The Washington County Board of Supervisors approved participation in a countywide fire and EMS shared-services program, a Next Generation 911 grant resolution and a 2027 budget reconciliation. Supervisors discussed tax treatment, public-safety funding and county employee compensation.
Discussion Points
•A meeting participant said the grant supported ongoing operations and maintenance after previous grant versions funded data buildout and updates.
•Arendall reviewed EMS, anti-crime, staffing, health, highway, legal, wage and library adjustments, including the sources and amounts described in the article.
•A supervisor asked when Next Generation 911 would be fully implemented across the county.
•A supervisor praised the biennial budget process and said it avoided collecting taxes early for second-year expenditures.
•Supervisor Brightmore said the plan felt like a temporary fix and raised concern about future tax increases.
•Supervisor Conrath raised public questions about whether the program could be separately itemized on tax bills; the treasurer said it could not be separated because the county had not taken the matter to referendum.
•Supervisors questioned the wage adjustment's allocation, peer-county compensation approaches, sales-tax timing and future recruitment and retention analysis.
•Supervisor Stewart supported the program's cooperative and locally controlled structure and said its SMART goals were not enforceable.
Decisions
•Resolution 32 passed unanimously.
•Resolution 33 passed 20-1 after the chair said it required a two-thirds majority.
•Resolution 34 was approved 20-1.
Directions
•Arendall said county staff would begin gathering comparator wage information in January and would examine retention and total compensation.
•Municipalities were told that service agreements should be signed by Dec. 31.
The West Bend Bid Board met on November 11 to hear presentations from The Bend and the Downtown Association, receive a monthly property-owner presentation from Fuzz Martin of Epic Creative, approve the financial report, and debate whether to keep the façade grant winter application window open (the board voted to keep the window open this year).
Discussion Points
•Fuzz Martin moved to reconsider earlier votes and ultimately moved to keep the window open this year.
•Martin described Epic Creative's building history and staff size.
•Martin listed services and client types, emphasizing local projects.
•Noel reported an increase from about 187 events last year to ~320 events this year.
•Noel summarized recent sellouts and the December schedule, including family films and tribute acts.
•Phil requested volunteer recruitment and committed to sending marketing receipts to staff.
•Phil summarized farmer's market success and trick-or-treat attendance.
•Staff argued consolidating to a spring round could produce stronger applications and permit larger awards; some board members worried closing winter would prevent new businesses from applying.
•Staff reported the winter application window opened Nov. 6 and, as of the prior day, had no applications.
Decisions
•Motion passed to keep the winter façade grant application window open for this cycle.
Directions
•Staff will accept applications through the stated deadline and submit marketing receipts to John before month-end.
The Criminal Justice Coordinating Council met to approve a new CJCC website, preview behavioral-health recommendations, and hear a presentation from Judge Kennett about the statewide judicial needs assessment and the prospect of adding a fifth circuit-court judgeship for Washington County; members asked stakeholders to prepare cost/impact information for December.
Discussion Points
•Attorney Stern to circulate documents to council
•Communications subcommittee presented website updates and attachments
•Council needs standardized packet with fiscal and operational impact studies
•County must consider cost of finishing branch five shell and staffing/security implications
•Deadline tied to Office of Court Operations' February window
•Members requested time to read and digest materials
•Office of Court Operations uses three criteria: judicial need, capacity/space and county support
•Stakeholders to include sheriff, DA, public defender, clerk of courts, facilities, finance
•Subcommittee preparing a 14-page overview and two–five proposals
•Suggested temporary governance: bring substantive updates to council until communications plan adopted
•Survey feedback prompted minor spelling and strategic-priority description edits
•Washington County's workload per judicial official is 1.26 (includes judges and court commissioners)
Decisions
•Council to reconvene in December and January and aim for county-board input before February deadline
•No formal resolution at this meeting; council agreed to request stakeholder analyses and to discuss in December/January with a view to county-board action by February
•No immediate vote; item deferred for December review
•Website approved by voice vote
Directions
•Attorney Stern to coordinate materials for December/January meetings
•Attorney Stern to coordinate stakeholder inputs and circulate packet
•Item included on December agenda
•Solicit fiscal/operational analyses from sheriff, DA, public defender, clerk of courts and facilities
•Stakeholders to present cost estimates at December and January meetings
•Subcommittee to circulate any substantive changes to council for approval until communications plan adoption
•Subcommittee to send packet to Attorney Stern for distribution
The City of West Bend BID Board heard seasonal event updates, reviewed its financial report and debated whether to keep the winter facade grant application period open. The board ultimately kept the current application schedule in place for this year.
Discussion Points
•A committee member raised whether businesses arriving later in the year would lose an opportunity if the winter period closed.
