Citizen Portal
Sign in
Front PageNationalFollowingFavorites
Main Street at Lincoln Avenue, looking northeast, in Downtown Goshen, Indiana, United States

Photo: Jon Konrath from Oakland, USA·CC BY 2.0·via Wikimedia Commons

Monday, November 16, 2026
Indiana / Elkhart County / Goshen

Goshen

OverviewMeetingsDataOfficials
Population
34,4202024
Higher than communities in Indiana
Household income
$59,1842024
Similar to communities in Indiana
Home value
$184,9002024
Similar to communities in Indiana
Unemployment
4.2%2026
Similar to communities in Indiana
Violent crime
2712023
Similar to communities in Indiana
Work from home
4.2%2024
Similar to communities in Indiana
Source: Polco GPAL, using data from the original source shown for each indicator.Data from Polco

Meetings

Loading meetings…

Goshen, Ind.

Open map →
Elkhart County, Indiana · Census county shapes

Quick actions

Goshen officials

All officials →

Hot topics in Goshen

  1. 1 Flock Safety Cameras
  2. 2 Data Center Development
  3. 3 Short-Term Rental Rules
  4. 4 Property Tax Rates
  5. 5 Homeless Encampments
See more →
Citizen Portal
See government, clearly.
Platform
About usFor citiesTopicsNewsDiminished Fourth Estate
Support
Help center
Community
Affiliate programSupport CPVolunteer
Legal
PrivacyTerms
Find your state
ALAKARAZCACOCTDEDCFLGAHIIAIDILINKSKYLAMAMDMEMIMNMOMSMTNENHNJNMNVNYNCNDOHOKORPARISCSDTNTXUTVAVTWAWIWVWYPRGUASVI
© 2026 Citizen Portal. Meeting records and summaries sourced from the public record.
47°F (8°C)
Sunny · H 52° L 32°
20 meetings
13
Nov

Board of Public Works & Safety and Stormwater Board

Indiana//Goshen City

The Goshen City Board of Public Works and Safety considered labor agreements, a police department resolution, utility and infrastructure matters, a road asset management plan and a property-compliance hearing. The board approved multiple contracts and project actions, and imposed civil penalties in the property case.

Discussion Points

  • •A board member asked about the tile's lifespan; the response was “Hundred years.”
  • •Board members discussed city-performed cleanup, cost recovery, possible court action and the potential use of daily violation fines.
  • •Six antique streetlights had not been accepted because punch-list items were outstanding.
  • •Staff described remaining exterior work, missing surety and a signed document, and confirmed occupancy would not be released until required documents arrived.
  • •Staff reported original unpaid final balances of $3,013.65, collections of $73.74 and an uncollected balance of $2,939.91.
  • •Staff said $2,098.57 was connected to a bankruptcy proceeding involving an unnamed Washington state business.
  • •Staff said demolition of Shanklin Park's pool and support buildings resulted in the loss of much of its electrical service.
  • •Staff said grant timing and subcontractor availability delayed work into 2027.
  • •Staff said outdoor electrical pedestals would support existing and future events at the parks.
  • •Staff said signal calibration cost $1,854.37 and was required before the project could be closed out.
  • •Staff said the final payout review found a $2,700 discrepancy attributable to additional salvage roof tiles.
  • •Staff said the parking serving building 1,000 was complete.
  • •Staff said the property showed no significant change from the prior week's photographs and that the owner had not responded to the city.
  • •Staff said the resolution updates titles for the two positions immediately below the police chief and language concerning an upper-level policymaking position.
  • •Staff said the road had been milled and overlaid and identified cracking had been addressed.
  • •Staff said two potential violations involved siding and insufficient solid-waste containers; no court finding was made.
  • •The chair said the only bid proposed $15,000 for each of two lots.
  • •The legal department recommended a 2026 well and pump service agreement with a maximum cost of $150,990.
  • •The plan includes about seven miles of chip seal and other treatments; equipment may enable some city-performed reclamation and alley work.
  • •The presenter described a 3.5% wage increase for 2027 and additional certification bonuses.
  • •The presenter described pay-rate restructuring, a changed overtime calculation and sick-leave changes.
  • •The presenter reported an average roadway rating of 3.81, compared with 4.3 the prior year, and attributed the decline primarily to less work completed.
  • •The stormwater plan had been prepared before Ordinance 5227 was passed, while the motion referenced Ordinance 5228.
  • •The updated contract total was reported as $4,003,702.09, 3.89% below the original bid.

Decisions

  • •Resolution 2026-25 was adopted unanimously.
  • •The board activated the previously suspended $5,000 penalty and imposed an additional $5,000 effective Dec. 10; the motion passed unanimously.
  • •The board approved moving uncollected final accounts into collections, sewer liens and rentals.
  • •The board approved the 2027 agreement.
  • •The board approved the agreement.
  • •The board approved the amended change order; at least one vote opposed it, but the tally was not stated.
  • •The board approved the pavement asset management plan.
  • •The board unanimously accepted the streetlights for maintenance.
  • •The board unanimously approved Change Order No. 4.
  • •The board unanimously approved the agreement, with a $94,387 ceiling.
  • •The board unanimously released the letter of credit and accepted public infrastructure for permanent maintenance.
  • •The completion agreement was conditionally approved.
  • •The referral motion passed; the properties were not awarded.
  • •The stormwater plan was accepted unanimously.

