Harrison County Commission convened Oct. 21, 2026. Officials heard federal disaster-recovery presenters from the SBA and FEMA, moved several nuisance and demolition actions forward, approved contracts and change orders on development and infrastructure projects, authorized bond-placement work for White Oaks and the county airport, and voted to stop live streaming commission meetings beginning Jan. 1.
Discussion Points
•Board clarified that financial approvals would remain the commission's prerogative.
•Board discussed rationale for ending live streaming and adopting an internal recording system, with at least one dissent noted.
•Grant application lists 43 properties for $403,500; staff noted typical demolition cost averages and bulk-bidding approach.
•Presenter described use of proceeds to pay off subordinate bonds held by developer HITECH and to provide additional capital for development.
•Proponent argued projects need hands-on oversight; others said county office staff could take on coordination.
•SBA outlined loan amounts, interest rates, and eligibility; FEMA reported registrations at a local DRC and clarified deadlines.
•Staff asked commissioners to post SBA and FEMA information on the county website.
•Staff reported repeated outreach attempts and a recent request for extension.
•Supporters argued an in-house attorney would handle day-to-day legal needs and reduce outside counsel reliance; some commissioners raised objections or asked for details.
•Vendors suggested narrowing CEC's scope to pad/road, moving utilities to McKinley to speed schedule.
Decisions
•Appointments approved; no funding commitments were made at appointment time.
•Approve lift budget, in-house attorney budget, and end live streaming beginning Jan. 1.
•Change-order motion carried to limit CEC to pad and road work.
•Emergency nuisance declarations approved; resolution to apply for WVDEP VVAT grant approved.
•Engagement letter approved; no issuance authorized.
•Proceed to circuit court on nuisance matter.
Directions
•Commissioner Hinkle to coordinate design work and provide updates to the commission.
•County staff to post SBA and FEMA outreach materials on the county website and distribute contact cards provided by federal staff.
•Engage Piper Sandler to structure potential placements; staff to return with details.
•Planning to file the nuisance action with circuit court.
•Return with details on funding and job parameters.
•Staff to prepare a specific change-order draft and confirm vendor acceptance before final approval.
•Staff to prepare procurement specs, job description and technical plan for recording and posting.
•Staff to submit the VVAT grant application and proceed with bids for emergency demolitions.
Harrison County Commission conducted routine business on Sept. 2, 2026, including public comment urging use of opioid funds for a recovery program, acceptance of a will for probate, several small project requisitions and funding requests, presentations from library and hospice representatives, infrastructure and maintenance updates, grant applications, and the appointment of a fiduciary commissioner.
Discussion Points
•Administrator noted Varner's application and paperwork were received.
•Chair presented each requisition item and called for motions.
•Commissioners congratulated the team; no county action required.
•Commissioners noted issues in the Taylor will and decided referral was appropriate.
•Commission moved to approve appointment and voted by voice.
•Courthouse roof leak and hot-water pump parts ordered.
•Edwards described facility capacity (9-bed ER, 10 inpatient) and planned services.
•Ed Waske described youth outreach (about 250 students) for the aviation expo.
•Freight elevator replacement discussed; some repairs ongoing.
•Library staff described upcoming passport fairs and a book sale and invited commissioners to participate.
•No substantive discussion; motions carried by voice vote.
•Proclamation text read listing multiple county libraries and services.
•Rail-trail resurfacing over 10 miles completed; ongoing cleanup after rain events.
•Reverend Gary Smith requested funds to address park liabilities in Stonewood.
•Sandy reported she could not find the original Newsom will.
•Staff described the DHS grant as funding for continuing cybersecurity upgrades.
•Staff said CFIA assistance was previously used for elevator projects and that the full freight-elevator replacement would cost roughly $600,000.
•Sutton requested county opioid-related funds be directed to his recovery program and offered to supply copies of the proposal.
•Sutton said relapses cost about $35,000 and that 80% of people go on Medicaid.
Decisions
•$4,500 for Livestock Association approved; $2,000 for youth expo approved; $35,000 parks request taken under consideration.
•Accepted Antero Foundation grant; authorized CFIA and DHS grant applications.
•Deb Varner appointed as fiduciary commissioner.
•Newsom probate approved; Taylor estate referred to fiduciary commissioner.
•Requisitions approved.
Directions
•Clerk to affix required signatures for Newsom probate.
•Clerk to complete appointment paperwork.
•Facilities and grant staff to prepare CFIA application and required documentation; IT to prepare DHS application.
•Maintenance to coordinate contractor inspections for elevator and drainage fixes.
•Parks and Recreation to follow up on the Stonewood request for later consideration.
The Harrison County Commission met Oct. 7, 2026, approved routine consent items, granted several small community funding requests, heard updates on extension services and the animal-control shelter, and awarded two rail-trail construction contracts to a low bidder while flagging questions about scope and budgeting.
Discussion Points
•Administrators and attorneys outlined ongoing claims (e.g., mesothelioma), pending guardianship proceedings, and difficulty locating heirs.
•An heir‑to‑property workshop on Nov. 2 was announced and will be posted on Extension channels.
•Commission agreed extensions were warranted to allow claims and sales to proceed.
•Commissioners approved funding with minimal discussion and passed the health awareness proclamation.
