2026.11.12 Housing and Community Development Advisory Committee Meeting
The advisory committee heard updates on wildfire recovery, public feedback on the CDBG-DR action plan and upcoming funding processes. Public commenters raised concerns about equitable survivor assistance, program information and access to case management.
Discussion Points
•Commenters supported survivor participation in an advisory group and requested timelines for debris and reimbursement guidance.
•Cooper described the rationale for the proposed Silver Lake-area water and sewer project and the need for evacuation and fire-safety improvements.
•Public commenters questioned the geographic and income distribution of recovery assistance, availability of case managers and clarity of program rules.
•Public commenters requested that survivor recovery precede infrastructure spending and asked for expanded assistance, clearer rules and greater transparency.
•Staff described the application cycle, scoring matrices and technical assistance.
•The chair said staff would consider and respond to comments, but how they would affect the plan was undecided.
•The joint RFP process, estimated funding, scoring pools and proposed review committee were presented.
Decisions
•No funding allocation or program-rule change was made during these public comments.
•The Board of County Commissioners, rather than the advisory committee in this discussion, was identified as the body that would determine final fund allocations.
Directions
•Staff planned a minor amendment incorporating comments, with revisions and a summary to be posted online.
•Staff planned to seek advisory committee representatives for a homeless-services subcommittee and return recommendations to the full advisory committee.
Board of County Commissioners meeting with public comment on data centers and a public hearing and unanimous approval to expand a recycling minimum service area; executive session scheduled under RCW 42.30.110(1)(g).
Discussion Points
•Concerns that utility/developer commitments are not legally enforceable and that residents could incur financial/environmental risks
•Motion to approve consent items 3–7; no substantive discussion recorded.
•Staff clarified county cannot provide garbage hauling and that the City of Spokane owns the waste-to-energy plant
•Staff described expansion rationale, route adjacency and resident petition (65 parcels/40 homes)
•Sunshine Disposal said the expansion can be accommodated without extra trucks
•Whether Avista’s pause on project-specific engineering eliminates future project approvals; Avista allows new applicants and retains existing projects in queue
•Whether developers must disclose full build-out energy and water demands before local approvals
Decisions
•Board accepted staff recommendation to amend recycling service level; motion passed unanimously.
•Consent items 3–7 approved by unanimous voice vote.
Directions
•Fold the neighborhood into the existing route and proceed with April 1, 2027 implementation steps and cart distribution
Spokane County commissioners held a board briefing on Nov. 10, 2026, covering a Broadlink BEAD wireless project, a Sheriff's Office MOU for an evidence phlebotomy program, traffic-code and right-of-way acquisition items (including an Idaho property settlement), transfer-station capacity planning, proposed sewer-rate increases, grant and court staffing requests, recreation fee changes and other routine business.
Discussion Points
•A typical household bill would rise by $0.96 per month; staff will present the increase for final adoption in December.
•Broadlink has completed NEPA for two project areas and will fund engineering, permitting and fiber connections to county IT.
•Broadlink will use county vertical assets (jail mount, towers, water towers) and partner ISPs to extend BEAD-funded service.
•Commissioners requested legal review and technical coordination before placing an interlocal agreement on a future agenda.
•Commissioners suggested clarifying whether the budget allocation would cover a portion of 2027 and including court workload data to support the legislative request.
•County lacks condemnation authority in Idaho; staff must coordinate with Idaho jurisdictions and consider outside counsel if needed.
•Initial proposal due Nov. 20; final application due in early December; prosecutor will convene judges and court staff to develop the application.
•Moderate increases for private facility rentals (approx. 7%) and clarified swim-lesson refund policy.
•New fees: $60 minimum excessive-cleaning fee, $15 RV dump fee for non-registered campers, and 10% per-day food-truck vendor permit.
•North Transfer Station has half the tipping-floor area but takes almost the same tonnage as Valley Transfer Station, causing stacking and inefficiencies.
•Proposed 1.9% increase in sewer service fees to cover CPI and growth.
•Prosecutor described the DOJ Justice Reinvestment grant (36 months, up to $4 million) and suggested project areas including data integration and jail medical cost mitigation.
