Lansing Planning Commission Meeting on November 18, 2026
The Planning Commission recommended approval of a rezoning request, considered a site plan with outstanding conditions, and tabled proposed residential-structure code amendments for further study. Staff was also preparing draft chapters of the comprehensive plan.
Discussion Points
•Members differed on whether agricultural buildings should be permitted to reach two-and-a-half or three stories and discussed building placement on large parcels.
•Members discussed allowing agricultural-style metal panels in agricultural and residential districts, while raising concerns about neighborhood context and residential property proximity.
•Members discussed extending the deadline, including 180 days; the final amended deadline is not clear.
•Staff described the sign as the outstanding site-plan issue and discussed the 90-day completion condition in light of asphalt installation conditions.
•Staff presented options for agricultural and residential accessory-building heights, siding and residential design standards.
•Staff said the 120-square-foot provision had effectively been removed from the draft.
•Staff said the Artesian Rural Enterprise reference would be removed from any ordinance draft sent to the City Council.
•Staff said the proposed I-1 zoning would align the parcels with surrounding properties.
•The applicant said the illustrative material was not a development plan and no infrastructure changes were proposed.
•The applicant said the sign would be moved 9 feet to meet the 15-foot setback and trees would be planted.
Decisions
•The commission tabled case ZNTXT-26-003 until the January meeting; no final text amendment was adopted.
•The Planning Commission recommended approval to the City Council.
Directions
•Staff said a final site plan showing the sign relocation should be filed.
•Staff was to prepare a revised draft for a December work session and January meeting.
The Leavenworth County meeting covered Project Bluestem data-center concerns, animal-control resolutions, a proposed Donahue Road right-of-way vacation, and other county business. The commission voted down two requests to expand a consultant’s study, tabled an animal-resolution proposal for revision, and rejected the road vacation.
Discussion Points
•A commissioner questioned whether emergency-service estimates in the Stifel report were based on objective analysis.
•A county official said fire districts and other agencies could identify relevant costs and that some matters could be addressed through a development agreement.
•A county official said some environmental analysis depends on unresolved project details, including generation source and capacity.
•A county official said state law supersedes county resolutions and described the proposal as part of an effort to modernize older animal-control resolutions.
•A county official said the county did not control state incentives and that reclamation terms would be addressed in a future development agreement if the project proceeded.
•Another commissioner said the letter explicitly supported restrictions on late-term and partial-birth abortion and was not limited to the stated concern about minors.
•Commissioners debated whether a Stifel analysis should include foregone taxes from Senate Bill 98 and comparisons of projected and realized public revenue.
•Commissioners discussed a narrower approach focused on specific practices.
•One commissioner said the lobbying request concerned parental involvement and possible trafficking of minors, not an abortion ban.
•Public commenters raised concerns about possible air-quality, noise and health effects and the proximity of schools.
•Public commenters separately raised concerns about volunteer firefighter protection and emergency planning.
•Renan and other commenters said the broader draft contained legal and practical problems; Blackdeer raised questions about statutory authority, the word “knowingly” and animal-control resources.
•Staff said four of five affected property owners had submitted support letters and described potential effects on future road development and adjoining property access.
•The applicant’s representative said vacating the right-of-way would allow a private road to sit farther from an existing house and said road improvements were not feasible for the proposed additional houses.
•The chair said the wording did not reflect the chair’s intended position and expressed concern about government overreach.
Decisions
•No vote to amend or withdraw the lobbying letter was recorded.
•The broader issue was tabled; no final animal-control resolution was adopted.
•The commission rejected the motion to expand the report’s scope to assess Senate Bill 98’s foregone-tax impact by a 3-2 vote.
•The motion for additional objective cost analysis failed; the transcript does not establish the vote tally.
•The motion to approve the right-of-way vacation failed 3-2.
Directions
•Officials discussed possible outreach to fire departments and emergency-service providers.
•The commission discussed obtaining legal advice about the timing and scope of studies.
•The modified resolution was to return for consideration the following week after county counsel review.