•Commissioners cited need for closer financial oversight of card usage because commission is ultimately responsible for payments.
•Commissioners requested a precise wording of the amendment consistent with ARPA eligibility and a breakdown of prior expenditures.
•Commissioners requested CEC provide a report at the next meeting and increased oversight.
•Commissioners required verification meetings and added a 10% contingency to each award to limit change‑order exposure.
•County staff (Thrasher/engineers) to administer contracts and present change orders for approval.
•Geotechnical drilling finished or nearly finished; report due in 2–3 weeks.
•Presenters emphasized community access, volunteer support and outreach.
•Schematic design expected by early November; construction documents Feb–Apr next year.
•Staff described eScribe's ADA conversion and agenda automation benefits and presented costs for start‑up and ongoing service.
•Staff explained rationale to avoid losing ARPA funds due to timing and project delays.
•Staff presented bids showing Blue Gold as low bidder for both contracts; large gaps to county estimates prompted concern.
•Volunteer hours and program achievements for 2025–26 were highlighted.
Decisions
•Amend MOU to reallocate remaining ARPA funds to eligible payroll/benefits and professional services; motion carried.
•Award both contracts to Blue Gold Development LLC with a 10% contingency; motion carried.
•Funding requests approved and proclamation adopted.
•Move P‑card and credit‑card oversight under commission control pending legal confirmation; approve eScribe purchase.
•No formal action required; commissioners acknowledged and thanked staff.
•No immediate action; status report requested
•One‑year revisit for Lois Marie John estate; six‑month extensions for several other estates.
Directions
•CEC to deliver geotechnical report and status update at the next meeting.
•Clerk to execute eScribe purchase and begin implementation in January.
•Clerk to monitor estates and return with updated lists at scheduled intervals.
•County to require performance/payment bonds and increase inspection oversight.
•Extension to post event details and continue outreach with schools and partners.
•Finance to process grants and request usage/event reports as noted.
•Finance to reallocate remaining funds into general fund line item and earmark for eligible bridge payroll/professional services.
•Obtain counsel opinion on credit‑card authority and return with procedure recommendations.
•Staff to clarify which design elements await geotech results (foundation, pad).
•Staff to confirm what budget amount the commission previously approved for the trail phases and report back.
•Staff to meet with Blue Gold to confirm scope and unit prices.
•Staff to provide detailed accounting of ARPA spend to date and finalize MOU amendment paperwork.
Harrison County Commission meeting on 2026-11-04 covered routine consent items, a public comment urging a ride-for-recovery program, debate about rising jail-related costs, several budget and scheduling items (including ARPA fund reallocation and pay schedule), park closure for construction, a $200,000 cybersecurity grant application, and approval of $11,000 toward ADA doors for the Town of West Milford.
Discussion Points
•Arguments for biweekly pay (alignment with other employers and administrative ease) vs. arguments to maintain 15th/30th schedule to avoid disruption to employees.
•clarifying_details":[{
•decisions":["Approved 11 a budget revision."]}}],
•directions':['Forward the revision to the auditor's office for processing.'],
•Presenter read statistics on diagnoses and deaths and urged awareness and research support.
•Public commenter Dave Sutton advocated for a ride-for-recovery transportation program to reduce relapses and taxpayer costs.
•Rising jail bills (single invoices up ~$20,000) and monthly totals potentially approaching $200K–$250K; staff noted rate thresholds tied to night stays are a driver.
•Safety concerns with equipment staging and public access; suggestion to close park during construction and to revisit at March meeting.
•Staff explained the grant would fund two-factor authentication and cybersecurity improvements; application is backup to September homeland security submission.
•Staff explained the need to move ARPA funds from a project that could not be utilized into General County.
•Two quotes were presented: $10,833 for Susan Duhoff entrance and $24,503 for community building entrance; commissioners debated county responsibility for buildings accepted previously.
Decisions
•Approved requisitions 5 a and b; no immediate budget reallocation for jail costs was made.
•Approved resolution to apply for $200,000 cybersecurity grant.
•Motion to allocate $11,000 carried.
•Motion to close Summit Park during construction passed; revisit at last March meeting, aim to reopen April 1 if safe.
•Motion to retain the 15th and 30th pay schedule carried.
•Proclamation adopted; ribbons distributed.
Directions
•Convene local stakeholders (city managers, judges, prosecutors) to discuss causes and options.
•County will provide $11,000 toward the Susan Duhoff door and process payment through levy funds.
•Hold a work session on steps and benefits before the next meeting.
•Staff to notify affected users via phone, email, and registered letter as needed.
•Submit the WVEMD application; withdraw if earlier grant is awarded.
Harrison County Commission met Sept. 16, 2026. Commissioners approved routine consent items, set an early-voting satellite at Meadowbrook Mall for the 2026 general election, appointed Amber Beach as executor for the estate of Leona Mae Claire after a public petition, approved a $319,120 TIF payment to Pratt & Whitney, awarded $3,500 to VFW Post 573 for its Veterans Day parade, and authorized multiple grant applications including funds for a courthouse freight elevator and school prevention-resource officers.
Discussion Points
•Amber Beach said she petitioned to be executor and had been caring for the decedent; commissioners discussed prior appointee inactivity.