•Reorganized aquatic fees and three open-swim rental packages.
•Single pit complicates switching between organics and trash requiring floor closures and longer unload times.
•Spokane County requested support for adding a 14th superior court judge and included budget language allocating funds for salary, benefits and operational support.
•Staff proposed seeking an opinion of probable cost to analyze expansion options and funding sources.
•The MOU will provide licensed medical oversight, 24-hour on-call consultation and training for deputies collecting blood evidence.
•The program would supply certified phlebotomists and restore capabilities previously overseen through a city arrangement that ended due to labor issues.
Decisions
•No formal vote in briefing; staff instructed to proceed with settlement paperwork for consent agenda.
•No formal vote recorded; item advanced for further staff work and future agenda placement.
Directions
•Authorize staff support and review by county staff to assemble the application and determine any necessary local match or commitments.
•Bring full fee schedule (Exhibit A) and recommended adoption language to the Dec. 1 legislative meeting.
•County IT to evaluate technical requirements for fiber termination and any operational agreements.
•County staff to work with Broadlink and legal counsel to finalize interlocal agreement and fiber connection terms.
•Place administrative settlement on consent agenda for formal approval and obtain legal guidance regarding Idaho acquisition procedures.
•Prepare an opinion of probable cost and return with funding options (grants, tipping fee adjustments) and implementation plan.
•Schedule the rate change for formal consideration at the December legislative meeting; prepare notices and supporting documentation.
•Staff to refine the letter, consider removing a dollar figure or clarifying partial-year budgeting, and add workload data for legislative outreach.
•Staff to return the MOU with legal review and administration details for final board consideration.
County staff presented an overview of the mental-health sales tax fund and several budget and program proposals for 2027, followed by detailed briefings and debate about two resolutions to amend county indigent-defense code (1.17A) and consolidate Counsel for Defense into the Public Defender's Office; commissioners discussed detention budgeting and a plan to close the Geiger facility.
Discussion Points
•Consolidation aims to reinvest existing budgets, reduce private-counsel overflow, and centralize recruitment/oversight.
•Lease extension to 2/28/28; phased drawdown; asbestos testing and abatement; 58 dorm beds added mid-2027.
•Projected 2027 revenue $17.8M; reserve set at $7M; program requests $1.2\u0002$1.4M; capital asks up to $8M across two pools.
•Proposed clerical and substantive code changes to protect ethical declination while documenting supervisory findings.
Spokane County staff updated the county commissioners on two pending federal BUILD/NHFP grant applications—the Craig Road interchange project (phase one) and the Argonne Road Freight and Safety Project—reviewing costs, match requirements, scheduling and related federal coordination; the board also discussed a request to use a county facility for a memorial and scheduled executive sessions.
Discussion Points
•Announcement of Bud Morrison's death and a request to use the Doris Morrison facility for a memorial service.
•Argonne Road identified as county's only T1 freight corridor with poor pavement condition and high crash rates.
•Board discussed an earmark for the Centennial Trail and uncertainty about federal appropriations timing.
•Board members raised capacity concerns and general support for allowing use if logistics permit.
•Board reviewed items to be discussed in executive session including candidate interviews and potential litigation.
•Chair set the session time and clarified no decisions will be made in executive session.
•Clarification that the $25 million funding limit is per project.
•Commissioners asked for stronger documentation of jobs, community benefits, fire response and Fairchild AFB support.
•Design, right-of-way and construction costs estimated; county needs match funding and right-of-way.
•Grant window timing and the need to satisfy NEPA/ARR conditions before certain agency submissions.
•Staff explained the delay and resubmission process with WSDOT and described phase-one design and costs.
•Staff said earmark clearance through Senator Murray improves prospects but federal appropriations and state routing are required before money is distributed.
Directions
•Advance design to 30% and pursue federal grant opportunities; secure right-of-way and match funding.
•Enter executive sessions as scheduled; reconvene the next morning at 9 a.m.
•No final decision at meeting.
•Prepare BUILD/competitive grant submission ahead of the end-of-February application deadline.