Directions

  • •Do not release the certificate of occupancy for building 1,000 before receipt of the required documentation.
  • •Mayor Leckie was authorized to execute the agreement.
  • •The board kept all prior orders in force.
  • •The mayor was authorized to execute the agreement.
  • •The proposals were referred to redevelopment for further consideration.
11
Nov

Redevelopment Commission, City of Goshen

Indiana//Goshen City

Goshen City Redevelopment Commission met on Nov. 10, 2026, received the annual TIF report and a downtown market/parking study, approved the RDC spending plan and several contract amendments and awards, and set a Dec. 8, 2026 next meeting.

Discussion Points

  • •$80,000 internal estimate for railroad crossing based on comparable projects; staff to pursue major participation for federal grants.
  • •Additional right-of-way needs increased staking/title work.
  • •Annual TIF collections and projections for 2026 and 2027.
  • •Bid award rationale for using contractor already working on development.
  • •Breakdown of the $31.3M cap (capital, debt service, professional services).
  • •Bridge needed to unlock west-side redevelopment and provide emergency-vehicle access.
  • •Causes of lower-than-expected collections: refunds, delinquency, tax-exempt conversions.
  • •Clarification that approval is a reporting cap, not spending authorization.
  • •Extension of inspection services relates to expanded scope and longer schedule; commissioners questioned whether extra funds reflect contractor delays or expanded scope.
  • •Outstanding bonds and which allocation areas pay them (e.g., 9th Street bond).
  • •Recommendations: enforcement, shared parking, appointing a parking lead, signage and published occupancy counts.
  • •Total counts and occupancy rates (2,958 spaces; 45% overall occupancy; ~66% at First Friday).
  • •Trail design extension to Deardorff Road and additional easement/earthwork.
  • •Whether to design a utilitarian two-lane bridge sufficient for emergency and light vehicular access versus a more decorative higher-cost structure.

Decisions

  • •Approve amendments and authorization (4-0).
  • •Approved amendments and awarded trailway contract (voice votes).
  • •Approve submission to DLGF (4-0).
  • •Supplemental agreement approved 4-0.

Directions

  • •Execute amendments and award; coordinate with developer and contractors.
  • •Proceed with updated design to current standards; staff to present costed alternatives.
  • •Provide clearer budget breakdown for College Avenue phases at next meeting; pursue NACOG funding for right-of-way.
  • •Staff to continue monitoring assessed-value changes and update projections as tax-rate data becomes available.
  • •Staff to post the full report to the public website and consider an advisory committee; staff to adjust signage and continue occupancy counts.
  • •Submit plan to DLGF; return individual project approvals as required.
11
Nov

City of Goshen Economic Improvement District - 11/10/2026

Indiana//Goshen City

Goshen City advisory board reviewed proposed 2027 property assessments, asked questions about year-end budget adjustments and encumbrances, discussed a SharePoint/group email for owner outreach, and raised lighting and holiday-decoration updates.

Discussion Points

  • •A form can be created for owners to opt in to receive emails.
  • •Committee members asked about calculation changes and newly included properties.
  • •Constituent asked about dark alley on Food Row and potential for lights.
  • •Definition and use of encumbrances/"congress" in local accounting.
  • •Four year-end mechanisms explained and state notice/oversight for appropriations highlighted.
  • •Large past carryovers (example: $13M) and state scrutiny risks.
  • •SharePoint can host documents, a calendar, and provide a group email address.
  • •Staff presented proposed assessments mailed Oct. 27 and supplied a spreadsheet and forms.
  • •Staff said options (overhead or wall-mounted) were being explored.

Decisions

  • •Aim to include outreach letter by year-end if provisioning completed.
  • •Hearing on remonstrances scheduled for Dec. 1 at 8 a.m.; filing deadline with legal department Nov. 25.

Directions

  • •Staff to provision the SharePoint site and group email and to provide training.
10
Nov

Community Relations Commission

Indiana//Goshen City

The Goshen Community Relations Commission held a special meeting on Nov. 9 to hear presentations from local groups applying for community partnership grants, including housing, public events, arts, homelessness services and food-access programs; the commission will review applications in executive session before deciding.