•Members discussed contractor availability and the possibility that applicants were already preparing submissions.
•Noel reported about 320 events through year-end, compared with about 187 the prior year, and described the holiday calendar.
•Phil reported recent event attendance and outlined upcoming holiday programming, including the Christkindlmarkt and shopping nights.
•Some line items were considered complete while other expenses and encumbrances remained pending.
•The presenter expected savings from purchases including downtown decorations and snowflakes bought at a sale.
•The presenter said reviewing applications together could help compare project significance and owner contributions; the previous spring had eight applications.
•The presenter said the application period opened Nov. 6, had no applications by the day before the meeting and was due to close Dec. 20.
•The pub crawl had limited success and may require changes if continued.
•The short summary’s donation line contained a typo; the remaining balance was $718 and the long summary was correct.
Decisions
•The board approved a motion to keep the current application schedule in place for this year.
Common Council of the City of West Bend approved the city's balanced 2027 budget, adopted shared-ride taxi service changes and related contracts, finalized several developer and street-rights actions, and approved public-works and parks contracts; committees approved routine minutes and a $111,085.48 accounts receivable write-off at finance.
Discussion Points
•Ambulance invoices comprise majority of write-offs
•Capital projects include airport fuel farm replacement and Regner Park playground replacement
•City attorney and staff reviewed and recommended approval
•Combining two projects to lower bids
•Concerns about plowing and garbage truck access
•Contract cost increases tied to CPI
•Creation of standalone EMS special revenue fund for transparency
•Developer to construct cul-de-sac bulbs and additional right-of-way
•Easement to extend facilities to new development and sales site
•Fare increase for adult rides and 10-pack agency tickets
•Funding sources include property sale, borrowed funds, a grant, and donation
•Funding sources include tree surety fund and carryover grants
•Irrigation plan and one-year warranty
•Number and allocation of trees (residential, street, park)
•Resident participation and strong views at commission meeting
•State debt collection program attempted collections and deemed some accounts uncollectible
•Statutory requirement that parking be parallel unless designated otherwise
•Street segments are platted but unbuilt and the vacation facilitates the Server Products project
•Use of undesignated fund balance to offset insurance and contract increases
Decisions
•Adopted Resolution 27: 2027 budget adoption
•Adopted Resolution 28; accepted right-of-way and approved developer agreement
•Approved both WE Energies easements
•Approved operation and contracts
•Approved winter parking restriction trial on Linden Street
•Approved write-offs
•Permission to bid Contract 26-11 approved
•Permission to bid Contract 27-07 approved
Directions
•Departments to proceed with approved capital projects and procurements as budgeted
•Install markings and signage and monitor trial period
•Proceed with Certified Survey Map (CSM) and record dedications
•Record easement documents after execution
•Staff to finalize and execute 2027 service and lease contracts
•Staff to prepare bid solicitation for spring 2027
•Staff to prepare bid solicitation for spring/early-summer construction
The West Bend Common Council considered the 2027 city budget, transportation and street matters, infrastructure agreements and other city business. Earlier finance and public works committee meetings approved write-offs, a parks donation and several project bids.
Discussion Points
•An alderman said children and others not directly involved may be affected by a recent tragedy and named a county support contact.
•City staff and the city attorney reviewed the utility's proposed agreement and recommended approval.
•City staff planned to perform clearing and restoration work in-house to lower costs.
•Contract costs were expected to increase 3.4%, tied to the statewide CPI adjustment.
•Funding sources include the tree surety fund, operating funds and carryover funds.
•Most ambulance accounts had been referred for additional collection; later recoveries would be recorded as revenue when received.
•Residents will be notified and may decline a tree in their terrace.
•Road projects account for more than $2.7 million, or about two-thirds of the proposed capital budget, with $1.2 million in one-time revenue for future road improvements.
•The 10-ticket packet for subsidized-funding recipients was proposed to increase from $80 to $90.
•The 2026 finance budget included $160,000 for write-offs and year-end audit adjustments related to ambulance billing.
•The $4,357 donation was generated by a pretzel sale and a broil fry.
•The alderman identified Friends Incorporated as a resource for people experiencing domestic violence.
•The archery-range project includes six stalls and paved walkways to the shooting line.
•The city portion of the property tax bill for an average single-family home was estimated to rise by about $151 annually.
•The commission discussed the 8-inch ice requirement and whether the pond was large enough.
•The contract covers 181 trees, including replacements and plantings in developments and parks.
•The developer was to construct cul-de-sac bulbs, and additional right of way would complete the width needed for 18th Avenue reconstruction.
•The parking lot work includes a 43-space lot, entrance realignment, grading and stormwater features.