•Return to the board after the first of the year with updates.
•Staff to check facility capacity and report back to the board.
•Staff to pursue conditional ARR/NEPA approvals and prepare applications before the end-of-February window.
•Staff will beef up project sections in the application to include jobs, overburdened communities and fire-response details.
•Staff will monitor federal appropriations and update the board when funds are formally awarded.
Liberty Lake City Council met Nov. 4, 2026 for a regular meeting that included confirmations to advisory boards, a police recruiting-video presentation, a contentious approval of new digital‑forensics software, and an extended budget discussion about recapturing banked property‑tax capacity.
Discussion Points
•Banked capacity total $373,767; options include 1% increase, multi‑year recapture or full recapture in one year; impacts on a $500,000 property illustrated.
•Council requested pro forma that includes public‑safety sales tax projections.
•Need to free evidence custodian to meet accreditation best practices; part‑time clerk would not be benefit‑eligible; some PD costs may be funded by criminal‑justice sales‑tax distributions if measure passes.
•Presentation of recruiting video and brief remarks on recruitment and training.
•Privacy risks of forensic tools and requirement for warrants; technical isolation and CJIS controls; request for written guardrails and policies.
•Reappointments of four individuals to Parks & Arts Commission; youth appointment for Parks & Arts Commission.
•Reason for signage (narrow lanes and plow width); installation schedule; non‑towing initial approach; seasonal (Nov–Apr) placement to avoid summer clutter.
Decisions
•Authorize purchase not to exceed $20,000; staff to supply further safeguards documentation.
•No immediate hiring; request forwarded to budget process.
•No vote taken tonight; direction to staff to prepare materials and potential ordinances for Nov. 17 deadline.
•Proceed with seasonal signage; no towing policy enacted as primary enforcement.
Spokane County officials continued public budget roundtables, presenting an estimated $955 million 2027 budget, reviewing fund-by-fund projections, debt capacity and proposed property-tax-related levies; the board will set levy amounts Nov. 16 and adopt the budget Dec. 7. Public commenters raised concerns about data centers, aquifer protection and budget priorities.
Discussion Points
•directions
•Public commenters asked for independent baseline groundwater studies and a county financial impact analysis for large-load data centers.
•Randy explained levy calculation and distribution of property tax revenue among schools and county funds.
•Randy explained the three potential levies, estimated taxpayer impacts and maximum caps.
•Resident urged county to consider service impacts when making levy and budget choices.
•Staff outlined debt capacity and current outstanding obligations.
•Staff presented fund-by-fund estimates for 2027 including General Fund, special revenue, enterprise and construction funds.
Directions
•Board to set levy amounts at Nov. 16 meeting.
•Commissioners to consider setting these levy amounts Nov. 16.
Spokane County commissioners met Nov. 3, 2026 for a consent-agenda legislative meeting and the third public budget roundtable. Public commenters pressed the board on proposed data-center groundwater and transparency concerns and on treatment of local animal rescues; staff presented a near-final 2027 budget and property-tax options ahead of Nov. 16 levy decisions and a Dec. 7 budget adoption.
Discussion Points
•Commissioners thanked veterans and staff and encouraged public participation in Operation Greenlight.
•Commissioners will set amounts on Nov. 16 and adopt the budget Dec. 7.
•Consent agenda approved without discussion.
•Explained levy calculation, household impact examples, and three new levy options.
•Overview of fund totals, revenue and expenditure estimates, and capital projects.
•Proclamation read and passed unanimously.
•Residents asked for enforceable baseline groundwater studies and independent technical review.
•Speakers requested a rescue designation distinct from commercial kennel licensing.
•Speakers requested public disclosure of full build‑out electricity and water demands.
•Staff emphasized that the budget is not final until adoption on Dec. 7.
•Volunteers described capacity constraints and loss of volunteer staff at shelters.
Spokane County commissioners met Nov. 3, 2026, to review the Spokane Airport 2027 budget and capital plan, finalize a county legislative agenda for the 2027 session, consider transportation and capital requests, review a proposed countywide software replacement for property-tax systems, set a public hearing on Newman Lake Flood Control assessments, and hear updates on an animal-rescue licensing dispute.