•Appointment listed on agenda and moved for approval; no discussion recorded.
•Commission amended request to $3,500 and approved.
•Commission approved application to pursue state funding.
•Commission authorized pursuit of JAG funding.
•Commission clarified the start year (confirmed as 2028) and approved the MOU.
•Commissioners questioned which spot in the mall would be used; staff noted proximity details.
•Commissioners requested a new appointee for the Harrison County Development Corp and asked staff to contact a vendor about porta-potties near the courthouse.
•Contractors are addressing items on the Shunsten Rail and the trail remains open.
•Decision: appoint Amber Beach as executor and require filing of appraisals, bonds, and a status update on Oct. 21.
•Decision: approve Meadowbrook Mall as early-voting satellite for 2026 general election.
•Funeral-home representative reported liens/claims totaling about $6,400 and requested help moving probate forward.
•Staff confirmed calculation and fund availability for a $319,120 TIF payment under the March 4, 2020 agreement.
•Staff described grant amount per deputy and a 25% match.
•Staff described the MOU as the same used with other municipalities and noted no substantive changes beyond ordinance alignment.
•Staff outlined estimate ($600,000) and prior funding sources; proposed 1:1 state grant match.
•Staff recommended hours for trick-or-treat; commissioners moved to approve.
•State auditor's office will begin FY26 audit next week.
•VFW described program and need for funds.
Decisions
•Apply for JAG funds for school prevention/resource deputies
•Apply for the West Virginia State Development Grant for the elevator project
•Appointment of Amber Beach as executor
•Appoint Veronica Gallo to Board of Health
•Approve $319,120 TIF payment to Pratt & Whitney
•Approve $3,500 for VFW Post 573
•Approve Meadowbrook Mall early-voting satellite
•Approve MOU with Lost Creek
•Set countywide trick-or-treat hours for Oct. 31, 2026, 6:00–7:30 p.m.
Directions
•Amber Beach to qualify and file appraisement and bonds and coordinate with clerk's office
•Elections staff to confirm precise location and schedule with mall management
•Elections staff to execute MOU and finalize logistical planning for 2028
•Staff to place development-corp appointment on next agenda and contact porta-potty vendor.
Harrison County Commission met Aug. 19 for routine business including public comments on state and local initiatives, proclamations on overdose awareness and rail-trail repairs, several grant acceptances, and debated (then tabled) a contract with Total Assessment Solutions to audit oil-and-gas assets.
Discussion Points
•Commissioners raised the cumulative dollar amounts of simultaneous funding requests ($214,000 noted)
•Commissioners weighed using fund 02/06 vs. waiting for opioid-settlement funds
•Concerns about duplicate assessment and litigation if consultant re-assesses assets already in state tax filings
•Confidentiality of operator renditions and whether county can require protection by contract
•Contract available via Sourcewell cooperative to avoid separate bidding
•Grant amounts and intended program uses were summarized by staff
•Greater Harrison offered donated materials valued at approximately $17,000 to reduce county cost
The Harrison County Commission met Aug. 5, 2026. Public comment centered on opposition to the proposed Valley Link North transmission line; the commission voted to adopt a formal resolution opposing the project. Other business included nuisance-property remediation orders, several funding requests and grants, a pledged contribution toward a Lumberport water project, rail-trail planning, contract discussions and equipment purchases.
Discussion Points
•Commissioners expressed concern about immigration-related framing and asked that the proposal focus on drug enforcement and prosecution components.
•Commissioners requested a business plan, specific deliverables for Harrison County, and clarity on opioid-fund timing.
•Commissioners sought developer engagement and technical information before vote.
•Commission favored a two-tranche pledge and safeguards to return funds if project costs fall.
•Committee bylaws expanded to include municipal representation and fundraising partners.
•Extended public comment emphasised health, water, property-value and farmland concerns.
•Grant would fund prosecutors, analysts, forensic tools and task-force support targeting transnational drug threats; presenters emphasized no county match.
•Greater Harrison indicated limited funds and offered in-kind materials and to remove a fire hydrant.
•Presenter described prior $65,000 campaign and potential statewide funding model.
•Prioritize connecting Shinnston to Clarksburg and address failing retaining wall and bridges.
•Project would decommission Lumberport plant and purchase water wholesale; state grant shortfall created funding gap.
•Replacement bid was removed to meet initial budget; risk of future asphalt failure if not replaced.
•Roberta Barnhart said she will transfer the deed to Christina Jones who intends to remediate.
•Staff asked for documented recorded deed and timeline; motion sets strict dates.
Decisions
•Adopted resolution opposing the Valley Link transmission line.
•Authorized filing of DOJ application; directed staff to share draft for review.
•Bylaws approved; trail priorities set and staff directed to move forward on bids.
•Item tabled pending utility financials.
•Pledged up to $500,000; details to be resolved administratively.
•Request tabled pending additional materials.
•Two-week deadline for deed recording; 30-day remediation period after recording.
Directions
•Applicant to return in two weeks with business plan and deliverables; staff to identify opioid-fund availability.
•County counsel to draft pledge agreement with payment schedule and return-of-funds provisions.
•Staff to advertise bids and pursue right-of-entry/property acquisition; county attorney to review ownership records.