Discussion Points

  • •Approximately 26% of musicians live in Goshen; ~20% of spending is local contracting.
  • •Event estimated to bring ~$200,000 in visitor spending.
  • •Facade program preserves historic integrity and funds exterior rehabilitation and window/painting work.
  • •Financial-empowerment programs and HUD‑approved counseling reach hundreds (presenter cited roughly 500 people educated through classes).
  • •First Fridays used Bluetooth counters and hand counts to estimate attendance (nearly 9,000 across two events) and a Goshen College study estimated ~$140,000 economic impact from those counted events.
  • •Inclusion efforts included Greencroft screenings and a free family block sponsored by Exhale Science.
  • •La Casa maintains 248 affordable units and plans to add 14 more.
  • •Landlord incentive of approximately $250 for new Section 8 landlords; units must meet HUD housing-quality standards.
  • •Mobile recertifications reduce transportation barriers for Goshen clients.
  • •Neighborhood cleanups proposed in partnership with the city.
  • •New community-building closet served ~180 families since July and the program delivers food boxes to homebound residents.
  • •Organizers average about 120 pilots and estimate ~650 spectators last year.
  • •Organizers seek sponsors and plan to celebrate a 25th anniversary in 2027.
  • •Partnerships with police and mobile integrated health help triage crises and connect people to services.
  • •Plans for 2027 include a 20th-anniversary series across monthly events.
  • •Produce-prescription cohorts recruit ~25 patients annually; adults receive $15 tokens per visit; Sprouts Kids tokens support school-age nutrition.
  • •Program tracks health data and offers cooking classes (about five classes this year reaching ~50 people).
  • •Rental education offers $400 deposits to graduates to remove move-in cost barriers.
  • •Riverbend screened 80+ films from 12 countries and reported a 41% increase in ticket/merchandise sales over 2025.
  • •Safety and logistics require city support for mowing, tenting and crowd management.
  • •Shelter capacity and services (14 beds; up to 43 people) and case-management focus.
  • •State grant funds have dried up; program relies on local donations and partner fundraising.
  • •Two major 2027 performances will be supported if funded (Soudert Hall in Feb; fall collaboration with Goshen Theater).
10
Nov

Elkhart County Live Meeting

Indiana/Elkhart County

Elkhart County Board of Commissioners met Nov. 9, 2026, and approved contracts and code updates, authorized advertising for a 2027 paving program, and heard public comments opposing the appointment of a new county health officer and raising local road-safety concerns.

Discussion Points

  • •Board approved adoption.
  • •Commissioner questioned CCMG totals and lane-mile distribution
  • •Highway staff outlined contract coverage (approx. 640 miles) and contractor count (13).
  • •Highway staff reported $336,593.13 award and 50% match requirement
  • •Kaiser read prior statements attributed to Dr. Nossinger urging masking and vaccination.
  • •Kaiser said she believed Dr. Nossinger was not the right candidate for county health officer.
  • •Resident reported near-collisions and lack of lane markings and lighting at the Perkins detour.
  • •Staff explained the supplement incorporates ordinances passed since 2014 and sets effective dates.
  • •Staff noted vendor has provided services previously and the agreement extends prior contracts.
  • •Staff will publish plowing routes and thresholds online.

Decisions

  • •Adopted the supplement; motion carried unanimously.
  • •Approved snowplow contracts; motion carried unanimously.
  • •Approved the independent contractor agreement.
  • •Authorized advertising; motion carried unanimously

Directions

  • •Authorize advertising notice to bidders for 2027 CCP
  • •Chair to contact Elkhart City regarding the detour.
  • •Post plowing patterns and standards to highway website.
9
Nov

Tree Board

Indiana//Goshen City

Members of the Goshen City tree board met Nov. 9, 2026, to review recent plantings, discuss replanting methods for a street project, finalize a bilingual 2027 calendar (an IDART layout estimate of $1,600 was reported), schedule a nursery field trip, and hear taxonomy and training updates.

Discussion Points

  • •Comparison of groundcover options (wood chips vs native plantings) and visibility/maintenance concerns.
  • •IDART layout estimate of $1,600 and grant funding availability.
  • •Member availability constraints (school pickup, work times).
  • •Noted lack of universal acceptance; guidance to consult authoritative taxonomic sources before changing labels in city materials.
  • •Past print run: 3,000 calendars at $4.20 each (~$12,600).
  • •Planned removal of defunct electrical and irrigation infrastructure at Thurn Street prior to replanting.
  • •Proofreading steps and bilingual page checks, including QR codes.
  • •Proposed field trip date and time (Thursday the 19th at 5 p.m.).
  • •Proposed split of flowering dogwood into different genera as reported in Arborist News and World Flora Online.
  • •Recommendation to limit species diversity for a central location to ensure establishment and visibility.
  • •Reported 33 trees planted in one morning and ~12 later; sites include Johnston Ave., Elkhart Rd., Green Rd., Eisenhower/College corridors.
  • •Student volunteer participation tally and hours credited to the board.
  • •Value of partnerships with local educational institutions.

Decisions

  • •Minutes approved by voice vote; board to finish plantings and continue planning for Thurn Street project.
  • •Tentative date set pending confirmations.