The Leavenworth County Planning Commission considered subdivision and rezoning applications and held a public hearing on proposed data-center regulations. It recommended several land-use actions to the Board of County Commissioners and postponed its recommendation on the regulations until Nov. 19 for staff and legal review.
Discussion Points
•A committee member questioned the need for an exception given the available width, depth and frontage.
•A staff member said K.S.A. 12-757(b) requires a written record but not a verbatim transcript.
•Charles Englehart asserted that sewer construction would cost more than $22 million and described prior disputes, damage and threats.
•Deja Gleishauer argued that on-site generation could create air-pollution risks and that land-use siting decisions are distinct from air permits.
•Kathy Peters and a planning official described the draft’s restored nuclear prohibition and the governing body’s role in directing it.
•Kathy Peters recommended retaining an average while adding controls for repeated or sustained noise deviations.
•Kathy Peters said the draft required a decommissioning agreement for large-scale data centers and allowed the county to require one for smaller categories, with a county-approved plan and financial security.
•Kim Colvert argued that the draft’s nuclear language and power-plant review provisions were inadequate.
•No noise amendment was separately adopted or voted on.
•Russ Dent and Richard Paz urged fixed cleanup standards, deadlines, independent cost estimates and stronger financial security in the regulation.
•Staff said access from Golden Road caused the lot to exceed the one-to-one ratio, while primary access from 238th Street would comply.
•Staff said KDOT indicated access was likely limited to existing points.
•Staff said lot access permits are separate from plat approval and would require an application if one is not already in place.
•Staff said lots 1 and 4 exceeded the permitted lot-depth-to-width ratio.
•Staff said public water and sewer were not available at the property and that the nearest service was more than a half-mile away.
•Staff said the applicants wanted to combine two lots for building purposes and vacate utilities along the shared line.
•Staff said the combined lot was wider than it was deep and required an exception.
•Staff said the consent agenda contained four items and that passage would approve them.
•Staff said the proposal was outside the 660-foot sanitary-sewer threshold; a planning official explained the future land-use designation and current zoning context.
•Staff said the request and testimony were preserved in the permanent record.
•Tammy Patton and Dee Carlskind proposed firm day and night limits and additional measurement and monitoring requirements.
•The applicant confirmed understanding of the access constraint and said the concept plan had explored alternatives.
•The applicant’s representative said the existing layout made compliance impractical and estimated an approximately 88-foot shortfall.
•The commission did not vote on the proposed amendments.
•The dissenting member said the plat did not conform with the future land-use plan.
•The proposal included 23 lots, two-and-a-half-acre lots and an interior road connecting to undeveloped land.
Decisions
•The commission approved the exception 5-0 and recommended plat approval 5-0.
•The commission approved the exception 5-0 and recommended the plat 5-0.
•The commission approved the exception by a recorded 5-0 vote.
•The commission recommended the preliminary plat 4-1.
•The commission tabled its overall vote on the proposed regulations until Nov. 19 at 6 p.m.
•The commission tabled its overall vote on the regulations until Nov. 19 at 6 p.m.
•The commission tabled its vote on the overall regulation until Nov. 19 at 6 p.m.
•The commission voted 5-0 to recommend the rezoning request to the Board of County Commissioners.
•The commission voted to leave the August minutes as written with the request attached and approved staff amendments to the October minutes.
•The consent agenda was approved by a recorded 5-0 vote.
•The lot-dimension exception passed 5-0.
Directions
•Planning staff and legal counsel were asked to review public input and return with recommended language.
•Staff and legal counsel were asked to review the public input and return with recommended language.
The Leavenworth County Planning Commission heard multiple subdivision plats and a lengthy public hearing on proposed zoning language for planned industrial-technical districts (PITD) and data centers; commissioners tabled the PITD language amendments for further legal review and scheduled a continuation for Nov. 19 at 6 p.m.
Discussion Points
•Access and frontage will be along 230th Street for replat DEV-26-141; any driveway requires an entrance permit.
•Decommissioning, financial security and enforcement mechanisms needed to protect taxpayers and the environment.