•Staff to circulate the application draft to commissioners before submission; emphasize law-enforcement and drug-trafficking focus in language where appropriate.
•Staff to confirm deed recording; if not recorded the commission will pursue further enforcement.
•Staff to obtain Greater Harrison\u0002s financial information and return the item to the next agenda.
•Staff to seek additional financial documentation from Clarksburg and Shoreline PSD.
•Staff to transmit resolution and monitor regulator filings.
The Harrison County Commission held its regular meeting on July 15, 2026, approving routine consent items, several budget revisions and grant applications, and taking action on property, procurement and courthouse design issues. Commissioners revisited a nuisance-property case for Linda Gail Siders, authorized coordination with the state Supreme Court on courthouse design changes, and approved a temporary construction easement for a Shinston boat-ramp project.
Discussion Points
•Commission agreed to allow 60 days for progress and then re-evaluate.
•Commission approved award to Midstate.
•Commission approved budget revisions by motion.
•Commission authorized multiple small grants and applications to support animal-control veterinary costs and spay/neuter services.
•Commissioners asked about total elected-official raises; state guidance referenced a 5% increase.
•Commissioners congratulated the animal-control staff.
•Commissioners emphasized the need to avoid vehicle access on the rail trail and to build barriers if necessary.
•Commissioners requested both the original and revised drawings and emphasized Supreme Court approval is required for courtroom layouts.
•Consultants agreed to produce cost estimates and revised drawings; coordination with the court will occur in parallel.
•Consultants proposed reducing courtroom count from five to three and consolidating offices to cut costs.
•Owner Linda Gail Siders stated she owns a fractional share of an estate and is removing appliances and debris with family assistance.
•Shinston described location and parking plans near the rail trail and under a bridge.
•Staff announced animal-control received national recognition from Best Friends for moving toward no-kill operations.
•Staff outlined carryover and a $7,170 variance to allocate to a farm/livestock project under coal severance.
•Staff recommended Midstate at $119,988 including equipment.
•Staff reported certified notices sent to the property owner with no response.
•Standard temporary easement terms were described; commissioners approved the motion.
•Three bids were received; a lower bid lacked the required equipment.
Decisions
•Approve budget revisions 10 A and C.
•Approve temporary construction easement and authorize signature corrections.
•Authorize Banfield and Two Mods applications; accept Petco funds and cultural grant.
•Award contract to Midstate.
•Commission approved the direction to proceed with redesign and to coordinate with the Supreme Court.
•Commission to revisit the nuisance-property matter in 60 days (postponed action).
Directions
•Animal Control to report back when grant outcomes are known.
•County legal and engineering to coordinate long-term use agreement for parking if needed.
•County staff to coordinate with the West Virginia Supreme Court before advancing design efforts.
•McKinley to return with revised drawings for magistrate and family court and cost estimates.
•Purchasing to finalize contract and arrange delivery.
•Staff to file applications and record accepted funds.
•Staff to finalize signatures and ensure project specs include protections for the rail trail.
•Staff to inspect property and report back at the 60‑day follow-up.
•Staff to provide detailed breakdown of salary schedule impact if requested.
Harrison County Commission met June 17, 2026, approved a slate of routine financial and administrative items, set a schedule for a primary-election contest hearing, approved a $37,000 contract for courthouse sidewalk project, and approved a grant application and several budget revisions.
Discussion Points
•Commission debated hiring McKinley Architecture for sidewalk design and bid management at a $37,000 lump sum; some commissioners said fee appears high relative to concrete costs.
•Commissioner said the $37,000 design/PM fee seemed high compared with concrete costs.
•Commission set detailed scheduling order and deadlines for an election contest filed by Laura Kimball, including a July 1 hearing date.
•Commitment to try to complete work before the Italian festival.
•Concern raised that outstanding invoices for bond‑funded projects are growing and appear unpaid; counsel to investigate whether county liability exists.
•Counsel emphasized the need to move quickly given the deadlines and the commission’s chamber hours.
•Participants confirmed dates and filing instructions; commissioners asked clarifying questions about prehearing filings.
•Staff discussed HAVA e‑poll book grant with a 15% local match and possible payment‑plan options if the county purchases equipment before reimbursement.
•Staff floated payment‑plan approaches and cautioned about purchasing before reimbursement.
•Staff noted a 15% match and estimated county share at roughly $36,000–$37,000.
•Staff said the fee covers design, permitting, bidding and construction administration but not materials.
Decisions
•Approve application for HAVA security grant and proceed to clarify procurement/payment details.
•Approved arbitrage rebate payment of $10,538.34 to the IRS (from bond funds).
•Approved consent agenda, payroll change notice B, various project fund requisitions and budget revisions.
•Approved McKinley Architecture & Engineering project management agreement for $37,000.
•Approved McKinley Architecture project management agreement for courthouse sidewalk at $37,000.
•Approved scheduling order for Laura Kimball v. Tim McNeely primary contest with hearing on 07/01/2026.
•Scheduling order adopted with hearing on July 1 and filings due on June 26.
Directions
•County Clerk and procurement staff to clarify payment and procurement contingencies and report back.
•County Clerk to notify parties and arrange hearing logistics for July 1, 2026.