Directions

  • •Board to proof pages, collect missing photos/text, and contact printers (Economy Offset suggested) for time and cost estimates.
  • •Board will finalize replanting palette and prepare bid documents for tree removals/contractor work (legal consultation referenced).
  • •Continue outreach to schools for future volunteer support.
  • •Member to forward article and links to the group for review.
  • •Staff to confirm logistics and notify members.
  • •Staff to draft planting palette and specifications suitable for the Thurn Street site and include irrigation removal in scope.
6
Nov

Board of Public Works & Safety and Stormwater Board

Indiana//Goshen City

Goshen City board meeting: members approved minutes and the agenda; reviewed multiple construction bids and referred the Thursday Trail Phase 1 bids; held and closed a public hearing and adopted Resolution 26-22 establishing an average processing expense for unsafe-building actions; discussed (and tabled) a proposal to give engineering staff limited authority to process routine road/sidewalk requests; accepted a Rockford–5th Street reconstruction recommendation (Job 2014-0025) and approved the 2026 bridge inspection report (Job 20260003).

Discussion Points

  • •Board approved mayoral authorization to sign acceptance paperwork.
  • •Board asked when the fee would apply; staff clarified it covers recoverable costs incurred by board-ordered actions that required contractor work or other external expenses.
  • •Board members discussed meeting frequency, the need for documented requests, and which thresholds should remain with the board.
  • •Board voted to accept the report as submitted, placing findings into the official record.
  • •Engineering presented the 2026 bridge inspection report dated 10/08/2026.
  • •Engineering reported modified closeout forms and revised deeds during final review.
  • •Motion to refer bids passed.
  • •Staff described components of the processing expense and provided an illustrative average of $1,808.
  • •Staff read bid amounts and alternates; board asked no substantive questions on bids.
  • •Staff requested permission to draft a resolution to formalize engineering authority.

Decisions

  • •Authorization granted; project moved toward administrative closeout.
  • •Bids referred for review; no award made at meeting.
  • •Item tabled pending submission of a draft resolution.
  • •Report accepted; staff authorized to act on inspection recommendations.
  • •Resolution 26-22 adopted; staff charged with implementing guidance.

Directions

  • •Engineering staff and volunteer board member(s) to draft formal resolution language and criteria.
  • •Engineering to review recommendations and return with any required contract or repair requests.
  • •Mayor to sign documents; staff to file acceptance paperwork.
  • •Procurement and engineering to review bids and return recommendation.
  • •Staff to work with legal to finalize wording and application criteria for the adopted processing expense.
2
Nov

Elkhart County Board of Commissioners Meeting 2026-11-02

Indiana/Elkhart County

The Elkhart County Board of Commissioners met Nov. 2, 2026, approving several administrative items — including a revised Health Department fee ordinance implementing a new state mobile-unit license fee — and unanimously approving contractor and bridge grant actions; a resident raised conflict-of-interest concerns during public comment.

Discussion Points

  • •Board approved application.
  • •Commissioner said he rode his bike over it and approved acceptance.
  • •Commissioners approved staff's request to apply.
  • •Commissioners raised concerns about potential revenue loss and staffing implications if mobile units do not pay the new fee.
  • •County Attorney Steve Olson presented the agreement and noted no task order yet exists.
  • •Department will monitor income and staffing during implementation year.
  • •Hajicek presented specific allegations about county contributions, requested that funding end, and sought a resignation from a commissioner from the EDC executive committee.
  • •Health Administrator explained statewide single-license model and local revenue retention ($200) vs state share ($250).
  • •Highway Department reported contractor and county engineer inspected the bridge.
  • •Highway staff described the bridge as 66 years old and in poor condition and noted a new structure would have a 75-year lifespan.
  • •Highway staff presented grant amount and match requirements ($2,549,884 total; $530,212 local match).
  • •IT department recommended exploring the vendor; the board approved adding the vendor to the approved list.

Decisions

  • •Board accepted Bridge 233 into inventory.
  • •Board approved amended fee ordinance; added $20 late fee; removed pregnancy testing from fee schedule; adjusted dental fees to align with Medicaid.
  • •Board approved independent contractor agreement to add vendor to county list.
  • •Board authorized staff to apply for the INDOT rural grant.
  • •Board authorized submission of INDOT application.
  • •No recorded action in the meeting; item was public comment only.

Directions

  • •Health Department to monitor revenue and staffing and report back if impacts materialize.
30
Oct

Board of Public Works & Safety and Stormwater Board

Indiana//Goshen City

Goshen City Board of Public Works and Safety met in October 2019 to approve routine minutes and agenda changes, adopt several resolutions (including a Title VI plan and PFAS settlement participation), authorize contracts and easements, consider engineering change orders and lane closures, and hold building-commissioner hearings that included tabling multiple property compliance matters.