•The presenter estimated 20 to 25 people attended the Traffic Safety Commission discussion and said residents expressed differing views.
•The presenter said actual cost per ride is higher than the packet price.
•The presenter said residents had used both parallel and angle parking on Linden Street and cited state statute requiring parallel parking unless angle parking is designated.
•The proposed budget was described as balanced and maintaining or improving municipal services.
•The report said the seasonal park installation would be removed before the event.
•The state collection program determined that the repeatedly listed delinquent business property tax balances were uncollectible.
•The street segments were platted but not constructed.
•The street vacation would facilitate a certified survey map and other road dedications.
•We Energies requested additional space to upgrade facilities and provide power to a proposed Verizon sales site.
•Winter parking restrictions were described as a compromise and trial; the city could return with a more permanent proposal if needed.
Decisions
•The Board of Public Works approved seeking bids for the contract.
•The Board of Public Works approved seeking bids; it did not award a contract.
•The council approved Resolution 27 appropriating funds for 2027 city government.
•The council approved Resolution 28, Resolution 29 and the related developer agreement.
•The council approved the 2027 operation and service and lease agreements.
•The council approved the easement.
•The council approved winter parking restrictions on specified portions of Linden Street.
•The Finance Committee approved accepting the donation.
•The Finance Committee approved the $111,085.48 in write-offs.
•The Parks and Recreation Commission approved the event; the Common Council took no separate action.
The Washington County Board of Canvas met Nov. 9 to certify returns from the Nov. 3, 2026 election, noting several local tabulation and absentee issues (rejected absentee for incorrect residence reported to the DA, ballot jams, missed ballots later added, and several voters given incorrect ballot styles).
Discussion Points
•Board discussed scheduling an audit of top races.
•Duplicate poll/badger number issued (317 duplicated) required note.
•Hartford reported seven voters who received incorrect ballot styles; other municipalities reported similar but smaller mismatches.
•How the challenge process was pursued and that the voter admitted nonresidence.
•Machine jam left one ballot not tallied by machine.
•Proposed audit week of Dec. 7; some members unavailable that week and preferred Dec. 15–17.
•Staff read precinct tapes and totals; multiple precinct discrepancies were recorded.
•Staff requested a short minutes entry of 'challenged ballot'.
•Staff to coordinate with parties and confirm the schedule.
•Those ballots were opened and manually added to totals; municipal board certified winners after adding them.
•Two overseas ballots were missed in initial municipal counts because of envelope color.
Decisions
•Audit dates deferred pending staff confirmation.
•Board adjourned after canvass; no formal motion to reopen minutes recorded in transcript.
Directions
•Record a brief 'challenged ballot' note in the minutes.
•Record the errors in the minutes and include documentation for audit.
•Staff to confirm audit dates/room availability and email availability by end of week.
•Staff to email confirmed dates and secure room availability by end of the week.
•Staff to request voter participation log from WAC to reconcile counts.
•Staff will preserve documentation and note corrections for audit.
Plan Commission of West Bend conducted a hearing and approved three items: an exception for an electronic message center (EMC) at 1519 East Washington St. with dimming/animation limits; a 160,000 sq ft Server Products site plan with landscaping buffer to be finalized with staff; and the preliminary plat for the 350‑lot Silver Creek subdivision with conditions and coordination on traffic and soil mitigation.
Discussion Points
•Applicant and public argued modern EMCs can dim and reduce nighttime glare and that using existing sign base avoids extra disturbance.
•Buffer height/planting diversity needed to screen residences; staff requested revised planting and possible berm adjustments.
•Project described as phased; expansion beyond initial footprint could require future reviews depending on zoning and occupancy changes.
•Soil bearing issues require mitigation plans; utilities to be extended from Main Street and existing manhole on Ruscoe Drive.
•Staff recommended denial because EMC would face residential property; commissioners discussed measurement from residentially zoned lot line, nighttime dimming and animation limits.
•TIA shows existing intersection concerns; county warrants and funding may determine future roundabout timing.
Decisions
•Exception approved with conditions; size limited to 24 sq ft.
•Preliminary plat approved subject to conditions.
•Site plan approved with conditions; buffer revisions required.
Directions
•Developer to submit soil mitigation and final grading/stormwater plans; staff to coordinate county road improvement responsibilities and TID involvement.
•Developer to work with staff on revised south buffer; return to commission as required.
•Staff to ensure public improvements and stormwater approvals are secured prior to construction.
•Staff to notify owner of approved conditions and confirm installed sign meets dimming/animation restrictions.
West Bend Plan Commission approved a sign exception for an electronic message center at 1519 E. Washington with conditions, approved a site plan for a new Server Products corporate/industrial building in TID 17 with landscaping buffers to be finalized, and approved a preliminary plat for the 350-lot Silver Creek subdivision.