•County Clerk to prepare hearing logistics and notices for the election contest and to pursue HAVA grant application; clarify procurement/payment options if grant awarded.
•Finance to file arbitrage rebate paperwork and to ensure payment is taken from bond proceeds, not the general fund.
•Public Works/staff to work with McKinley and report timeline with aim to complete before the local festival in August.
•Staff to confirm status of outstanding project invoices and whether unpaid prior balances create county liability.
•Staff to work with McKinley and provide a timeline to the commission; Public Works to manage procurement for materials separately.
The Harrison County Commission met July 1, 2026, approving routine consent items, several small community funding requests and budget revisions, renewing a professional services contract, and approving an engagement letter for legal work on a TIF modification while removing an AI clause from that engagement. Commissioners discussed trail and bridge projects and tabled county AI policy to August.
Discussion Points
•Commissioners requested more information on sheriff overtime costs and wanted the AI policy tightened before adoption.
•Concerns about an AI clause in the firm's engagement and county oversight of contractor AI use and data ownership.
•Environmental review and permitting will be lengthy; possible need for Army Corps permits for stream/bridge work.
•Staff proposes breaking the rail‑trail into five segments and pursuing IGT funding for four segments via the city of Shenston.
•Whether the Steptoe & Johnson engagement should be open‑ended or set to periodic reviews; firm stated typical timeline of about six months.
Decisions
•Approve resolution to apply for abandoned‑mine grant; proceed with IGT discussions and bid schedule for trail segments.
•Engagement approved; AI clause removed; six‑month review cadence set.
•Multiple routine approvals carried; AI policy tabled.
Directions
•Staff to pursue IGT funding, finalize estimates for four sections, coordinate with DEP and DOH, and return with updates.
•Staff to return with a breakdown of overtime costs and updated AI policy language; staff to submit abandoned‑mine grant application next week.
•Staff to schedule a six‑month update and provide contract language reflecting removal of AI clause.
•Staff to submit abandoned‑mine grant application next week.
Harrison County Commission met June 3, 2026, handling routine consent agenda items, several local funding requests, property and park issues, and multi-item discussion and approvals on the county rail trail project. Commissioners debated whether to allow a two-year window for community fundraising to save the Sunset Ellis drive-in screen and approved bids and easements to advance trail work.
Discussion Points
•Arguments that the structure is unique and could serve tourism or museum purposes
•Bidding schedule and scope for two separate but contiguous rail‑trail contracts
•Concerns about committing county funds and maintenance burdens
•Karate team costs and AAU payment routing
•Lost Creek drainage project can be coordinated but needs an easement with restoration standards
•Parks grant project list totaling up to $15,000
•Past AJGA fundraising impacts and charity distribution
•Potential for change orders to add contiguous work if economies permit
•Request amount (~$800,000) and sufficiency of TIFF 6 funds
•Safety concerns about structural stability adjacent to Route 19
•Shinston’s larger expected crowd for the 250th celebration
•USACE permitting required for stream‑bank stabilization
Decisions
•Approved all listed funding requests and approved grant application resolution
•Approved TIFF 6 disbursement to airport
•Authorize advertising and bidding for rail‑trail contracts; negotiate and execute Lost Creek drainage easement; create rail‑trail advisory board and request staff to draft bylaws and return appointments
•Two‑year community fundraising and study window approved; county funds prohibited for rehabilitation
Directions
•Finance to issue checks; parks to file grant application; staff to process payments
•Staff to draft advertisement materials and coordinate dates
•Staff to draft advisory board bylaws and mission statement and return recommendations
•Staff to negotiate and execute Lost Creek easement with remediation requirements
•Staff to process disbursement and coordinate with airport officials
•Staff to request permission for interior inspection and to document safety hazards
•Staff to return with engineering findings and any recommended actions if community effort fails
Harrison County Commission met May 20, 2026. The commission approved routine consent items, awarded several small grants and contracts, purchased a farmland protection easement, tabled a proposed Summit Park lease for further review, and debated rail-trail security before voting to hire four park rangers.
Discussion Points
•Directions included staff to execute payments/contracts and return with required documentation where appropriate.
•Several community grants and procurement awards were discussed; staff explained grant reimbursement timing for a courthouse grant.
•Whether sheriff's deputies or park rangers should be designated to patrol the rail trail; enforcement powers of deputies vs. ranger roles; civil-service status and budget implications; grant availability for park-ranger positions; staffing levels and equipment needs.
•Whether the nonprofit lessee is currently in good standing with the Secretary of State; whether the lease text properly includes the lower/multi-use field; concerns about past informal work at the park without prior commission approval.
Decisions
•Commission voted to hire four park rangers; commission did not adopt the motion to hire two deputies.
•Item tabled; no lease adopted.
•Multiple routine approvals, easement purchase and procurement award approved by voice votes.
Directions
•Finance to issue payments for approved grants and disbursements.
•Procurement to finalize the sheriff roof contract and provide missing bidder documentation for records.
•Send the draft to the West Virginia Girls Softball League and require proof of nonprofit compliance with the Secretary of State and IRS.
•Staff to coordinate with the sheriff's office on operational expectations and when deputies will respond to incidents.
•Staff to prepare a hiring plan, budget estimates, patrol schedules and details on equipment/vehicles for four park rangers.