Discussion Points
•Airport presented 2027 operating and capital budgets; staff emphasized FAA grant assurances and user‑funding requirements.
•Animal‑control and planning staff are drafting Title 5 amendments to create a rescue‑kennel licensing option with potential fee waivers while preserving land‑use review.
•Commissioners expressed concern about messaging to legislature if corridor appears duplicative of existing North–South Corridor funding.
•Commissioners requested monthly reporting on revenue impacts of the city parking tax and asked that the airport budget be placed on next week’s consent agenda.
•First‑two‑year implementation cost negotiated down from prior estimate; ongoing annual support will be higher than current spend.
•Glen Rose described as Southeast connector; staff to provide branding and phasing.
•Legacy system (ProVal/Ascend) is end‑of‑life and poses security and operational risks.
•Multiple complaints and citations documented at the Rescue For All property; lack of kennel licensing due to zoning/conditional‑use permitting issues.
•Public defense funding target of $15M/year affirmed as priority.
•Staff to investigate whether CCA dollars or other state funds could offset local mandates such as clean‑buildings compliance.
•Transportation Glen Rose ask to be word‑smith and clarified to avoid duplication with existing corridor funding.
•Vendor work is projected to replace most ancillary systems and move hosting to cloud.
Decisions
•Board accepted staff request to place the budget on next week's legislative consent agenda (staff requested; formal placement to occur via consent agenda process).
•Board agreed to advance the procurement for placement on next week's consent agenda (staff request).
•Board authorized staff to continue developing the Glen Rose messaging and potential $24M ask for legislative outreach.
•Board directed staff to continue enforcement consistent with code and to bring draft code language and proposed public guidance to counsel for review.
•Board directed staff to revise the draft agenda with changes discussed and bring it back for finalization.
Directions
•Place airport 2027 budget on next week's legislative consent agenda if final edits are made.
•Provide regular project updates to the board during implementation.
•Refine legislative language and prioritize items for meetings with legislators and the governor’s office.
•Staff to check and update public guidance (website, signage, social media) and return with monthly parking‑tax revenue figures.
•Staff to finalize Title 5 draft revisions and route to county counsel for review; legal to review any proposed public statement before release.
•Staff to place contract on next week’s consent agenda and provide a more detailed implementation timeline and risk register.
•Staff to refine the project's description and cost‑phasing and return with a recommended funding ask (full vs. phased).
•Staff to research CCA allocations and report back.
The City of Liberty Lake Parks & Arts Commission met Nov. 2, 2026, and approved a ticket-booth art concept using historical community figures, recommended Melissa Cole as the commissioned artist for the new City Hall lobby, and allocated remaining event funds to the Home for the Holidays program. Staff gave updates on park projects, upcoming holiday events and a Rainbow Bridge redesign moving to council review.
Discussion Points
•Artist will coordinate with a local historian to identify historical figures for the ticket booth artwork.
•Commissioners agreed no formal agreement was necessary given the invoice amount; staff will handle procurement.
•Council had several questions about the design and signage language that staff are addressing.
•Design had grown in planting and scope, raising maintenance concerns including browsing by elk and deer.
•Light Up Liberty Lake scheduled for Nov. 21; Cocoa and Carriage registration filled rapidly.
•Maintenance line started at $10,000; roughly $5,000 spent on skate-park work.
•Melissa Cole was chosen for a four-part lobby piece incorporating mosaic glass and textured panels.
•Orchard Park benches are ordered and should arrive within two weeks.
•Programming budget has about $3,000 remaining; staff proposed using both for holiday lighting and event support.
•Selection committee advanced four finalists and awarded each a $1,000 stipend to develop designs.
•Three quotes received for shop installation; staff awaiting council approval to proceed.
Decisions
•Commission approved allocation of remaining maintenance and programming funds to Home for the Holidays events.
•Commission recommended approval of the ticket booth art concept and will send materials to council.
•Commission recommended Melissa Cole; vote to forward recommendation passed unanimously.