Discussion Points
•Applicant argued for use of existing masonry base to avoid cost and environmental impacts; noted modern EMCs dim at night up to 20%.
•A soil mitigation plan is required for areas with adverse soil-bearing capacity.
•A traffic impact analysis identified potential county improvements (possible roundabout at P and Rusco); county funding and timing remain to be determined.
•Commissioners discussed future ownership changes (buyer-beware) and whether the city should revise EMC ordinance timing and animation allowances.
•Minutes were presented for approval.
•Preliminary plat proposes 350 lots with RS4 and RD2 zoning and roughly 16 outlots for stormwater/open space.
•Questions raised about vibration, heavy stamping operations and whether expansion would trigger more review.
•Site plan proposes initial 160,000 sq ft building with potential expansion to ≈259,250 sq ft; 196 parking stalls and 8 barrier-free stalls included.
•Staff announced community tree-lighting event scheduled for the next evening.
•Staff recommended approval with conditions; landscape buffer along southern edge must meet code and provide year-round screening.
•Staff recommended denial because EMC would face residentially zoned property; applicant corrected size error to indicate 24 sq ft.
Decisions
•Exception approved with conditions (dimming, static at night, no animations, size limit 24 sq ft).
•Minutes approved; meeting adjourned.
•Preliminary plat approved with listed conditions.
•Site plan approved with condition that revised south buffer be returned for review and that public improvement plans be approved before construction.
Directions
•Developer to submit soil mitigation and final stormwater/grading plans; coordinate with Washington County on off-site improvements.
•Developer to work with staff to revise the south buffer; developer to supply final landscape plan for staff or commission review as directed.
•Staff to file minutes and notify the public of event details.
•Staff to notify applicant of conditions and verify compliance during permitting.
Department Recreation Commission virtual meeting covering a proposed youth snowmobile race, new winter programs and partnerships, donor gifts for Special Olympics and park projects, a quarterly trust report showing $500,000 in impact fees, operations updates and a plan to add AEDs to parks.
Discussion Points
•Buildings winterized and fields shut down; sodding and tree removal completed.
West Bend City Council and Board of Public Works met Oct. 19, 2026. Council approved multiple routine items including awarding an airport parking-lot contract, accepted a $1.2 million state grant for Fire Station No. 1, advanced a code amendment (1st reading), and advanced the 2027 budget and capital plan with a focus on roads; a closed session on an intergovernmental agreement preceded a resolution to join a countywide fire/EMS grant program.
Discussion Points
•Board and council members asked about reference checks and construction timing.
•Council discussed mill-and-overlay vs. reconstruction and project sequencing.
•Council members congratulated staff and moved to approve.
•Council members thanked Chief Noren for his work with the county.
•Council noted broader capital emphasis on roads.
•Fire Rescue special revenue fund created to segregate EMS revenues and expenditures for transparency to contractors.
•Jesse explained intent to use one-time sale revenues for road improvements and highlighted Park Avenue as primary.
•Jesse explained language was redundant and inconsistent with other codes.
•Jesse explained staff-modified template resolves local control concerns.
•Jesse presented the grant and asked council to accept funds.
•Max presented bid results and recommended Black Earth Pavement as low responsive bidder.
•Staff emphasized roads as majority of levy-funded capital; highlighted specific capital projects.
•Taxi fund reliance on levy increased ~95% over three years; proposed fare increases to offset $12,000.
Decisions
•Advance capital budget to public hearing.
•Award contract to Black Earth Pavement with allocation not to exceed $87,000.
•Council signaled consensus to move proposals forward to public hearing.
•First reading approved.
•Resolution 23 approved.
•Resolution 25 approved unanimously.
•Resolution to accept grant approved.
Directions
•Hold separate public hearing for taxi fare changes in early November; include proposals in 2027 budget hearing.
•Staff to appropriate funding and proceed with project planning.
•Staff to continue collaboration with Washington County on program performance measures.
•Staff to finalize contract and coordinate schedule; contractor may perform work in spring if weather requires.
•Staff to incorporate the allocation into the capital plan and prioritize segments based on funding.
•Staff to refine project schedules and funding allocations for the public hearing.
Washington County Executive Committee reviewed and approved the 2027 budget reconciliation, including funding changes to an anti‑crime plan, a new EMS shared‑services levy structure, and adjustments to the library levy; the committee also discussed a proposed new Health & Human Services building and approved applying for a state NG9‑1‑1 grant before moving into closed session on pending litigation.
Discussion Points
•A committee member asked for the spreadsheets behind the numbers.
•Building committee recommended new construction based on 30‑year cost comparisons and space needs.