Discussion Points

  • •Board directed staff to revise specifications and pursue next steps.
  • •Board members asked no substantive questions and approved the resolution.
  • •Board members expressed appreciation for progress on long-languishing properties.
  • •Buyer for 1705 West Plains introduced himself, said he closed on the property, and asked about permit processes. Staff explained tabling so staff and buyer can coordinate.
  • •Engineering staff explained the need for change orders and reasons for rejecting a sole bid.
  • •Legal staff described project options (rental units/duplexes or single-family homes) and infrastructure funding responsibilities.
  • •Legal staff explained the annual review and compliance obligations under Title VI.
  • •Legal staff summarized the national litigation and recent settlements and recommended participation.
  • •Staff described added hours and noted partial work completed in 2025.
  • •Teresa Cummings explained the increase and the funding reallocation to housing for owner-occupied rehab.

Decisions

  • •Approved sidewalk and Century Drive change orders; rejected sole Denver Street bid; extended NIPSCO lane closures.
  • •Authorized mayor to execute the development agreement.
  • •Board adopted the updated Title VI plan and ratified mayoral assurances.
  • •Board approved resolution authorizing participation.
  • •Board approved the contract amendment and authorized mayoral signature.
  • •Board authorized the mayor to sign the revised CDBG agreement.
  • •Multiple orders tabled to allow closings and rehabilitation work; no enforcement actions completed at this meeting.

Directions

  • •Authorize staff to work with outside counsel to file claims.
  • •Revise specifications for Denver Street curb/sidewalk work and determine next procurement steps.
  • •Staff to meet with new owners and report back at tabling dates.
28
Oct

BZA Meeting

Indiana//Goshen City

Goshen City meeting: the board heard a request to amend a prior use variance for 505 South 9th Street to allow keeping a front-yard parking pad; staff recommended denial and the board voted to follow staff recommendations, keeping the condition requiring removal/stabilization of the front concrete.

Discussion Points

  • •Acceptance of minutes and filing of documents were proposed and seconded.
  • •Applicant requested keeping front-yard pad citing family vehicle size and cost of removal.
  • •Board and staff discussed site survey measurements, property-line offsets, and available side-yard parking.
  • •Staff explained prior May 2025 variance conditions (remove front-yard concrete and stabilize with grass).

Decisions

  • •Both procedural motions were approved by voice vote as announced by the chair.
  • •Motion carried to follow staff recommendations and deny the requested amendment, maintaining the concrete-removal requirement.

Directions

  • •Board directed that the prior condition remain in force and explained that on-street parking remains an option where not prohibited by signs.
27
Oct

Elkhart County Live Meeting

Indiana/Elkhart County

The Elkhart County Board of Commissioners met Oct. 26, 2026. Agenda highlights included an IDVA veterans services performance report, approval of several emergency-management grants, a multi-year contribution agreement with the South Bend Elkhart Regional Partnership, adoption of an ADA pedestrian transition plan, multiple highway and traffic-control actions, and public comment critical of the Regional Development Authority.

Discussion Points

  • •Administrator described contribution as a non-binding commitment contingent on council funding
  • •Allegation that relocation incentives pay people to move in and work remotely (Make My Move cited)
  • •Commissioner abstained due to absence from prior meeting
  • •Commodity flow study costs and consultant charges
  • •Counts of veterans records in Vetrospect and recent application activity
  • •Criticism of Indiana Economic Development Corporation oversight and audits
  • •Details of each grant, training and exercise components for HMEP
  • •Engineering traffic studies justify speed and stop changes
  • •Fee not-to-exceed amount and contract reference
  • •FY2025 VA compensation/pension totals for county residents
  • •Grant is a pass-through to Walker Resources LLC
  • •IDVA accreditation standards and required KPIs
  • •Legal and sheriff's office support noted
  • •LPA agreement required to secure INDOT 80% construction funding
  • •Need to update prior resolution to reflect DOJ modifications
  • •Norfolk Southern award of $2,500 toward radios
  • •Objection to hiring of a land bank manager and request for more time to comment
  • •Plan meets Title II ADA obligations
  • •Procedural steps to enable project construction
  • •Routine claims and minutes approval
  • •Salary reimbursement tier change increased amount to $80,500
  • •Task order scope: replacement design for Bridge 336
  • •Task order with OHM Advisors for MS4 reporting and maintenance
  • •There are four appointed cases to date; goal to expand services
  • •Weights and measures report approval

Decisions

  • •Agreement approved to allow project to proceed
  • •All consent/administrative items approved
  • •Approved contribution commitment, contingent on funding
  • •Each grant application/acceptance approved by the board
  • •Grant approval recorded
  • •Ordinance adopted unanimously
  • •Resolution adopted unanimously
  • •Task order approved
26
Oct

City of Goshen Common Council

Indiana//Goshen City

City council approved three wage-related ordinances, renamed a fees fund, heard a strong financial report showing healthy cash balances, and honored longtime firefighters and a competitor from the firefighter challenge.

