•Member characterized the timing of a counsel change as inappropriate given county circumstances.
•Member cited satisfaction with 'Sands Anderson' and attorney 'Steve Durbin' as reason to retain incumbent counsel.
Decisions
•Board voted 4-1 to retain the firm identified in the transcript as 'Gwen Waddle, PC' effective Oct. 26, 2026.
10/7/2026 Carroll County Board of Supervisors Called Meeting.
The Carroll County Board of Supervisors convened, held a closed session to interview candidates for county attorney, certified that the closed session complied with the Virginia Freedom of Information Act, heard that legal-services firm interviews had taken place with no decision yet, approved a committee appointment for an alternate to a regional board, and then adjourned.
Discussion Points
•Chair said the board interviewed a couple of firms for legal services.
•Chair stated the purpose of the closed session was to interview county attorney candidates.
•Motion to nominate Horton and stated term dates.
•Opening invocation and pledge; closed session for interviews; legal-services interviews update; appointment vote; adjournment.
Decisions
•Appointment passed; Horton abstained.
•Certification of closed session; appointment of Horton; adjournment.
•Certification of closed session compliance passed by roll-call.
The Carroll County Board of Supervisors met in a called session on Oct. 7, 2026, held a closed session under Virginia Code §2.2-3711 to discuss personnel and probable litigation, certified the legality of that closed session, heard a short legal-services update, approved a committee appointment (with one abstention), and then adjourned.
Discussion Points
•Board invoked Va. Code §2.2-3711 to discuss personnel and probable litigation and interviewed county attorney in closed session.
•Dickson reported interviews of law firms; no decision announced.
•Motion to nominate Horton as alternate; Horton abstained from the vote.
Decisions
•Board adopted certification that closed session complied with state law.
•Horton appointed as BRCEDA alternate for remainder of alternate term through Dec. 31, 2028.
Carroll County Public Service Authority Meeting 10/05/2026
Carroll County Public Service Authority met Oct. 5, 2026. The board certified a recently completed closed session under Virginia FOIA, heard public comments urging restrictions on new data center siting and water use, approved minutes and invoices, received an update on the Cana tank connection, and closed after board member comments and follow-ups.
Discussion Points
•Chair explicitly named Va. Code §2.2‑3711(A)(1) and (A)(6) as the authority to close the meeting.
•Members acknowledged public concerns and committed to staff follow‑up and planning.
•Mister Dixon raised the need to research fines or penalties for exceeding limits.
•Motions to approve minutes and invoices were made and seconded.
•Proposal requests county adopt three mandatory design criteria for new data centers: reuse existing commercial/industrial structures, fund in‑county solar parking, and require low‑water cooling systems.
•Resident asked whether PSA would consent to Project Lightning exceeding an indicated $40,000 cap and questioned monitoring and enforcement.
•Staff reported no new information on the Cana tank connection beyond prior meeting materials.
Decisions
•Board read and recorded certification; each member verbally certified compliance.
•Minutes and invoices were approved by recorded affirmative votes.
Directions
•Board requested staff follow‑up and discussion; no formal enforcement policy or motion was recorded.
•Board to request staff research enforcement options and prepare a plan to address water‑use questions.
•Request referred to staff for consideration and potential ordinance drafting (no formal direction recorded at meeting).
10/5/2026 Carroll County Board of Supervisors Meeting.
The Carroll County Board of Supervisors met Oct. 5, 2026. After a closed session to interview Woodlawn Ag Committee candidates, the board heard a lengthy public comment period focused on a proposed 2026 participation agreement with the Blue Ridge Crossroads Economic Development Authority (Reseda/"Proceed/Preseda") and data-center concerns; the board voted to not accept the 2026 participation agreement and approved several routine items including CIP funding and committee appointments.
Discussion Points
•Appointments will be processed administratively.
•Board completed appointments after closed-session interviews earlier in the meeting.
•Board emphasized water protections and the need for enforceable standards in any future development.
•Carroll Cares explained the role of a long-term recovery group to fill gaps after state/federal response recedes.
•Chair requested staff to place the ordinance on the November public hearing calendar.
•CIP includes recurring replacements and one-time items such as IT equipment and life packs; initial funds allocated for EMS facility engineering.
•Engineering shortlist will be available to county, EDA and PSA to reduce repetitive advertisements.
•Group outlined proposed subcommittees (case management, spiritual care, coordination) and partnership with emergency management.
•Public commenters argued the amendment would remove local approval authority and allow Reseda to approve future projects without Carroll County consent.
•Residents cited an $11 billion estimate for a possible data-center project and questioned lack of information about an end user.