•Committee praised administration's efforts to limit tax increases.
•County attorney requested closed session to update committee on litigation against SEWRPC and negotiation matters.
•Dahl explained anti‑crime plan revenue revision; committee asked about health insurance burden on employees; members discussed levy splits for EMS.
•Mr. Damcutt explained the noncompetitive grant and new permissive uses for maintenance and existing staff.
•Staff described revenue split for EMS shared services (EMS levy, general levy, sales tax).
•Staff explained contract terms driving the library levy adjustment (circulation reimbursement rates, outreach percentage, automation fees).
•Supervisors asked about legality and assumptions behind using general levy funds for parts of the package.
•Supervisors asked about orthophotography costs and procurement approaches.
•Supervisors moved and seconded the motion to enter closed session.
Decisions
•Approved the 2027 budget reconciliation resolution by voice vote.
•Committee approved applying for the NG9‑1‑1 GIS grant by voice vote.
•Committee approved motion to go into closed session by voice vote.
•Committee recommended proceeding with new construction option to take forward for board consideration.
•EMS funding structure incorporated into approved budget reconciliation.
•Reduce the 2027 library levy estimate by $68,000 as part of the budget reconciliation.
Directions
•Administration to document municipal distribution and volunteer incentive assumptions (Slinger example) and legal rationale for revenue allocation.
•Administration to provide detailed health insurance premium/co‑pay breakdown if requested.
•Building committee may meet between now and December to refine options.
•Proceed to closed session as requested by county attorney.
•Staff to coordinate with Regional Planning Commission or procurement routes for orthophotography.
•Staff to present to the health and human services committee in November and return in December to the county board with borrowing requests if recommended.
•Staff to provide detailed library contract figures and spreadsheets to committee members.
•Staff to submit application and, if awarded, incorporate maintenance into future budgets.
The West Bend Common Council met Oct. 19, 2026, approving a contract for the municipal airport parking lot, passing several code and funding resolutions, accepting a $1.2 million state grant for Fire Station No. 1 site improvements, and advancing the 2027 budget and capital plan (majority funding directed to roads).
Discussion Points
•Contractor offered to hold price and perform paving in spring if weather required.
•Council acknowledged work by Chief Noren and staff in coordinating with the county.
•Council asked about reference checks for the low bidder; staff confirmed references were contacted.
•Council clarified first-reading procedure for code changes.
•Council confirmed direction to use one-time revenues for road improvements.
•Council congratulated staff; no substantive debate.
•Council debated mill-and-overlay vs. reconstruction and scheduling across years.
•Special revenue funds overview including library, communications and new fire rescue fund.
•Staff clarified streets to be prioritized and the conditional language to expand work if funds allow.
•Staff emphasized road-focused capital allocation and listed major projects.
•Staff modified the county-provided resolution template to ensure local control and reasonable performance measures.
•Staff noted the paragraph was redundant and inconsistent.
•Staff presented grant amount and intent to appropriate funding to site improvements.
•Staff recommended award to Black Earth Pavement as apparent low bidder for $82,465 plus contingency.
•Staff to schedule a separate public hearing for fare changes in early November (notice Nov. 9).
•Taxi-service levy support up 95% over three years; proposed fare increases to offset about $12,000.
Decisions
•Accept and appropriate $1,200,000 in state grant funding.
•Adopt Resolution 25 to request participation in the shared services grant program.
•Adopt Resolution No. 23 to appropriate sale proceeds for road projects.
•Approve capital budget to proceed to public hearing.
•Award contract 2606 to Black Earth Pavement; allocation not to exceed $87,000.
•Council gave consensus to move the special-revenue proposals forward to the public hearing draft.
•Ordinance 12 passed first reading unanimously.
Directions
•Hold a distinct public hearing for taxi fare adjustments and post notices per state law.
•Public Works to prioritize Park Avenue (Main to 12th) then other listed streets.
•Public Works to refine project sequencing and report to council before public hearing.
•Staff to continue coordination with Washington County and report back on next steps.
•Staff to finalize contract and execute within allocated funds.
•Staff to incorporate the grant into the capital schedule.
County committee heard a UW Extension needs-assessment briefing, received a Washington County Fair report from the Agricultural Industrial Society, approved USDA wildlife crop prices and a related 2027 pass‑through budget, authorized endowment funding for a Heritage Trails master plan, approved mountain-bike funding and a revised nonresident daily-fee policy for Heritage Trails, and approved parks venue pricing changes. A closed session was announced to discuss an easement negotiation with We Energies.
Discussion Points
•AIS credited renovations, concerts and carnival growth for increased attendance and revenue.
•AIS highlighted the livestock auction and vendor/camping revenue for youth benefit.