•No formal decision; consensus to review revised design and scale back heavy plantings.
•Status updates; no formal votes beyond prior allocations and recommendations.
Directions
•Staff to contact carriage vendor and arrange purchases for safety/lighting from remaining funds.
•Staff to forward recommendation and draft artist agreement to city council.
•Staff to prepare an artist agreement and forward to council.
•Staff to proceed with procurement upon council approval and follow up on vendor confirmations for events.
•Staff to wait for landscape architect's revised plan and present it to commission before returning to council.
Budget staff and county commissioners discussed proposed adjustments to department budgets, including district court reductions, juvenile services funding shifts, sheriff staffing and unfunded positions, IT and planning requests, contingency for fires and legal costs, and whether to consolidate counsel for defense with public defenders. An executive session on pending litigation was scheduled at the end of the briefing.
Discussion Points
•$119,000 requested for a Lumify cybersecurity operations center subscription.
•Adjusted sheriff request: $11,282,358 after corrections.
•Capacity constraints cause many contracted cases; legal conflicts may still require separate counsel.
•District court submitted budget $389,000 over target; staff reduced it to target.
•HCA could fund nurse manager through mid‑2028.
•If HCA funding ends the position returns to general fund and needs a future discussion.
•One vacant pretrial officer is grant funded (MacArthur project).
•Pretrial ask: $96,836 to stay fully funded.
•Remaining ~$80,000 gap could come from vacancies or future amendment.
•Sheriff prefers to keep ~10 unfunded positions for operational flexibility and civil-service hiring pipeline.
•Some costs offset by mental-health sales tax.
•Sysadmin position request: general fund pays ~63% (~$72,000).
•Whether to merge counsel for defense with public defenders or outsource to private bar.
Directions
•Invite sheriff leadership to present next week with corrected numbers and plan to manage a $1M reduction if needed.
•Monitor district court spend rate and invite court leadership back for detailed presentation if commissioners request.
•Restore cybersecurity funding and include itemized costs in shared folder for review.
•Staff to double-check grant funding status and spend rates.
•Staff to provide data on conflict rates, case durations and cost per case and return for further discussion.
•Track HCA funding and vacancy savings; return with options if needed.
Board briefing on Nov. 2, 2026 covered parks capital requests (waterslide resurfacing, Holmberg pool demo), a $251,000 vehicle/equipment replacement request, REIT fund balances and CIP priorities, courtroom and detention budgets including planning for Geiger closure, and a scheduled executive session on complex-fire after-action review.
Discussion Points
•Chase recommended immediate waterslide resurfacing and demolition of Holmberg pool as a nuisance abatement.
•Concerns about funding vacant positions versus funding contingent judge appointment.
•Detention services presented a $7.4M estimate to sustain operations with Geiger open.
•Need for a wind-down timeline and an attrition/reassignment plan to avoid abrupt layoffs.
•Parks staff presented a short, prioritized capital list focused on safety and maintenance.
•REIT 1 & 2 balances, legislative changes allowing expanded use, and projected new annual capacity of ~$2.4M after debt service.
•Request of $251,000 to replace five prioritized pieces of equipment.
•Staff recommended conservative use of REIT and possible use of general fund for one-time projects this year.
•Staff recommended one-time general fund funding this year; commissioners discussed using REIT for capital in future years.
•Whether to fund Superior Court’s operating requests directly or hold funds centrally to cover a potential 14th judge.
Decisions
•Tentative agreement by multiple commissioners to hold $225,000 in non-departmental contingency for possible midyear judicial appointment.
Directions
•Staff to place contingency funds in non-departmental accounts and return with precise budget language.
•Staff to prepare timeline and detailed cost projections (mid-November) and present them before budget adoption.
•Staff to return with cost breakdowns, scheduling details, and potential reuse options for Holmberg site.
•Staff to return with mileage and maintenance cost data for high‑use vehicles to inform future decisions.
•Staff to update REIT estimates after October collections and publish a decision matrix later in the week.