•Staff to prepare clarified lease language and return at the next meeting.
Harrison County Commission meeting with public comment on recovery transportation and Summit Park softball fields, a nuisance-property hearing that resulted in a 90-day compliance timeline, an economic-development update citing roughly $350 million in projects, several routine approvals and grant-resolution votes, and proclamations for foster-care and mental-health awareness.
Discussion Points
•Commissioners asked for lists of projects and supporting detail.
•Multiple routine approvals and grant-authority resolutions were approved by voice vote; staff clarified some grant-lingo questions.
•Public commenters requested three dedicated softball fields and reliable utilities; a contractor offered donated labor; commissioners raised concerns about lease noncompliance and public access.
•Staff and commissioners flagged potential deed covenants that must be honored if the county were to transfer or alter park responsibilities.
•Staff reported initial contact in October and said cleanup had stalled; Delisa Pearson presented photos and a volunteer cleanup timeline; commissioners asked for specific items to be removed (unsafe structures, trailer, truck, garbage).
•The sheriff's-office roof award will be delayed for further review.
•Wilson presented recent outreach, trade-show attendance, prospect activity and grants for site readiness and brownfields assessment.
Decisions
•Commission approved motion to give owner 90 days to complete cleanup.
•Commission voted to allow continued use by the softball league and to review legal/deed constraints.
•Consent agenda and listed resolutions approved; roof award tabled.
Directions
•EDC to provide commissioners with detailed lists of projects and prospect information.
•Owner to coordinate with county staff and keep staff updated on cleanup progress; staff to inspect property after 90 days.
•Staff and county attorney to review deed covenants and return with findings before any transfer or permanent change in park responsibility.
•Staff to follow up on procurement/grant-match questions and to return with a detailed bid review for the roof award.
At its April 15, 2026 meeting, the Harrison County Commission heard public testimony on several open estates and voted to leave four delinquent estates open for six months; it also approved the placement of a permanent power pole by the courthouse to support renovations at the adjacent Golf Building and approved several small funding and budget items.
Discussion Points
•Attorney Richard Marsh said two collection cases in Upshur County are pursuing roughly $80,000 for an estate.
•Commissioners agreed to replace the courthouse front sidewalk using plain concrete and to wait on larger sidewalk replacement pending city grant timing.
•Commissioners expressed concern about outstanding bills and requested documentation for certain creditor claims.
•Commissioners sought assurances the county would not incur costs; Mr. Sharp said the requester would pay.
•Counsel and family members described pending collection efforts and communication delays with third parties such as EQT.
•Mr. Sharp described the transformer in a basement exposed to water and said moving/refeeding required a pole at the courthouse corner.
•Multiple small funding requests and budget revisions were presented and approved by voice vote.
•One agenda item listed as a $5,000 request was approved; the transcript contains inconsistent naming between the agenda and the motion text for that foundation.
•Some commissioners proposed alternate county-owned locations; others favored the courthouse corner to expedite power for renovation.
Decisions
•Approve listed funding requests, project requisitions, budget revisions, travel requests and the courthouse front sidewalk replacement.
•Approve placement of a permanent pole at the courthouse corner to refeed the Golf Building.
•Leave specified estates open for six months; close the remaining estates on the docket.
Directions
•Clerk to verify foundation name discrepancy and confirm approved amounts for accounting.
•County staff (clerk/finance/public works) to process payments, update budgets and proceed with sidewalk procurement.
•Proponent to proceed with permitting and installation and confirm payment responsibility to the county.
•Table fiduciary commissioner recommendation concerning Christina Louise Kiesling Esling to the next agenda and ask fiduciary commissioner Robert Pevler for additional information.
Harrison County Commission met April 1, 2026, approved routine consent items and several grant applications, passed proclamations (Child Abuse Prevention Month; Week of the Young Child; Sexual Assault Awareness Month), allocated small event funds, and voted to begin site work and design adjustments for a planned county animal control facility on county-owned property.
Discussion Points
•Clarksburg History Museum presented details for Liberty Market (vendors, military displays, vendor count ~70 in prior year)
•Commission directed consultant CEC to revise pad two to increase acreage for future development
•County purchased the 40‑acre Ellis property (~$500,000) originally intended for an animal control facility and youth complex
•One option behind the projection screen minimizes dirt work and uses existing utilities; other options offer larger flat acreage but require much more grading and utility work
•Proclamations emphasize partnerships among county agencies and local advocacy organizations; statistics in the sexual assault proclamation were read from prepared text.
•Staff summarized grant programs: community corrections funds, justice reinvestment initiative, Petco in‑kind vaccine award, Walmart and Kroger local grants
•Three candidate pads (1,2,3) were compared with excavation estimates from ~10,000 to 335,000 cubic yards; earthmoving cost estimated $6–$7 per cubic yard
•Town of West Milford requested festival funding (Float the Fork) for May 29–30
Decisions
•Approved allocations and authorized grant applications
•Approve directing CEC to revise pad two to increase size for future development
Harrison County Commission held its March 18, 2026 regular meeting, approved routine funding and grant applications, debated payroll/security budgeting and animal control site options, and advanced plans for the United International rail-trail switchback and related legal/engineering work.