•Allocation contingent on updated MOU and attorney review to define allowable uses.
•Budget includes federal breakdown and DNR breakdown; funds described as pass‑through from DNR license fees.
•Chair cited statute to authorize closed session for bargaining/easement negotiations with We Energies relating to a Hartford Jackson interconnect project at the fair park.
•Committee members discussed priorities including aging population, workforce development, 4‑H and roads.
•Endowment committee and potential sponsors have signaled interest in contributing; staff recommended integrating existing trail plans rather than redoing previous work.
•Option 3 keeps voluntary annual rider pass and focuses enforcement on nonresident daily fees to improve compliance.
•Plan phases include current conditions, infrastructure feasibility, site brainstorming, site selection with cost estimates, and implementation phasing; estimated timeline 6–7 months.
•Prices are long averages and can be adjusted; December 1 harvest cutoff recommended to discourage late harvesting for claims.
•Project account contains rider fees plus a $10,000 naming agreement; final booked balance expected ~ $27–28k.
•Some program lines (deer donation processing, permanent fence) flagged as $0 due to lack of processor participation or no new fences planned.
•Staff noted resident share of daily visitors about 14%; many nonresident visitors come from Green Bay, Madison and Milwaukee regions.
•Staff proposed modest increases at less‑booked sites and a larger increase at Glacier Hills, plus package options to enhance per‑booking revenue.
•UW Extension will send a follow‑up email and anonymous Google survey to solicit county input by Oct. 25.
•Venue rentals constitute a major enterprise revenue source; staff proposed a ~12% target increase to reach $475,000.
Decisions
•Committee adopted Option 3 (hybrid approach) with unanimous voice vote.
•Committee approved intent to allocate funds to Metro Mountain Bikers, subject to legal and MOU conditions.
•Committee approved the 2027 budget for the wildlife damage abatement program.
•Committee approved the 2028 pricing schedule unanimously.
•Committee approved the crop prices and retained the December 1 90% harvest date.
•Committee authorized endowment funding and county backfill for the Heritage Trails master plan.
•Committee moved to convene closed session (motion and second recorded).
Directions
•Accept endowment funds and backfill remaining cost from park enterprise budget; staff to develop scope and timeline.
•AIS to present a proposal to its AIS board and then forward recommendations to the county committee.
•Carroll to send the survey to committee members and Washington County leadership; staff to collate responses.
•Implement pricing schedule for 2028 and return with revenue impact analysis.
•Proceed to closed session; county counsel to handle negotiations as appropriate.
•Staff to update MOU and coordinate with county attorney before releasing funds.
•Staff to work with app developer and camera vendor to determine address/plate matching and payment/notice workflows.
Washington County Public Works Committee met October 9, 2026 to receive transit ridership and shared-ride taxi briefings and to review a recommendation to build a new Health & Human Services facility, with timing and borrowing to be decided later this winter.
Discussion Points
•Building committee recommended new construction rather than PAC remodel based on 30‑year comparison and repurposing potential.
•Charlie agreed to provide a graph by rider type and a separate map of origins/destinations and to include live dashboard capability for future meetings.
•Design alternates (structural roof, morgue) may be bid as options; excluding them could save roughly $1,200,000.
•Example cross‑county surcharge cited: adult trip over 20 miles to Ozaukee would be $33.
•Fares are roughly $388,000; a $200,000 gap cannot be closed by modest fare increases alone without risk to ridership.
•Fleet inventory: 30 vehicles made up of minivans, minibuses, transit vans and non‑ADA vans.
•Members discussed raising adult or agency fares while protecting seniors and disabled riders.
•Menu of levers includes fleet size, vehicle type, contracted hours, service days/hours, fare tiers, eligibility verification, agency fares and advertising.
•Minibuses are being phased out; transit vans are the budgeted replacement for flexibility and wheelchair accommodation.
•Ozaukee fare matrix provided as a comparator for policy analysis.
•Projected 2028 funding gap due to depletion of short‑term funds and trust fund reductions.
•Schedule: executive committee review in October; request for $1,000,000 architectural funds in November; county board borrowing in early 2027; occupancy targeted Q1 2029.
•Supervisors asked for rider‑type breakdowns by hour and origin/destination to understand peaks (notably 2 p.m.) and low‑demand windows (notably 8 a.m.).
•Typical peak vehicles on road ~15–17; contracted hours were reduced from 58,000 to 53,000.
Directions
•Building committee to decide on alternates and whether to include morgue as an alternate bid.
•Staff to add an hourly rider‑type chart and an origin/destination graph to next meeting materials.
•Staff to compile neighboring counties' full fare matrices and model revenue/ ridership impacts for modest fare adjustments and agency fare increases.