2026.10 October Spokane County Spotlight | State of the County
Greater Spokane Incorporated hosted the 2026 State of the County, featuring remarks from Spokane County Chair Mary Brooks (her final State of the County), Sheriff John Knowles on public safety trends and budget pressures, and presentations on behavioral-health investments, economic development, and nonprofit resilience.
Discussion Points
•Crime rates: robberies down 43%, assaults down 14%, burglaries down 16%; vehicle thefts up 52%
•Facility appraisal and funding; county ARP contribution; regional service reach.
•Mercer Mass Timber expansion support; Broadlink broadband investments; airport Concourse C expansion and passenger forecasts; new-construction totals and job growth.
•Metaphor of doors and keys; Canopy's role in financial inclusion.
•PATH crisis center funding and scope; STARS outreach numbers; HOPE school-based supports; co-responder model; task-force recommendations.
•Resilience framing; wildfire recovery; investments in behavioral health, training, broadband, parks and airport expansion
Directions
•Board will consider timing for putting a measure to voters to support task-force recommendations
•County will continue to expand programs and consider voter measures when appropriate
•Groundbreaking scheduled next week (per remarks).
•Public asked to support difficult budget decisions; no formal directive recorded at event
Monthly update from a Spokane County commissioner covering an election reminder, an extended pause on data center development through June 1, 2027, details on a roughly $23 million budget shortfall and possible layoffs, opposition by some commissioners to a proposed 0.1% sales tax, and recent community engagement.
Discussion Points
•County Planning Department published responses to public comments and new policy considerations.
•Election reminder and ballot drop-box guidance.
•Extension intended to allow time to develop land-use regulations before permitting new data centers.
•Past cuts included eliminating 91 full-time positions and delaying capital projects.
•Projected $23,000,000 budget shortfall for next year.
•Speaker's recent election to a national board and community outreach activities.
Decisions
•Board unanimously extended pause on new data center development through 06/01/2027.
•The speaker reported joining two colleagues in voting to oppose the proposed 0.1% sales tax.
Directions
•Continue cost reductions and efficiency improvements during the 2027 budget process.
•Staff to continue gathering input and study regulatory options.
Liberty Lake held a special city council workshop on Oct. 27, 2026 to review the 2027 budget process, proposed program and fee changes, and draft legislative priorities. Staff and consultant Capital Path briefed council on state budget pressures, potential revenue tools, and local project priorities; council discussed a proposed 1% property tax revenue increase and software/fee items.
Discussion Points
•Capital Path presented state fiscal context, identified potential bills and recommended local project prioritization and legislative outreach.
•Council asked for a prioritized project list and scheduled in‑person legislative engagement.
•Explained fund types and program inventory use for priority budgeting.
•Reviewed calendar and incremental budgeting approach.
Decisions
•Council agreed to ask staff and the consultant to return with a prioritized list of capital projects for legislative outreach.
Directions
•Staff to circulate program inventory sorted by alignment score and a consolidated software list before the next workshop.
•Staff to coordinate with Capital Path to prepare legislative-day materials and set dates for meetings in Olympia.
2026.10.21 Commissioner French Comments on Data Center Pause
A Spokane County commissioner defended his record against accusations and urged an extension of a proposed data-center zoning ordinance to allow time to craft mitigation rules, citing water-supply and economic-impact data and describing a separate hydrogen project proposal.
Discussion Points
•Addition of a data-center concept changed the project's public reception and feasibility.
•Apricus initially proposed hydrogen production powered by a 2,000-acre solar array using reclaimed water.
•Commissioner denied accusations and defended public-records disclosures.
•Commissioner framed fiscal benefits as partial solution to budget shortfall, but said environmental/quality-of-life tradeoffs matter.
•County cannot ban data centers permanently; state authority prevails.
•Department of Ecology graphic cited showing aquifer outflow and low river flows.
•Developer projection of $7.1M to county general fund and larger property-tax benefits for local districts.
•Extension to June recommended to allow for mitigation and to track state action.
•Reclaimed water option for a proposed hydrogen project is no longer available for that developer.
•Staff confirmed calendar entries are disclosable public records.
Decisions
•Extension to June (speaker described it as in place; no roll-call vote in transcript).