•Speakers expressed concern that proposed changes would remove local project-approval powers from the county board and asked supervisors to maintain local control.
•Staff clarified that the 2010 agreement remains in force and that unanimity is required to add property under current terms.
•Supervisors expressed concerns about water use, NDAs and potential long-term environmental impacts.
Decisions
•Appointments approved unanimously.
•Board approved motion to schedule public hearing to consider making temporary water ordinance permanent.
•Board voted to not accept the 2026 participation agreement (motion passed).
•CIP approved; engineering list approved.
Directions
•Group to hold inaugural meeting Oct. 21; staff to consider liaison/support options.
•Procurement to notify shortlisted firms and begin initial EMS engineering procurement steps.
•Residents asked for staff to publish materials, schedule public informational meeting(s), and arrange data-center tours for supervisors and citizens.
•Staff to finalize filings and notify appointees.
•Staff to invite Reseda to a public question-and-answer session and coordinate citizen data-center tours.
•Staff to publish and advertise ordinance for public hearing in November and provide materials for public review.
•Staff to report progress to the board at a future meeting.
Carroll County Board of Supervisors met Oct. 5, 2026. After an extended public-comment period focused on a proposed 2026 participation agreement with the regional economic development authority (Reseda/"Proceed"), the board voted not to accept the 2026 participation agreement. The meeting also included a presentation by a new long-term recovery group (Carroll Cares), routine approvals (CIP, engineering shortlist, plat vacation, holiday schedule), committee appointments and a vote to set a public hearing to adopt a permanent water-usage ordinance.
Discussion Points
•CIP budgets include one-time and recurring capital needs and initial EMS work.
•Engineering roster will be available for county, EDA and PSA to expedite projects.
•Group plans to use an equitable screening process and to partner with United Way, Salvation Army and other local organizations.
•Group’s mission is long-term recovery beyond initial federal/state response; it will coordinate case management, spiritual care and volunteer resources.
•Public commenters argued the amendment would cede local project-approval rights to Reseda and raised concerns about water use, noise, NDAs, and long-term cleanup liabilities.
•Residents repeatedly cited lack of developer presence, missing feasibility and cooling-design details, potential high water usage and the use of NDAs.
•Several residents urged enforceable financial protections (cleanup bonds) and more public input before changing approval authority.
•Supervisors discussed tax-sharing provisions and whether certain tax protections in the 2010 agreement would be lost under the amendment.
Decisions
•Carroll Cares first meeting scheduled for Oct. 21; group to provide regular updates to county staff.
•CIP, engineering-as-needed roster, plat vacation and appointments approved.
•Motion to not accept the 2026 participation agreement carried unanimously; 2010 agreement terms remain in effect.
Directions
•Organize tours of existing data centers for supervisors and interested citizens.
•Procure engineering roster notices to selected firms; record plat vacation documents; notify committee appointees.
•Staff to arrange public information sessions with Reseda and to share feasibility/technical studies when available.
•Staff to circulate Carroll Cares meeting information and to consider volunteers for a data-center tour invitation list.
•Staff to request and post feasibility studies and project documents when available and schedule public Q&A sessions with the regional authority.
At its Oct. 5, 2026 meeting the Carroll County Board of Supervisors rejected a 2026 participation agreement from the Blue Ridge Crossroads EDA after extensive public comment urging local control of land-use decisions; the board also scheduled a public hearing on a proposed Data Center Ordinance and approved routine budget and committee items. Carroll Cares presented a plan to organize long-term disaster recovery volunteers.
Discussion Points
•Board members expressed interest in more information, transparency and a site visit before future commitments.
•Carroll Cares described mission and goals for long-term recovery work.
•CIP includes one-time capital needs and funds to begin EMS facility engineering.
•Concern that Section 7 of the draft 2026 agreement could allow future Wildwood development to proceed without host-locality approval.
•Organizers emphasized volunteer recruitment and case-management capacity.
•Plat vacation affects undeveloped lots and was recommended by planning staff.
•Procurement shortlist intended to streamline hiring for county projects and allow EDA/PSA access.
•Public expressed concern about water caps, noise, environmental cleanup and lack of local control.
•Speakers raised water, noise, tax and cleanup liability concerns tied to large data-center projects.
•Supervisors committed to site visits and additional public outreach.
•Supervisors requested cost estimates and timeline details before moving into construction.
Decisions
•Approve CIP and authorize initial engineering/grading steps.
•Engineering shortlist, plat vacation and appointments approved unanimously.
•First stakeholder meeting scheduled for Oct. 21 at noon.
•Motion to not accept 2026 Participation Agreement passed unanimously; existing 2010 agreement provisions remain in effect.