Leavenworth County Board of County Commissioners canvassed the 2026 general election, addressed a Linwood precinct ballot shortage, accepted provisional ballots for counting, heard community comment and a Stiefel financial-impact presentation on Project Bluestem, and approved a $50,000 Local Environmental Protection Program grant.
Discussion Points
•Advantage Printer produced replacement ballots; ADA express-vote machine used but slow.
•Board accepted $50,000 LEPP grant and authorized execution by the planning and zoning director.
•Board voted to run accepted provisional ballots and to certify the election after completion of the count and signatures.
•Clerk will run accepted provisional ballots and provide updated report.
•County would seek to participate in LEPP annually to serve eligible residents.
•Grant of $50,000 awarded earlier in 2026; targeted uses include repair/replacement of failing septic tanks and well testing for low-income households.
•Key figures: ~$57.9M stabilized receipts pre-adjustment; ~$48.5M net annual local impact (unincorporated) after school-aid and recurring costs; >$105M in annexation scenario.
•Public called for independent review and access to Stiefel inputs and models.
•Speakers argued that tax projections omit costs such as displaced school aid, water/sewer impacts, noise and emergency service burdens.
•Study focuses on local tax impacts and excludes state incentives and environmental/health issues.
•Suggestions included funding an advisory vote from developer funds and considering moratoria or zoning changes.
•Transposed ballot order between House 41 and House 38 created shortage at Linwood precinct.
•Upfront developer payments proposed: ~$22.4M for roads + ~$14.4M for water/sewer/fire (approx. $36.8M total).
Decisions
•Board approved acceptance and execution authority for the LEPP grant.
•Board voted to accept and count 242 provisional ballots as recommended by the clerk.
•Certification, grant acceptance and provisional ballot-count motions passed.
•No land-use decision was made during this meeting; the board received public comment and the consultant’s report.
•No land-use or development agreement decision taken; informational presentation and Q&A only.
Directions
•Authorize director of planning and zoning to sign the subrecipient agreement and begin project implementation.
•Board and staff to consider separate environmental/health studies and to negotiate development-agreement protections if project proceeds.
•Clerk to run accepted provisional ballots and return results to the board.
•Clerk to run provisional ballots and return results; planning and zoning to execute grant subrecipient agreement.
•Commissioners to pursue development-agreement language to require developer payments and protections against valuation shortfalls; staff to continue due-diligence with utilities and first-responder agencies.
•Election office to implement double and triple checks on ballot orders and packing.
Leavenworth County commissioners canvassed the 2026 general election, addressed a ballot shortage in Linwood that briefly delayed voting, accepted a $50,000 Local Environmental Protection Program grant, heard extensive public comment opposing a proposed hyperscale data center (Project Bluestem), proclaimed Veterans Day, and handled routine consent and appointment business.
Discussion Points
•Adoption of Veterans Day proclamation and public recognition of veterans.
•Cause and remedy for Linwood ballot shortage; whether ballots were tracked and logged; use of local printer to expedite replacements; assurance of future double/triple checks.
•Examples cited: Ottawa (25 MW ban), Emporia and El Dorado (10-year bans/moratoria); speakers asked for size- or impact-based limits.
•Purpose of grant: repair/replace failing septic tanks and well testing; target households at 133% of national poverty level.
•Report omitted certain cost categories (displaced school aid, public services) and did not independently verify developer-provided data.
•Request to consider any advisory vote or moratorium until analysis is complete.
•Selection of KAC delegate and alternate; coordination on legislative priorities including property tax cap and LAVTR restoration.
•Speakers argued moratoria are not bans of all data centers but allow time for protections and review.
•Speakers asked for Stiefel's model and underlying data to be made public.
•Staff requested authority for the Director of Planning and Zoning to sign subrecipient agreement.
Decisions
•Board accepted the grant and authorized signature for execution.
•Board authorized counting of 242 approved provisional ballots.
•Commissioner Dove nominated as delegate and Vanessa Reed as alternate (tentative); board to finalize travel/representation details.
•Proclamation adopted as read.