Discussion Points

  • •City reported strong liquidity and positive operating balance through Aug. 31.
  • •Council asked whether county wheel-tax distributions and a potential state gas-tax holiday would affect municipal receipts.
  • •Council presented plaques and thanked retiring staff for service.
  • •Morgan Dyer explained the firefighter challenge events and results.
  • •Need to create a trainee/civilian recruit role to allow full evaluation time while complying with statutory one-year probation limits (Chief Powell).
  • •Operational change: use of a paramedic-staffed chase vehicle to reduce engine wear and control dispatch practices (Chief Powell).
  • •Plan to eliminate division chief roles and expand captain responsibilities.
  • •Proposed new positions: evidence manager and intelligence analyst; analytic role will remain in IT pending role clarification.
  • •Restructuring eliminates sergeant classification and adds lieutenants and tiered progression to concentrate raises on mid-level ranks (Administration).
  • •State required specific fund language; the existing fund was named incorrectly in city books.

Decisions

  • •Ceremonial recognitions presented; no formal actions required.
  • •Financial report approved by unanimous voice vote.
  • •Ordinance 52-72 passed on 2nd and final reading (approved unanimously).
  • •Ordinance 52-73 passed on second and final reading via unanimous vote.
  • •Ordinance 52-75 passed unanimously on second reading.

Directions

  • •Administration to implement trainee pathway and adjust classifications per ordinance.
  • •Clerk-Treasurer to provide follow-up with specific line-item allocations and the MBH fund number referenced.
  • •Finance to update fund name in accounting system and state reports.
  • •Monitor overtime and staffing levels; report back if attrition or state legislation changes assumptions.
  • •Pause hiring for some positions until legislative budget clarity; maintain some functions in IT in the near term.
24
Oct

City of Goshen Common Council

Indiana//Goshen City

Baker Tilly presented parcel-level modeling showing how recent state property-tax changes (phase-ins and new credits) could reduce Goshen's net assessed value and increase tax-credit losses, with an expected spike in 2027 driven largely by a drop in business personal property. Council members pressed for parcel-level data and options for budget adjustments.

Discussion Points

  • •Baker Tilly lacks parcel-level pay‑27 abstracts needed to identify the precise cause.
  • •Certified pay‑27 net assessed values show a ~6.2% decline from pay‑26 in Goshen, driven by an unexplained decline in business personal property.
  • •Consultants will provide updated parcel-level data when available in spring.
  • •Estimated range of general-fund tax-credit losses for 2031 presented.
  • •Local officials prefer stability and will gather data before endorsing major changes.
  • •Minimum-growth scenario projects larger losses and quicker reserve erosion.
  • •Modeling based on pay-2026 parcel data and pay-2027 certified net assessed values; compound vs minimum growth scenarios drive results.
  • •Request for updated pay‑27 parcel abstracts and revised appendix slides.
  • •Several distinct legislative proposals are being circulated at the statehouse; local leaders are tracking options.
  • •Skepticism about long-run 12% industrial growth and concerns about parcel-level variation in cap exposure.
  • •Supplemental homestead credit definition and phase-in schedule.
  • •Traditional circuit-breaker depends on tax rate and assessed value; some credits are applied after circuit-breaker.

Directions

  • •Baker Tilly to provide updated appendix slides and parcel-level analysis once the state releases pay‑27 abstract data.
  • •Consultants to provide clearer labeled slides and appendix with order-of-operations and examples.
  • •Consultants to provide parcel-level follow-up and alternate scenarios (minimum-focused).
  • •Consultants to re-run and update model once parcel-level pay‑27 abstract data are available.
  • •Finance staff to consider conservative planning and possible budget reductions; consultants to provide alternate scenarios.
  • •Staff and council to monitor state proposals and provide local feedback to legislators.
21
Oct

City of Goshen Plan Commission Meeting

Indiana//Goshen City

The Goshen Plan Commission held a hearing on a three‑lot Miller Pond subdivision and conducted a public hearing on a proposed Goshen Unified Development Ordinance (UDO). The commission granted primary approval for the Miller subdivision with conditions, reviewed a list of 19 minor corrections to the UDO, and voted to forward the UDO and map to the City Council with a favorable recommendation.

Discussion Points

  • •Correction #14 addresses B‑2 district development standards and #18 clarifies the setback definition in Chapter 9.
  • •Minutes and staff reports adopted by voice vote.
  • •Outreach included a technical committee, public surveys, focus groups, trainings and an open house; staff recommended periodic review of the UDO after adoption.
  • •Primary approval of Miller Pond subdivision with technical conditions; forwarding of UDO with corrections to Council.
  • •Public comments included support from builders and a written concern from a nearby resident about Lot 1 proximity to a future path.
  • •Scope and chapter structure of proposed UDO (chapters 1–9) including zoning districts, form districts, site and structure standards, subdivisions, procedures and definitions.
  • •Staff presented a list of 19 corrections (typographical, citation, and a small set of substantive clarifications).
  • •Staff recommended primary approval conditional on right‑of‑way dedication for Oak Lane extension and drainage solutions.

Decisions

  • •No legislative adoption at this meeting; the commission voted later to forward the UDO with corrections to City Council for consideration.
  • •Plan Commission voted to forward the corrected draft UDO and zoning map to City Council with a favorable recommendation.
  • •Primary approval of the 3‑lot Miller Pond subdivision granted.
  • •See actions list above.