Discussion Points
•Commissioners debated moving security payroll from levy to county budget lines and worried about repeated shifting of employees between funding sources.
•Commissioners expressed urgency to build and frustration over long delays and multiple property reviews.
•Draft rail-trail ranger concept includes job description, enforcement ordinance and budget; rangers would not have arrest powers and enforcement would rely on citations.
•Ellis parcel is undergoing Army Corps permitting and has potential permitting/timeline risks.
•Meadowbrook parcel is zoned industrial and was submitted through the RFP as an alternate; preliminary review suggests it could be a viable alternate but needs study.
•Resident public comment raised concerns about certified-notice timing and county process server service on weekend; requested program pause and review of notice/appeal procedures.
•United International's attorney asked that the county consider a switchback and preserve certain rail sections; staff evaluated feasibility and presented options.
Decisions
•Authorization to negotiate and proceed with engineering for the northern switchback (Haywood area).
•Donation policy adopted with departmental approval thresholds.
•Multiple small funding and requisition motions approved by voice vote.
•No site was selected; direction given for staff to complete due diligence and return with findings.
Directions
•Authorize counsel and engineering staff to negotiate and finalize switchback recommendation.
•Finance/Administrator to issue check to Circuit Clerk's Association from fund 02/06.
•Staff to assemble a due diligence timeline (surveys, potential wetland delineation, Phase I, core drilling if needed) and report back to the commission.
•Staff to consider ARPA funding timing in recommending next steps.
•Staff to monitor nuisance property asbestos testing and return within 30 days if unresolved.
•Staff to return with an edited ordinance, a master enforcement map and budget numbers for the ranger concept.
Harrison County Commission met March 4, 2026, hearing public comment on the Wolf Summit project and sewer rate concerns; the commission accepted a will, approved several funding and procurement items (including $5,000 to the American Red Cross and a $98,645 demolition contract), tabled a startup grant request for a county ride-home nonprofit, and advanced planning for a new animal control facility.
Discussion Points
•Applicant described app-based model, budget estimates, and early-stage board.
•Clerk and commissioners confirmed witness requirements for acceptance.
•Commissioners asked about remaining demolition budget and possibility of further demolitions after asbestos testing.
•Commissioners cited available acreage, utilities, and the need to protect wetlands and wildlife.
•Commissioners expressed support and approved the allocation.
•Commissioners supported the mission but cautioned about using county funds as seed money.
•Funding sources mentioned included ARPA and existing county funds.
•Lowest bid from EnviroClean was $98,645 for 10 structures; staff confirmed availability of contract for signature.
•Museum requested pass-through to comply with state grant process and ensure receipts are traceable.
•One commissioner recused due to service on the nonprofit board.
•Red Cross described scope of activities and requested $5,000 to fund one blood drive.
•Representative explained original will may have been misplaced; assured the commission the presented copy reflected decedent's intent.
•Staff noted need for a paper trail and possible notary or signatures.
•Three candidate sites evaluated (Meadowbrook Road, Route 19, Ellis Drive) with competing arguments over immediacy vs. environmental review.
Decisions
•$5,000 allocation approved by voice vote.
•Commission approved pass-through and reporting arrangements.
Harrison County Commission met Feb. 4, 2026. The meeting included a public comment from a property owner alleging improper tax-sale procedures and requesting reimbursement, approval of farmland easements totaling $400,000, debates over a courthouse-security memorandum of understanding, allocations of opioid-disbursement grants to local nonprofits, award of a bid for two police cruisers, multiple routine consent items, and deferral of a website modernization RFP to Feb. 12, 2026.
Discussion Points
•Allocation of hiring, firing, scheduling, discipline, and budget control for courthouse security.
•Farmland Protection Board recommended purchases from its fund.
•He cited deputy state auditor email stating the auditor's office lacks authority to set aside tax sales and that county offices must correct records.
•Location and size of Stenger and Stark parcels, appraisal and survey status, floodplain considerations.
•Phillips described purchase date, tax payment attempt, county records errors, and redemption fees incurred.
•Requirement that county will not pay until vehicles are delivered.
•RFP compliance by bidders, breakdown of equipment and warranty details, and delivery schedule (21–60 days reported by bidders).
•Whether to return to or revise earlier 2017 commission order limiting sheriff's operational control.
•Which programs represent direct 'boots-on-the-ground' services versus digital outreach; whether some applicants are nonprofits eligible for these funds; and prioritization for prevention programs in schools versus outreach to people currently using drugs.
Decisions
•Award bid to Statewide Ford for two vehicles, delivery within 30 days, payment upon delivery.
•Commission approved both easement purchases.
•Commission approved the list of allocations by voice vote and moved to prepare requisitions.
•MOU adoption deferred; no final transfer of control recorded on Feb. 4.
•No reimbursement or formal remedial action was adopted at the Feb. 4 meeting.
Directions
•Chair asked staff to follow up with the state as needed.
•Commission asked staff to review Phillips's Nov. 10 correspondence and county records.
•Staff to complete title work and proceed with closing steps.
•Staff to issue purchase order, require delivery verification and tighten RFP language for future procurements.
•Staff to prepare a complete written MOU and job description for the commission to review at a future meeting.