•Public hearing scheduled for November meeting.
Directions
•Organize data-center tour for supervisors with invited citizens.
•Proceed with shortlist engagements and record plat vacation per standard procedure.
•Staff to invite BRCEDA to a public Q&A.
•Staff to prepare detailed estimates and schedule for EMS facility planning.
•Staff to publish ordinance text and hearing notice and provide data for public review.
•Staff to share county contact info and coordinate stakeholder outreach.
The Carroll County Board of Supervisors convened on 2026-09-29 for a brief session that included an invocation and pledge, a motion and unanimous vote to enter a closed session to interview the county attorney under Va. Code §2.2-3711(A)(1), a certification that the closed session complied with Virginia law, a note that a legal-services interview produced no announcement, and adjournment.
Discussion Points
•Chair announced statutory basis for closed session and identified the purpose as an interview of the county attorney.
•Chair read statutory certification language required by Va. Code §2.2-3711(D).
•Chair stated a legal-services interview occurred but no appointment was announced.
Decisions
•Board members certified that closed session discussions were limited to authorized matters.
•Board voted to convene closed session and later voted to return to open session; no public appointment announced.
•No hiring decision announced; matter remains unresolved in public record.
The Carroll County Board of Supervisors held a called meeting Sept. 29, 2026. The board voted unanimously to enter a closed session under Virginia Code § 2.2-3711(A)(1) to interview a prospective county attorney, later certified the closed session per § 2.2-3711(D), heard that a legal-services interview produced no announcement, and then adjourned.
Discussion Points
•Certification of closed session conducted under § 2.2-3711(D).
•Chair stated an interview for legal services occurred during closed session.
•Motion to enter closed session under Va. Code § 2.2-3711(A)(1) to interview county attorney candidates.
•No appointment or announcement was made at this meeting.
•Roll-call votes to enter and exit closed session were unanimous.
Decisions
•Closed session certification approved by recorded vote.
•Closed session convened for county attorney interviews (no public appointment announced).
•No public action taken regarding legal services; meeting adjourned.
9/22/2026 Carroll County Economic Development Authority Meeting.
Routine Carroll County EDA meeting on Sept. 22, 2026: the board approved August minutes and the treasurer's report, convened a closed session under the Virginia Freedom of Information Act citing Va. Code §2.2-3711(a)(3) and (a)(7), certified compliance on return to open session, and adjourned.
Discussion Points
•Certification read and affirmed aloud by board members.
•No citizens were present for public comment; routine approvals proceeded by motion and voice vote.
•No further business was raised before adjournment.
•On return, the board read and recorded a certification required by the Code of Virginia.
•The closing motion cited specific Code of Virginia provisions as the legal basis for closure.
Decisions
•August minutes approved; treasurer's report approved and invoices authorized for payment.
•Certification recorded; meeting adjourned.
•Closed session convened and certification recorded.
The Carroll County Board of Supervisors and a joint board meeting on 2026-09-15 covered an agenda amendment to discuss appointees, questions about a member's oath and term, a closed session about a Wildwood/Reseda project, reapproval of a remote participation policy, and a motion to review county legal representation.
Discussion Points
•Board asked staff to compile documents for October meeting.
•Board certified on return that only authorized matters were discussed.
•Board promised additional materials at next meeting.
•Chair reviewed past appointment examples and staggered-term practice.
•Clerk reported no oath record for Jody Early in a diligent search.
•Closed session authorized under multiple subsections of Va. Code §2.2-3711 for economic development and negotiations.
•Counsel explained statutory oath consequences differ by office and recommended follow-up.
•Email from Mr. Durbin raised question about Jody Early's term and oath records.
•Motion aims to ensure the county has capable, responsive legal representation.
•Motion preserves current attorney's opportunity to participate and explicitly delays any final decision to an open vote.
•Mr. Early offered to retake oath and refused to resign.
•Purpose cited was to enable members such as Steve Boyer to participate remotely.
•Residents expressed appreciation and urged transparency.
•Staff explained the policy is reauthorized yearly.
Decisions
•Amend the agenda to discuss appointees (passed).
•Approve due-diligence review (passed).
•Enter closed session (passed) and certify compliance on return.
•No formal board action stemming from public comment.
•No immediate removal or termination; matter deferred for document review.
•Reapproval of remote participation policy (passed).
Directions
•Clerk to assemble minutes, appointment records, and oath documentation for review.
•Clerk to locate oath records and compile appointment/minute evidence for the October meeting.
•County Administrator/Clerk to identify candidates and schedule interviews.
•County IT/Clerk to maintain remote participation setup.
•County staff to prepare more information and materials for October meeting.