•Extension until June recorded by commissioner; transcript lacks formal roll-call within provided segments.
Directions
•Extend ordinance timeline until June to allow additional study and rulemaking.
•Staff to draft mitigation rules and align with potential state legislation.
Spokane County held the first of three public round tables on the 2027 budget focused on general fund revenues, revenue-option scenarios and public comments raising concerns about potential layoffs and prior ARP spending.
Discussion Points
•1% property-tax option (~$680,000)
•Breakdown of major revenue buckets: sales tax, property tax, charges for services.
•Calendar for next roundtables and decision dates announced.
•Commenters questioned ARP spending on flood mitigation and alleged missing capital-facilities planning tied to the comprehensive plan (GMA).
•Comments raised long-term concerns about data centers and local property values.
•Consideration of new public-health levy and criminal-justice sales tax
•Presentation of 2027 revenue estimates and a 2024 ARP-related anomaly.
•Public commenters urged service preservation and tax options rather than layoffs.
•Separate veterans assistance levy and MH/DD levy as revenue sources
•Staff outlined revenue options and next meeting dates.
•Unions presented projected layoff ranges (160–230 FTEs) and warned of service impacts.
•Unions requested the county exhaust alternatives to layoffs (vacancies, voluntary retirements, delaying projects).
Directions
•Bring revised revenue estimates to commissioners later in the budget cycle as new monthly sales-tax data arrive.
•Roundtable two to cover expenditures Oct. 20 at 5:30 p.m.
•Staff to bring revised revenue estimates as more sales-tax data arrive and to present options for commissioners' consideration before Nov. 16 property-tax decisions.
Spokane County commissioners held a 9 a.m. briefing on Oct. 27, 2026, covering an Operation Greenlight proclamation request, multiple surplus-property proposals and easements, the county's six-year Transportation Improvement Program and culvert inventory, wastewater capital planning and a contract/permit discussion, several grant acceptances and applications, park grant proposals and staffing changes, signage and building-branding details for a new facility, and a scheduled executive session on litigation and labor negotiations.
Discussion Points
•Adjacent owners favor a formal vacation to clear records.
•Branding policy constraints discourage a "bounded" circle logo; recommended approach is silhouette cutout.
•Bridge contains lead paint and will require remediation disclosures.
•Byrne JAG MOUs will appear on consent agenda splitting funds with the city.
•Construction progress: roofing and framing, winterization, and estimated construction completion timeline (approx. June next year).
•Contract operator Jacobs currently performs operations; county lacks operational staffing for advanced treatment plants.
•County counsel advised state statute covers many elements; a county resolution could be more restrictive but is not required.
•Culvert inventory is under development to prioritize proactive replacements.
•Department of Ecology permit renewal expected in 2027; county submitted renewal application.
•DOH review and funding coverage (Medicaid expected to cover a portion; non-Medicaid gap uncertain).
•Draft TIP includes 235 projects and $235M; near-term years are likely funded while out-years are placeholders.
•DSHS grant level remained the same as the prior year; county reorganizations will support grant obligations.
•Launch Northwest mentoring grant will provide an employee and program outcomes reporting.
•Multiple parcels proposed for surplus and sale (pit parcel, Rambo remainders, Thurman house, steel bridge).
•Near-term capital spending estimated at $7M-$11M for collection system improvements.
•Nichols said the county will be featured in a national Operation Greenlight campaign and needs a proclamation.
•Proposal to hire two seasonal E&E staff and acquire a vehicle; plan to create a five-month commissioned park-ranger position.
•RCO no-trails grant ask $200,000 (no match); E&E ask $233,124 with in-kind match.
•Staff emphasized the challenge of filling permanent ranger roles since a long-term ranger retired.
•Staff says the right-of-way was vacated by operation of state law.
•Staff will help supply green lights and coordinate lighting of county buildings and porches.
•Whether a local resolution banning NDAs is necessary given state law.
Decisions
•Executive sessions scheduled and board reconvening time set; no policy action taken at briefing.
Directions
•Bring a resolution Nov. 3 to support grant submissions and local match/in-kind support.