Directions
•Commissioners to coordinate positions for the KAC annual meeting.
•Commissioners to receive report as conditional projection; public asked for independent verification and transparency.
•Director to sign grant documents and implement program outreach.
•Election staff to double- and triple-check ballot orders and packing; maintain logs of affected voters; count 242 accepted provisional ballots and report back.
Tonganoxie City Council Meeting 2026-11-02 - video 2 of 2
Tonganoxie City meeting concluded after an executive session; officials recorded that no binding action was taken and then approved a motion to adjourn by voice vote.
The Lansing City Council met to approve minutes, adopt a rezoning for Eisenhower Crossing Phase Two (allowing roughly 84 duplex units), authorize amendments to the Lansing Town Center development agreement and CID, and adopt revisions to the Sidewalk Cost Share Program (raising the maximum to $9 per sq. ft.). City staff also reported on a planned RIDE LV transit pilot and municipal equipment sales.
Discussion Points
•Council noted developer was present via Zoom for Q&A.
•Councilors asked about service area and timing for projects like the roundabout.
•Equipment sale on Purple Wave raised $27,500 for the municipal equipment fund; staff proposed earmarking 10% of transient guest tax receipts to the historical society.
•Multiple formal votes were taken with unanimous recorded support and one absence noted.
Tonganoxie City Council Meeting 2026-11-02 - video 1 of 2
The Tonganoxie City Council on Nov. 2, 2026 approved purchases for water meters and authorized stormwater repairs in the North Star subdivision, heard a public comment asking that senior customers be given relief from late fees, and directed staff to study billing timing and related policy options. An executive session on development matters followed.
Discussion Points
•Estimated city self-perform cost ~$19k vs engineer bid ~$41k; temporary construction easements needed for full effect.
•Motion to recess to executive session to obtain legal advice on development matters, with statutory citation.
•Overview of meter history and no-read/zero-read issues; warranty constraints; vendor lead times; recommended inventory size of 40 units.
•Partridge suggested moving due date from 15th to 20th; staff warned of regulatory and billing implications.
•Project pay applications for Front Street/Ridge Street and status of sewer treatment plant project.
•Resident testimony about Social Security timing causing late fees.
•Sales tax and compensating use tax trends.
•Survey shows long-term ponding likely due to settlement and grade; proposed grading to form conveyance with additional inlets and 18-inch pipe.
Decisions
•Authorize procurement of up to $39,760 for 112 meters.
•Authorize project preparations and procurement with cost not to exceed $20,000.
•Recess to executive session per statutory exception.
Directions
•Council recessed into executive session; city attorney and management to attend.
•Proceed with procurement and inventory build to replace malfunctioning meters and protect warranty coverage.
•Staff authorized to prepare project materials, obtain temporary easements and proceed up to $20,000.
•Staff directed to research incidence of late fees, billing/regulatory constraints, and fiscal impacts and return with a report by the next meeting.
•Staff to continue reporting on pay applications and project milestones.
Leavenworth County commissioners heard prolonged public comment opposing Project Bluestem, approved multiple rezoning requests and grants, adopted an amended gravel-and-dust control resolution, approved a roof-replacement bid and directed staff to draft countywide community-impact fee guidelines for large developments.
Discussion Points
•An ordering error left one district with insufficient ballots; staff distributed corrected ballots within about 90 minutes.
•Commissioners emphasized countywide representation, including Tonganoxie and other districts.
•Commissioners requested a formal report at the canvass detailing what went wrong and what procedural fixes will be made.
•Darrow said grants require county endorsement for KDOT applications and that no county funds were requested.
•Directive intended to secure maximum community benefits and to be a countywide policy rather than project-specific.
•Engineering report called for mill-and-overlay after top asphalt failure; crews removed two inches over 4,300 feet and will repave when possible.
•Four qualified bids received; lowest qualifying bid from Brunson Builders at $147,977.
•Funding available in facilities improvement fund; Public Works recommended award.
•Opponents raised concerns that Planning Commission split (4–3) reflected neighborhood-character issues and questioned the adequacy of golden-factor review.