•Final decision to be taken by the board in open meeting after interviews.
•No immediate changes to appointments; additional review at next meeting.
•Staff to provide information for October meeting.
The Carroll County Board of Supervisors held a joint meeting with BRCEDA where supervisors debated the validity of recent BRCEDA appointment actions, discussed potential economic-development activity at Exit 19 (including data centers) and approved a due-diligence review of county legal representation; the board also entered and certified a closed session under Virginia Code §2.2-3711.
Discussion Points
•BRCEDA and county staff are collecting materials on Exit 19 activity
•Citizens praised board transparency and recent motions related to BRCEDA
•Ensure county has capable and responsive legal counsel
•Legal consultation needs related to the economic-development matters discussed
•Maintain incumbent’s right to participate in review
•Prospective business or expansion discussions at Exit 19 and associated negotiation strategy
•Supervisors and BRCEDA will provide information to the public and discuss further at the October meeting
•Whether lack of a recorded oath in Clerk of Court files vacates a BRCEDA seat
•Whether replacement appointments should be effective Dec. 31 of a staggered term year or effective upon vacancy
•Whether Supervisor Jody Early’s term had expired under BRCEDA bylaws and Virginia statutes
Decisions
•Board approved due-diligence review; no change to representation without separate vote
•Closed session held and certified; matters to remain confidential as allowed by law
•No final action or contract announced
•No reversal of earlier appointments; board proceeded with business while noting legal concerns
Directions
•Board may consider amending replacement effective-dates to Dec. 31, 2026, per attorney recommendation
•Board to bring appropriate public information forward when disclosure will not harm bargaining position
•BRCEDA to share available information with board and public in advance of October meeting
•County staff to gather appointment records and oaths for review before next meeting
•County staff to solicit candidates, schedule interviews and present to board
At its Sept. 14, 2026 meeting the Carroll County Board of Supervisors adopted an emergency ordinance to regulate hyperscale data centers, certified a closed session held under Virginia law, and asked the planning commission to consider comp-plan amendments with a joint public hearing set for Oct. 14 at 6:00 p.m.
Discussion Points
•Certification that the closed session complied with FOIA requirements
•Coordination with planning commission and advertising timeline
•Possible adoption of an emergency ordinance regulating hyperscale data centers
•Scheduling a joint public hearing with the planning commission
•Timing considerations tied to the 60-day statutory limit for emergency ordinances
•Whether to set a joint public hearing and suitable dates
•Whether to use the legal‑counsel consultation exemption in Va. Code §2.2‑3711(a)(8)
Decisions
•Adopt emergency ordinance (approved 5–1)
•Closed session was certified on the record as compliant with Virginia law.
•Set joint public hearing for Oct. 14 at 6:00 p.m.
•Set joint public hearing Oct. 14 at 6:00 p.m.
Directions
•Planning commission to select a date and staff to coordinate notice and logistics
•Request planning commission to consider comp-plan amendments under Va. Code §15.2-2232
•Set joint public hearing for Oct. 14, 2026 at 6:00 p.m.
The Carroll County Board of Supervisors met Sept. 14, 2026, adopted an emergency ordinance to regulate hyper-scale data centers, directed the Planning Commission to consider Comprehensive Plan amendments under Va. Code §15.2-2232, and set a joint public hearing for Oct. 14, 2026 at 6:00 p.m.
Discussion Points
•Board debated scheduling options and member availability.
•Board entered closed session for legal consultation on possible emergency ordinance.
•County counsel advised emergency ordinances remain in effect for 60 days and recommended a hearing date before expiration.
•Motion requested Planning Commission to consider amendments per state code.
Decisions
•Closed session certification approved by roll call.
•Emergency ordinance adopted; joint public hearing scheduled for Oct. 14, 2026 at 6:00 p.m.
•Hearing date/time set; staff ordered to publish notice.
•Referral approved unanimously.
Directions
•Certified the closed session in open session as required by state statute.
•Planning staff to coordinate with Planning Commission on amendment options and hearing materials.
•Set Oct. 14, 2026 at 6:00 p.m. for joint meeting and public hearing.
•Staff and Planning Commission to prepare Comprehensive Plan amendment options and schedule a public hearing.
The Carroll County Board of Supervisors met on Sept. 7, 2026. The board certified a prior closed session, heard public comments about a dam failure and proposed data centers, approved budget and tax items including a school budget amendment and a lodging-tax ordinance, funded school resource officers and two ambulances, and voted to pause work on a countywide zoning ordinance.
Discussion Points
•A board member disclosed a working relationship with the school board and stated ability to participate.
•A board member referenced revised ordinance language in the packet and asked that it be read/approved.