Directions

  • •Secondary subdivision to be reviewed by staff through technical review.
  • •Staff to forward the draft and corrections to City Council per a later motion.
  • •Staff to prepare transmittal packet to City Council including corrected draft and corrections list.
  • •Staff to process secondary subdivision technical review and to transmit corrected UDO to City Council.
17
Oct

City of Goshen Common Council

Indiana//Goshen City

City consultants presented a proposed unified development ordinance (UDO) update for Goshen, explaining major reorganizations—zoning districts, form-based downtown/urban neighborhoods, a shorter land-use table—and answered council questions about maps, tiny homes, ADUs, parking and timelines toward plan commission review and council readings.

Discussion Points

  • •Allow single‑family attached (townhouse) forms with smaller lot widths where units are attached.
  • •Extensive public engagement and a technical committee informed the draft.
  • •How form district rules apply to existing buildings versus new construction.
  • •Need to consolidate 40+ year old zoning and subdivision ordinances into a single UDO.
  • •One‑page parking table with exemptions for downtown; reductions within 1,000 feet of bus stops and for covered bicycle parking.
  • •Questions about permeable parking and residential yard parking enforcement.
  • •Reduce minimum lot widths and lot areas to align with existing parcel realities.
  • •Tiny homes listed in use table for specific districts; ADU technical standards and building‑code requirements.
  • •Whether to extend downtown form to riverfront and north of Lincoln/Pike.

Directions

  • •Consultants to provide examples and a PDF of the parking page and where reductions apply.
  • •Consultants to provide ordinance pages and where ADUs/tiny homes are located in the use table.
  • •Consultants to provide shapefile and PDF/PowerPoint to council and staff for review.
  • •Consultants to provide shapefile of proposed map for detailed inspection.
  • •Consultants to provide side‑by‑side comparison tables of current vs proposed dimensional standards.
16
Oct

Elkhart County Council Meeting 10/15/2026

Indiana/Elkhart County

Elkhart County Council adopted the 2027 budget and a series of ordinances and appropriations including drainage and highway project funds, approved multiple departmental grant budgets and transfers, and established a new building and construction-related fees fund effective 01/01/2027.

Discussion Points

  • •Council asked how private tiles become regulated and how maintenance responsibilities change.
  • •Council asked no substantive follow-up questions beyond confirmation.
  • •County Attorney explained statutory requirement and fund mechanics (custodian/auditing agent).
  • •County Attorney summarized changes included in the salary ordinance exhibits and confirmed the Recorder's sworn request was received.
  • •Deputy Auditor read extensive per-fund estimates and advertisement changes; council discussed numbers aloud for public record.
  • •Health department explained the WIC grant process and a $1.68 rounding discrepancy corrected during the meeting.
  • •Highway described winter impacts and need to restock salt and cover increased fuel/repair costs.
  • •Surveyor described project locations (Boyer Tile, Burkholder) and maintenance funding needs.
  • •Surveyor explained specifics of Boyer Tile and Burkholder drain projects, cooperation with Kosciusko County, and scope of maintenance funding.

Decisions

  • •Adopted 2027 budget ordinance CC2026-36 by recorded vote (5-0).
  • •All listed appropriations and transfers were approved, most by unanimous vote (5-0).
  • •Appropriation approved, allowing projects to move to planning and procurement steps.
  • •Both ordinances adopted (5-0).
  • •Ordinance adopted 5-0; fund to be used only for statutorily authorized purposes.

Directions

  • •Funds to be used for specified project work and replenishment as described; departments to follow grant and procurement rules.
  • •Proceed with project planning and coordinate with Kosciusko County when needed.
15
Oct

Board of Public Works & Safety and Stormwater Board

Indiana//Goshen City

Goshen City board held a brief meeting that approved the day's agenda, authorized submission of engineering bids for a proposal of $598,439.12 (attributed to Marie Riley), approved settlement of city and utility claims, and adjourned.

Discussion Points

  • •A motion was made and seconded to submit the bids to engineering and was approved unanimously.
  • •Board approved the agenda by motion and voice vote.
  • •Chair identified the engineering request as coming from Marie Riley and cited a base proposal amount of $598,439.12.
  • •No public comments were made during privilege of the floor; board moved to approve settlement of city and utility claims and adjourn.

Decisions

  • •Agenda approved; claims settlement approved; meeting adjourned.
  • •Motion to submit engineering bids approved unanimously.

Directions

  • •No follow-up directions recorded.
  • •Staff authorized to submit bids to engineering (no additional direction or timeline recorded).
15
Oct

Elkhart County Council Budget Hearing 10/14/2026

Indiana/Elkhart County

Officials read the advertised notice for the Elkhart County 2027 budget, recited levy and fund estimates and held a first reading of the 2027 salary ordinance CC 2026-35. The public hearing is scheduled for Aug. 31, 2026 at noon in Goshen; the budget adoption meeting is Oct. 15, 2026 at 4 p.m.