•Public commentators asked for full electricity-supply disclosures from Cloverleaf and warned demand-response plans are insufficient.
•Questions covered scheduling, vehicle counts (three RideLV, 11 county vehicles), fare ($2) and potential corporate funding.
•Residents demanded independent studies of water, air, noise and health impacts before approvals.
•Speakers questioned promises of property-tax relief and long-term obligations tied to incentives.
•Staff cited adjacency to RR2.5 and future land-use map context in recommending approval.
•Staff described need for amendment and recent emergency action on Tomahawk Drive and Fairmont Road.
Decisions
•Motion carried to direct drafting of policy guidelines.
•Motion to approve letter of support carried.
•Motion to award bid carried.
•No action on Project Bluestem taken; matter remains under public scrutiny.
•Resolution 2026-23 adopted.
•Rezoning approved by passage of Resolution 2026-24.
Directions
•Adopt Resolution 2026-24 based on staff report and Planning Commission findings.
•Clerk to report at the canvass next week outlining root cause and corrective actions.
•County administrator to draft countywide community-impact/benefit fee guidelines (see separate article).
•County administrator to prepare draft guidelines and convene representation from across county.
•County to provide a letter of support; The Guidance Center to pursue corporate funds and coordinate with Lansing.
•Public Works to complete paving and return with updates.
•Public Works to finalize contract award and return any RBA or information required.
The Leavenworth County board heard a staff presentation of proposed bylaws compiled from League of Kansas Municipalities and the Association of Counties, but commissioners declined to take action and said the incoming board should decide; the meeting was adjourned without adopting bylaws.
Discussion Points
•Commissioner framed recent board behavior as causing distrust and animosity.
•Commissioner insisted public comment should not be censored.
•No formal action was taken to change public comment rules.
•One commissioner expressed concern about board dysfunction but opposed censoring public comment.
•Some commissioners said adopting bylaws before newly elected commissioners take office would be premature.
•Staff presented a draft bylaws compilation from statewide guidance.
Decisions
•No action taken at this meeting; item deferred.
•No policy change recorded; topic deferred.
Directions
•No formal direction or assignment recorded; matter deferred for future consideration by incoming commissioners.
Leavenworth County commissioners heard public comments focused on Project Bluestem, approved several rezoning requests including DEV26-119, accepted grant support letters for local transit providers, approved a roof bid and dust-control changes, and directed staff to draft community impact/benefit fee guidelines for large developments.
Discussion Points
•Commissioners asked questions about implementation and road maintenance timing.
•Desire to include representation from all districts, including Tonganoxie, in drafting process.
•Funding: Guidance Center requested no county funds and seeks KDOT/state funding; commissioners asked about other funding sources.
•Need for a countywide policy so benefits are maximized and consistently applied.
•Operational details: number of vehicles (3 city, 11 county), ride scheduling, partnership opportunities with Lansing.
•Residents asked for independent studies of water, air quality, noise and health impacts before approvals.
•Speakers requested full disclosure from Cloverleaf on electricity supply, anticipated demand and any onsite generation plans.
•Staff presented memo and draft resolution following prior board direction.
•Validity of protest petition (insufficient 20% land-area signatures).
•Whether to remand the case to planning after a narrow 4–3 planning commission vote.
Decisions
•Board adopted resolution 2026-24 and approved rezoning DEV26-119.
•Direction to staff approved; drafting to proceed.
•Letter of support approved.
•No formal decision on Project Bluestem during this meeting.
•Resolution 2026-23 adopted.
Directions
•County administrator to draft guidelines and recommended policy and include district representation.
•County to provide letter of support and invite Riverside Resources to give a future report.
•None formal on the project; commissioners were urged to request more information from Cloverleaf.
•Public Works to proceed with implementation and patch/mill work as described.
The Leavenworth County commission held a brief work session on proposed bylaws and decided not to take action, deferring consideration until newly elected commissioners join the board; the meeting was adjourned without votes.
Discussion Points
•Commissioner (S3) and others favored deferring bylaws until new commissioners are seated.