•Staff to confirm which look‑back period applies to the 10% service‑change threshold with the state compliance manager.
•Staff to model combinations of levers and provide spreadsheets showing revenue, ridership sensitivity and triggers for public hearing requirements.
•Staff to prepare scenario modeling tied to those data for recommended levers.
•Staff to provide clarifying cost breakdowns and refined estimates to executive committee and building committee.
•Staff to provide utilization breakdowns by vehicle type and model cost/dispatching impacts of reducing vehicles or shifting vehicle types.
Washington County Board of Supervisors met Oct. 9, 2026; members approved a countywide shared EMS grant program after extended discussion, voted on several grants and staffing items, heard an extended county executive presentation on an AI initiative, and moved into closed session over ongoing litigation with SEWRPC.
Discussion Points
•Calls for guardrails protecting HIPAA and open records; proposal to draft a human-centered advisory resolution informed by an encyclical were raised.
•Clarified how 1.25 FTE is calculated (two colocated staff delivering 50 hours/week equals 1.25 FTE).
•Debate over pilot nomenclature and long-term funding; staff proposed opioid-settlement support for three years of continued pilot funding.
•Distribution mechanics of sales-tax growth (baseline vs. growth) and the 75/25 split were explained by staff.
•Judge granted a restraining order restoring county membership rights; further proceedings scheduled Oct. 23.
•MIT training and international context for AI competition; data centers and energy needs discussed.
•Proposals for internal pilot programs, super-user groups, and training for staff and residents.
•SMART goals intended to cap growth rather than force absolute cuts; oversight by Public Safety Committee and annual dashboards mentioned.
•Stern said SewerPack had withheld services and removed county transportation projects from regional plans, prompting the suit.
•Volunteer incentive design debated: retirement-style payout vs immediate recruitment incentive.
Decisions
•Board accepted presentation and asked for further proposals; no formal action taken at this meeting.
•Closed session approved; restraining order in place pending further court proceedings.
•Ordinance 5 adopted.
•Resolution 28 approved (18–2).
•Resolution 29 approved; staff proceed with application.
•Resolution 30 approved (18–2).
Directions
•Clerk to publish ordinance changes per standard process.
•Enter closed session for litigation strategy; county attorney to advise next steps after Oct. 23 hearing.
•Initiate listening sessions and partner with technical colleges; staff to return with pilot program proposals and governance language.
•Public Safety Committee to monitor program implementation and dashboards annually.
•Staff to continue pilot, report outcomes and budget implications, and engage West Bend about potential cost-sharing for subsequent years.
•Staff to finalize contract language and present budget allocations in November.
The West Bend Plan Commission on Oct. 6, 2026 considered a proposed land‑use and zoning change for 17.2 acres at Sand Drive and South River Road (rezoning and comprehensive plan amendment), tabled that request after a split vote, approved a conditional‑use permit and site plan for Oil Works to operate a transloading and storage facility at 1095 East Rusco Drive, approved a 24‑unit apartment renovation at 605 River Shores Drive, approved a certified survey map for a Server Products headquarters lot, and set a public hearing to add the downtown master plan and lighting plan to the city comprehensive plan.
•Final council action required for road vacations.
•Operator described containment and single‑car loading protocol.
•Project conforms to MXD zoning; internal parking plan reviewed.
•Staff described a two‑phase operation; Phase 1 truck‑to‑rail; Phase 2 tank storage requiring DNR permitting.
•Staff recommended approval and noted school district traffic/pedestrian concerns; developer would provide traffic study during later subdivision review.
•Staff recommended textual updates to reference the new downtown master plan and supporting documents.
Decisions
•Commission directed staff to schedule the hearing.
•Conditional use permit and site plan approved; tank installation contingent on external permits.
•CSM approved by commission with two conditions.
•Motion to adopt comprehensive plan amendment failed; item tabled at applicant's request.
•Site plan approved by commission.
Directions
•Applicant requested tabling; commission tabled both the comprehensive plan amendment and the zoning amendment.
•Applicant to pursue grant of privilege if balconies are to be constructed.
•Staff to forward vacation items to common council for Nov. 9.
•Staff to schedule public hearing and publish notices; hearing expected in December.
•Staff to verify DNR permit before phase 2; building permits required for tanks.
The Washington County Building Committee recommended forwarding a plan to construct a new Health and Human Services building on the east side of the county campus to the executive committee; members discussed three options (remodel PAC, new building, public-private partnership), reviewed timelines and 30-year cost comparisons, and voted to recommend the new building with one abstention.
Discussion Points
•Architect said remodeling included ~10% contingency but no asbestos-abatement dollars.