•Continue culvert inventory and prioritize permitting for replacements.
•County counsel to provide public-facing explanation of memo and options; board to consider educational outreach.
•Executive sessions scheduled for litigation and labor matters as announced.
•Project staff to continue milestone updates and track DOH approval and staffing timelines.
•Staff to place MOUs/acceptance items on the consent agenda and prepare contract language and reporting elements.
•Staff to place proclamation on a future agenda and coordinate logistics (notify operations staff Gil).
•Staff to place surplus items on the consent agenda and pursue appraisals and sale steps.
•Staff to return with options on Jacobs contract and staffing/cost implications ahead of 2031 decision point.
•Staff to revise signage design to silhouette cutout and return with material choice and mounting details.
•Staff to schedule public hearing and return TIP for formal adoption.
•Staff to verify road-log treatment and return with item for consent/public hearing.
Spokane County Board of County Commissioners met Oct. 27, 2026. The board heard public comment on data centers and local development, approved several road vacations, denied a petition to establish Craft Lane as a public road, and unanimously adopted county ordinances targeting fentanyl endangerment and prohibiting virtual-currency kiosks in unincorporated Spokane County.
Discussion Points
•Board moved and passed vacation
•Commenters urged treatment focus and caution about impacts on parents
•Commissioners asked about road standards and connectivity
•Concerns about rezoning parcels to heavy industrial use
•Consider refining criteria for public benefit in upcoming road-standards update
•County limited by state law to misdemeanor-level ordinances for unincorporated areas
•Craft Lane serves 20 lots but dead ends; little public benefit
•Engineer described redlined parcel and ownership
•Maintaining additional miles of road strains county budget
•No public testimony presented
•Ordinance targets kiosks as nuisances rather than banning cryptocurrency
•Owner: preserve family land since 1944
•Prosecutor cited increases in child near-deaths and overdose fatalities
•Prosecutor described how kiosks facilitate scams and presented FBI loss statistics
•Public commenters supported removal; others raised traceability and legitimate-use concerns
•Public support for pause on new data-center permits
•Requests to post slide deck and draft ordinance for public review
•Surveyor: 53 underlying lots exist; vacation prevents development
Decisions
•Adopt fentanyl endangerment ordinance for unincorporated Spokane County
•Adopt nuisance ordinance to remove virtual-currency kiosks in unincorporated Spokane County
•Pause extended through June 2027 (previous action referenced by commenters)
•Petition for Craft Lane denied
•Vacate Brooks Road right-of-way approved
•Vacate Orchard Avenue and Haver Mill Street approved
Directions
•Prosecutor and law enforcement to use ordinance as an investigatory and charging tool; track incidents
•Staff to bring road-standards update consideration to future meeting
•Staff to include this discussion in upcoming road-standards update
•Use nuisance-abatement process with notice periods; coordinate with law enforcement and victim services
Continuation budget briefing on Oct. 26 focused on public defense funding, staffing shortages, conflict-counsel costs and 2027 budget requests from Spokane County public defense offices.
Discussion Points
•Bloomhorst argued consolidation risks conflicts-of-interest and constitutional violations;
•Board scheduled a 10-minute executive session to review a candidate.
•Case law shows system failures can trigger constitutional violations.
•Chair stated no decisions would be made during the session.
•Charbonneau presented staffing and cost data supporting separate conflict offices.
•Conflict-panel assignments have increased; only a small number of private attorneys take Class A cases.
•Ethical constraints limit representing codefendants in one office;
•Investigator and expert costs are rising due to technical evidence demands.
•Presenters explained the operational effects of recent resignations and leaves.
•Presenters requested $560,000 to maintain current staff levels and fund specific attorney positions and support staff.
Decisions
•No public action recorded.
Directions
•Board to consider ethics and case law in any delivery-model changes.
•Presenters to provide specific counts of conflicted cases and more detailed cost breakdowns.
•Presenters to supply detailed counts of conflicted cases and a refined cost comparison.
•Specified attendees were Jeff, Matt and Wong per the record.
•Staff to supply historical comparison numbers and more detailed conflict counts.