•Commissioner (S6) expressed that sustained inaction had led to distrust and animosity among stakeholders.
•Concerns were raised that inaction over the past year had caused distrust and animosity among stakeholders (Commissioner (S6)).
•Several commissioners argued the draft should be deferred until incoming commissioners can participate (Commissioner (S3), Commissioner (S5)).
•Staff presented a merged draft of model bylaws from municipal and county association sources (Staff member (S4)).
Decisions
•Deferred action; no formal vote
•No formal action taken; matter deferred to future board.
Lansing City Council Work Session - October 29, 2026
Leavenworth County attorney Todd Thompson led a common-open-meetings and public-records training for the Lansing City council, clarifying notice rules, executive-session limits, and how complaints are filed; staff also announced an upcoming GEO 4.0 emergency-management training on Nov. 5 with eight registrants.
Discussion Points
•Bodies must make reasonable efforts to notify individuals on a contact list; leaving a voicemail can satisfy an attempt.
•Eight people were registered at the time of the announcement; RSVP details were not specified.
•Executive sessions are allowed for specified subjects but may not result in binding decisions; attorney must attend attorney-client sessions.
•Leavenworth County Emergency Management will run GEO 4.0 training Nov. 5 at 2:00 p.m.
•Subcommittees can be subject to open-meetings law and informal multi-member communications risk forming a meeting.
The Lansing City Planning Commission on 2026-10-21 recommended rezoning a vacant parcel at Eisenhower Crossing to R-4 (multifamily duplexes) and approved a preliminary plat for the same site, after public comment raising stormwater, wells, and property-value concerns. The commission added conditions including engineering plans, a sanitary manhole connection and an investigation of historic wells.
Discussion Points
•A commissioner requested investigation of historic wells on the property; staff agreed to add this condition.
•Commission emphasized zoning question (conformance) rather than incentives (City Council topic).
•Commissioners emphasized that stormwater retention must meet UDO requirements and is reviewed through engineering/final plat.
•Commissioners noted that some areas designated office are underutilized and that residential transition may be reasonable.
•Residents described springs, pond and flood risk on/near the site.
•Residents raised stormwater and property-value concerns.
•Staff enumerated plat conditions including stormwater, sanitary sewer manhole, HOA documents and easements.
•Staff presented comprehensive-plan conformance and PUD history.
•Staff presented the future land-use map and PUD overlay history.
Decisions
•No change to the plan at this meeting; rezoning recommended to Council.
•Preliminary plat approved with staff conditions
•Recommend approval of ZN-RZ-26-0004
•Well investigation to be added to conditions; engineering plans required before permits.
Directions
•Add historic well investigation to staff conditions.
•Add well-investigation condition to staff report/conditions.
•Forward rezoning recommendation to City Council.
•Require detailed engineering and final plat submission before construction permits.
•Require detailed stormwater management plan as a condition of final plat.
•Staff to include applicable materials in Council packet.
•Staff to present forthcoming chapters of the draft comprehensive plan in future meetings.
Leavenworth County commissioners held a public meeting that included public comment on a Brownfield grant request, multiple speakers urging adoption of battery energy storage system (BESS) regulations, county staff presentations (planning, HR, IT), a lengthy discussion and public comment about a proposed hyperscale data center (Project Bluestem/Cloverleaf), and a vote to adopt BESS regulations (resolution referenced).
Discussion Points
•Applicability: staff clarified regulations are for standalone BESS; data-center campus BESS are ancillary and handled through DC/PUD rules.
•Commissioners asked about salary competitiveness and unfilled position policy.
•Commissioners asked for legal review and suggested executive session for advice on whether separation of applications constitutes a material change.
•Commissioners requested project details and grant guidelines before providing support.
•Ewell requested letter of support to proceed with KDHE Brownfield assessment.
•Financial security: commissioners asked how decommissioning would be funded and protected in bankruptcy or transfer; staff said escrow, bond, or letter of credit options exist.
•High utilization of on-site clinic (over 80% participation); Savvy student-loan portal shows early loan-forgiveness claims of roughly $100,000.