Discussion Points

  • •County attorney read ordinance by title and reminded council this was a first reading.
  • •Detailed fund levy and rate amounts were read; staff distinguished funds inside the levy from those outside the maximum levy.
  • •Explained objection petition rules (10 or more taxpayers; filed within 7 days).
  • •Many fund estimates were read, including TIFs, user-fee funds, and grant lines.
  • •Motion made and seconded to close first reading; voice vote recorded as 'Aye'.
  • •Read advertised notice; announced hearing and adoption dates.
  • •Totals were reported with an advertised-change adjustment.

Decisions

  • •First reading closed by voice vote
13
Oct

Redevelopment Commission, City of Goshen

Indiana//Goshen City

Goshen City Redevelopment Commission met Oct. 13, 2026, and approved several developer agreements and construction amendments, amended a housing agreement with La Casa to raise the income cap to 80% AMI, approved a $63,418.58 change order for Century Drive work, and authorized procurement steps for Deardorff Road and other projects.

Discussion Points

  • •Change order covers widened commercial drive aprons and drainage/culvert repairs; contractor pricing was reviewed by engineer.
  • •City will cap its infrastructure contribution at about $100,000, primarily for water and sewer extensions.
  • •Commission appointed two members to the scoring committee.
  • •Commissioners discussed retaining vintage interior features rather than full replacements given housing needs.
  • •Commissioners pressed whether engineering should have anticipated these items and suggested lessons-learned reviews.
  • •Coordination with Elkhart County's regulated drains and county surveyor's office required.
  • •La Casa requested flexibility on AMI level to align with changing federal funding rules.
  • •Need to evaluate whether more stormwater can be accommodated on the north side of College Ave to reduce infrastructure elsewhere.
  • •Owner requested mortgage forgiveness; staff recommended modified scope with inspections.
  • •RFP requests schedule alternatives for fully local funding and a fast-tracked federal funding approach.
  • •Staff submitted for additional federal funding and is evaluating phasing vs. single-year compression to manage contractor capacity and cost.
  • •Updated cost estimate to $13.9M construction; $7.8M increase when inspection and water-main replacement included.

Decisions

  • •Approved $10,800 amendment to Evan Marsh contract.
  • •Approved change order No. 1 for Century Drive.
  • •Commission amended agreement to 80% AMI and approved the agreement as amended.
  • •Commission approved modified agreement and authorized staff to sign.
  • •RFP authorized and review committee established.

Directions

  • •Engineering to perform additional survey and calculations and report results.
  • •Engineering to perform a project closeout review and capture lessons learned for vendor performance.
  • •Staff to inspect property and verify satisfactory completion of agreed work before mortgage release.
  • •Staff to return with refined cost estimates and funding outcome information by year-end.
  • •Staff to solicit proposals, distribute to committee members, and return with recommendations.
  • •Staff to work with La Casa on funding applications and return with zoning/plat steps if single-family option chosen.
13
Oct

Elkhart County Board of Commissioners Meeting 10/12/2026

Indiana/Elkhart County

Elkhart County Board of Commissioners met Oct. 12, 2026 in the Aldo J. Simpson Chamber to open bids for the Orfa Drive–County Road 37 intersection project, approve multiple supplemental appropriations for highway and facilities costs, authorize a civil enforcement action tied to a development ordinance, and fund planning work for County Road 17 Phase 2.

Discussion Points

  • •A resident asked for more detail and whether such costs would be recurring.
  • •Board announced and congratulated Commissioner Susie Wyrick on statewide award.
  • •Highway staff tied the bid opening to INDOT US 20 work and a Middlebury sewer upgrade and noted the project includes bike path realignment.
  • •Hope described the work and scope for Phase 2 engineering and permitting.
  • •Lightman noted the new building and rising utility costs affected budgets; commissioners asked if next year's budget reflects those changes.
  • •Olson described statutory and ordinance authority and explained why ticketing had not achieved compliance.
  • •Staff cited winter diesel use, chip seal operations, equipment breakdowns and inability to access a state bid as reasons for higher costs.
  • •Taylor cited ongoing contracts and litigation as reasons for the additional legal budget.

Decisions

  • •Board approved authorization to pursue civil enforcement.
  • •Board approved both appropriations.
  • •Board approved the appropriation.
  • •Board approved the appropriation by voice vote.
  • •Board approved three supplemental appropriations by voice vote.
  • •Board voted to receive bids and have staff review; no contract award was made.

Directions

  • •Planning and legal staff authorized to file civil action.
  • •Proceed with geotechnical and survey work and report progress.
  • •Staff confirmed next year’s budget request accounts for the new building.
  • •Staff to provide further details in financial reporting.
  • •Staff to review bids and report back with recommendation.
  • •Track expenditures and return with additional appropriation requests if required.
Gina Leichty
Mayor
Brett Weddell
City Council President
Donald Riegsecker
City Council Vice President