•Bidding documents and award timing (April - June 2027).
•Construction start roughly July 2027 and occupancy target early 2029.
•Demolishing PAC could free land for NextGen housing and return tax revenue to multiple taxing authorities.
•Fair Park School land is owned by the school district and deed restricted.
•Fair Park School site may require deed-restriction removal and negotiation with the school district, potentially delaying schedule.
•Phase 2 plans completion target (March 2027).
•Remodeling estimate ~$48M over 30 years; new-build packet number $40M.
•Removing deed restrictions may require court action and add schedule risk.
•Three options compared: remodel PAC, build new HHS building, or pursue public-private partnership (Scott presented 30-year cost windows).
•Utility cost discrepancy noted and corrected in spreadsheet (Advisor Mikulik/Scott).
Decisions
•Committee recommended constructing a new Health and Human Services building on the east side of the county campus; recommendation to be forwarded to the executive committee.
Directions
•Flag deed-restriction and negotiation risk in executive-committee materials.
•Forward recommendation for the new east-side building to the executive committee.
•Include this schedule in materials for executive committee review.
•Refine cost breakout and include asbestos/remediation estimates if discovered; present corrected spreadsheet to executive committee.
•Staff to prepare materials for executive and county board review, including 30-year cost comparisons and borrowing/resolution options.
West Bend Plan Commission held public hearings and took action on a proposed 17.2-acre land-use and zoning change at Sand Drive & South River Road (motion failed and subsequently tabled), approved a conditional use permit and site plan for Oil Works to operate a transloading and storage facility on East Rusco Drive, approved several site plans and a certified survey map, and scheduled a public hearing to update downtown master-plan text.
Discussion Points
•Balconies overhanging the right-of-way require separate Common Council approval (grant of privilege).
•CSM consolidates parcels for headquarters and includes right-of-way dedications and easement releases.
•Engineering found proposed access-restriction modifications acceptable.
•No public opposition was recorded in the staff mailing.
•Operator described double-containment and single-car loading.
•Project conforms to MXD zoning and will reuse existing architectural features.
•School district concerns about pedestrian/traffic on River Road; staff said a traffic-impact analysis would be required at subdivision review.
•Some commissioners questioned changing single-family parcels to duplex/multifamily largely for investment reasons.
•Staff described two-phase operation and noted phase 2 requires DNR permit.
•Staff said the change would allow a small condominium development and recommended approval.
•The proposed change is textual to align references in the comprehensive plan with the 2024 downtown master plan and associated design plans.
Decisions
•CSM approved with two staff conditions.
•CU26009 and SP26021 approved with staff conditions.
•Motion to update the comprehensive plan failed on a 3–3 tie; the applicant requested tabling and both land-use and zoning items were tabled.
•Public hearing scheduled; expected in December.
•Site plan approved with conditions.
Directions
•Applicant to consider tabling and return with additional materials, including traffic-impact analysis.
•Forward related vacation and right-of-way actions to Common Council for final approval.
•Require DNR permit documentation before tank installation and require building-permit submittals.
•Staff to coordinate required studies for subdivision review if application resumes.
•Staff to enforce conditions listed in the memo.
•Staff to pursue grant-of-privilege with Common Council before construction of balconies.
•Staff to schedule and publish notice for a public hearing (30-day notice required).
The City of West Bend BID Board met Oct. 6 and approved a $1,000 allocation for the Downtown West Bend Association to support late-2026 event marketing and heard a request to consider $5,000 in the 2027 budget for ongoing marketing; staff also reviewed year-end budget status, facade grants, tree-lighting plans and long-term restroom options.
Discussion Points
•Award recognition and event turnout
•City owns no land suitable for new public restrooms
•Concept to distribute affordable food from a nonprofit partner
•Costs, maintenance and operating hours must be researched
•Depot restrooms are maintained by the depot organization
•Encumbrances and remaining budget for decorations and events
•Facade-grant extension and upcoming application round
•How BID funds would be tracked and documented
•Piloting a kids' booth at the farmers market
•Scale and timing of investments in downtown properties
•Tree-lighting scheduling and logistics
•Whether $1,000 for the remainder of 2026 could be acted on immediately
•Whether a recurring $5,000 annual commitment would constrict BID budgets
Decisions
•$1,000 allocation for 2026 approved
•Facade-grant extension approved through end of November
•No immediate action; topic added to future work plan
Directions
•Association to document expenditures for the $1,000
•Organizers to proceed with pilots and promotions
•Phil to provide a detailed budget if a 2027 allocation is considered
•Release winter/spring facade-grant round in November; committee review in January
•Research options and costs in 2027; identify funding sources and maintenance plans
•Staff to coordinate tree-lighting installation schedules