•Planning process: staff recommended development-agreement details be resolved per project.
•Public requested a ban or regulation on commercial automated surveillance cameras.
•Residents expressed concern about aquifer impacts, water use, evaporative cooling, and chip-cooling technologies.
•Staff cautioned the county’s jurisdiction is limited and that existing installations may be unaffected.
•Staff recommended tying a voluntary-compliance letter to the date the county adopts new data-center regulations.
•Turnover rates steady around 4–6% across quarters; top attrition departments include sheriff's office, public works and EMS.
•No formal action taken on the project; direction to return with legal briefing and draft letter tied to regulation adoption.
Directions
•Commissioners requested information on budgeted unfilled positions if needed for transfer of funds.
•County attorney to draft legal opinion on whether separated applications require resubmittal (material change) and on annexation or revenue-sharing options.
•HR to continue tracking recruitment/retention and report metrics.
•Staff to accept materials and forward to county administrator for review.
•Staff to draft development-agreement language ensuring financial security and present back to the commission.
•Staff to research legal authority and draft vendor-neutral ordinance language for a future work session.
•Staff to schedule the voluntary-compliance letter for the same agenda that adopts data-center regulations and add language asserting county authority to protect public health and landowner rights (per commissioner request).
•Tie guidance for on-site DC systems to data-center regulatory framework.
Lansing City Council Meeting held on October 15, 2026
Lansing City council handled routine business: approved minutes, heard a public comment alleging improper communications on a code enforcement complaint, authorized equipment replacement bids for parks, backed a moderate-income housing (MIH) grant application for the “101” project, and approved the Lansing Town Center 3rd Plat.
Discussion Points
•Chair summarized plat elements: vacation of Center Drive right-of-way, dedication of access easements, parcel IDs.
•City staff said complaint was anonymous and records already provided; city attorney advised other remedies.
•Council asked whether units would be allocated to specific AMI bands; developers said units will be available to qualifying renters when they apply.
•Council clarified purchase would be from the equipment reserve fund.
•Developer representatives described site location and MIH income bands (60–150% of AMI).
•Parks staff described high hours (~1500) and performance problems with 2017 mower.
•Smith alleged council member or staff used informal communications to raise code enforcement.
•Smith requested the originating complaint and a photograph he says was taken on his property.
•Staff noted potential resale proceeds (about $7,000 in a prior sale) to offset purchase.
•Staff recommended acceptance of a reduction in open-space requirements under Article 3.02b.
Decisions
•Motion to authorize bids passed on roll call (8-0).
•Plat approved subject to planning commission conditions.
•Resolution B152026 approved by roll call.
Directions
•Staff authorized to solicit bids and return with recommended award.
•Staff to provide municipal support documentation for the KHRC application if requested.
The Leavenworth County Planning Commission met to hear multiple land-use items including boundary-line adjustments, several rezoning requests, and proposed language amendments for battery energy storage systems; the commission recommended approval of most items and will forward them to the Board of County Commissioners.
Discussion Points
•Applicant said the family intends to preserve the land for limited residential/agricultural use.
•Applicants indicated the split is for family use and to improve marketability.
•Applicant's surveyor said the change is to allow accessory construction and does not create a new buildable lot.
•Commissioners debated whether additional rooftops are economically beneficial and conformity to future land‑use map.
•Commissioners discussed NFPA 855, noise modeling, insurance authority and whether certain small BESS should be treated differently.
•Public comment emphasized preserving rural character and privacy.
•Public commenters and developers stressed safety, setback distances (300 feet for large systems), emergency response planning, and decommissioning/financial security for site removal.
•Public commenters stressed preservation of rural character versus property owners' desire for marketable lots.
•Site lacks public water and sewer; staff argued these constraints support returning to RR‑5.
•Staff and commissioners noted lack of public water/sewer reduces likelihood of near‑term development.
•Staff confirmed the proposed lots meet frontage/area requirements but not the width/depth ratio without exception.
•Staff emphasized the amendments were legal‑reviewed redlines and that no project applications are before the commission.
•Staff explained acreage discrepancy due to right-of-way inclusion in GIS.
•Staff noted parcels meet road frontage but not lot depth-to-width ratio after proposed swap.
Decisions
•Commission recommended approval to BOCC (4–3).
•Motion passed 7–0 to recommend approval.
•Motion passed 7–0 to recommend approval; moratorium continues until BOCC action.
•Motion passed to approve exception; recommendation to BOCC.
•Motion passed to recommend approval; forwarded to BOCC.
Leavenworth County commissioners met to hear routine administrative reports, a road-condition review and presentations from the extension council and emergency management. Public commenters raised concerns about a proposed Bluestem data center project, including water use, PFAS risks and tax impacts of state incentives.
Discussion Points
•$90,000 CWPP grant awarded; mitigation grant work for courthouse generator ongoing.
•9‑1‑1 expenses $297,000 vs. revenue $362,000 to date.
•About $191,000 in assessed structural damage to outbuildings reported after recent storms.
•Ag and Natural Resources agent position to be filled, interview conducted; target by December.
•Cited state policy (Senate Bill 98) could create tax-exemption dynamics that shift infrastructure costs to residents.
•Concern raised about water consumption for evaporative cooling and demand on local supplies.
•Consent agenda accepted by voice vote.
•County faces a multi-million-dollar per year shortfall in road maintenance funding.
•Extension fair enrollment up ~15% and volunteer rate up ~20%.
•Extension provides soil and water testing and nutrition programming.
•Five county residents applied for SBA disaster loans; application window closes Oct. 22.
•No full-board actions scheduled for this meeting.
•Olsen pavement-management specialist will inspect washboarding and rutting to determine permanent fix.
•Public commenters asked for explicit 'red lines' in data-center negotiation documents to prohibit certain cooling or chemicals (PFAS).
•Public works will mill and patch interim problem areas while awaiting the specialist report.
•RFP for concealed-fastener metal roof for county shop will open in two weeks; funding reported available.
•Terracotta production and proposed Feb. 15 start for courthouse exterior work pending weather.
Decisions
•Consent agenda approved
Directions
•Staff to continue analysis of Bluestem proposal and utility requirements.
Leavenworth County Board of County Commissioners held a public meeting on Oct. 7, 2026 with extended public comment about the proposed Bluestem data center and possible onsite power generation, staff updates on elections, public works and planning, several departmental quarterly reports, and routine votes including equipment leases and community corrections reports.
Discussion Points
•115 miles of chip and seal completed; large quantities of asphalt and rock used.
•Board approved a three‑year equipment lease after staff described competitive bid process.
•Clerk noted uncertainties about mail‑ballot receipt deadlines due to litigation.
•Commissioner proposed a regulatory framework for data centers to be incorporated into developer agreements.
•Commissioners accepted materials and public thanked SBA.
•Commissioners and staff clarified separation between land‑use review and later development negotiations.
•Community corrections presented FY '26 outcome reports and the board approved them.
•County Route 30 final phases require right‑of‑way and federal environmental reviews; estimated total near $15 million.
•Early voting start date, Saturday voting locations and mail ballot procedures were explained.
•Mill‑and‑overlay projects needed on aging roads; CIP includes some projects but funding gaps remain.
•Public commenters alleged a 300 MW interconnection filing to Southwest Power Pool for Leavenworth County.
•Residents asked for clearer regulations and incorporation of standards into any development agreements.
•SBA summarized loan types, limits and local application options.
•Staff explained that technical studies require equipment-level details and that land‑use review and development negotiations are separate tracks.
•Temporary chair appointed at meeting start.
Decisions
•Community corrections reports approved
•Lease approved
•Temporary chair appointed
Directions
•Community corrections to continue reporting outcomes.
•Fleet/procurement to finalize lease documents.
•Staff and county attorney to draft the proposed resolution language and return it to the board agenda in two weeks.
•Staff to continue application review and provide timelines; place a draft regulatory framework or memo of understanding on a future agenda.