•Staff to prepare requisitions and confirm eligibility for certain applicants (e.g., Skidmore Digital and others).
Harrison County Commission held a regular meeting covering routine consent items, vendor payments, a nuisance property hearing that resulted in a 30-day compliance order, proclamations for awareness months, votes to place transit and vital services levies on the May 12, 2026 ballot, a $2.5 million budget authorization for completing portions of the rail trail, and detailed staff directions on security and Charles Pointe tax-stakeholder outreach.
Discussion Points
•Administrator updated the commission on levy publicity, budget work, website RFP, parking lot assignments, and preparations for employee handbook review.
•Clarification required on firearms-range fee and which range/association (deputy sheriff's association) controls access.
•Commission discussed scope for emergency absentee policy and ballot commissioner appointments in the same agenda block.
•Commissioners clarified that code language lists many possible nuisance indicators but does not necessarily mean all apply to this case.
•Commissioners confirmed the funded scope covers Mount Clare to VA Park and Lost Creek segments but not the Route 19 crossing.
•Commissioners discussed inclement weather policy and possibilities for employee flexibility during storms.
•Commissioners emphasized publication responsibilities and timeline.
•Commissioners expressed concerns about 24/7 security costs, statutory authority, and the levy language's intended uses.
•Commissioners noted prior cleanups in 2019 and deed transfer in 2023; they emphasized community standards and nuisance code language.
•Commissioners requested written engineer findings on annex wall before paying McKinley Architects invoice.
•Commissioners want proactive outreach and a work session including the state tax department, auditor, trustee and bondholder counsel if needed.
•Debate over whether security staff are commission employees or under sheriff payroll and how hiring/firing should be handled.
•Developer continues to assert erroneous tax tickets in recent quarterly filings.
•Local representative offered contact information for notifications and referrals.
•Owner Sam Pack said he is a disabled veteran and presented three dump tickets to show cleanup efforts.
•Proclamations cite definitions, national estimates and the role of multidisciplinary responses.
•Questions about mileage reimbursements for animal-control staff using personal vehicles.
•Sheriff and legal counsel explained operational distinctions between security duties and staging/prisoner processing.
•Staff confirmed levy language had been reviewed by the auditor's office.
•Thrasher/engineering to combine projects where feasible and to return with a specific budget for the Route 19 interchange bridge/crossing.
Decisions
•Commission approved budgeting $2,500,000 for rail-trail completion and directed staff and Thrasher to proceed as described.
•Commission approved motion to give owner 30 days to show cleanup progress; motion passed by voice vote with no opposition recorded.
•Commission approved vendor payments with specific items pulled for additional documentation; awarded aerial photography to Thrasher.
•Commission directed follow-up legal review and draft MOU circulation; no final delegation decision made.
•Motion carried to approve levy orders to be placed on May 12, 2026 ballot.
•Motion carried to send the letter and schedule the work session; staff to coordinate attendees and documentation.
•Proclamations adopted by voice vote with no opposition.
•Routine items approved by voice vote; administrative follow-up tasks assigned.
Directions
•Clerk to coordinate with elections staff for ballot placement.
•If progress is not evident, legal counsel will be instructed to pursue next steps as appropriate.
•Legal counsel to review levy call text for permitted uses.
•Procurement to execute contract with Thrasher and provide schedule.
•Staff (Charlotte) will re-inspect the property in 30 days and report back to the commission.
•Staff/legal to prepare stakeholder letter inviting parties to Feb. 4 work session and to request supporting documentation in advance.
•Staff to compile rail-trail security options (private security, deputy overtime, park-ranger statutory models) and return with recommendations.
•Staff to draft and circulate an MOU for comment at least three days before the Feb. 4 meeting.
•Staff to obtain documentation for flagged invoices and return with engineer report for McKinley.
•Staff to proceed with grant application and board roster updates.
•Staff to publish levy materials and work with Clerk for ballot procedures; finalize handbook review materials by Feb. 4.
•Staff to publish required notices and prepare ballot order materials.
•Staff to return recommended contract language and pricing for commission approval.
•Thrasher to produce the Route 19 cost estimate within a few weeks and seek to align new work with existing contracts.
Harrison County Commission opened its organizational meeting to elect leadership for 2026, confirm meeting times and hours, approve routine payroll and project requisitions, appoint a humane/animal control officer, consider a youth delegation funding request and approve several budget adjustments and hires, including Parks and Recreation staff.
Discussion Points
•Commission considered organizing calendar-year business for 2026, including leadership, meeting schedules and hours.
•Commissioner objected to approval without seeing requested parks plan and budget; staff said they had spoken with director and felt comfortable proceeding.
•Group is not a 501(c)(3), so routing through school board recommended.
•Kim Malayko described early work (inventories, calendars, program planning) intended to provide the requested information.
•Procurement irregularity for body-armor quote; approved conditional maximum to avoid delay.
•Rationale for larger professional-services line due to surveys, plumbing and building work.
•Request for $5,000 to support student travel and participation; program costs ~ $400 per student.
•Whether West Virginia code requires a deputy sheriff to be the humane officer; staff explained the sheriff can designate an animal-control officer by agreement.
Decisions
•Approved $3,000 county contribution routed through school board; requested school-board match.
•Approved $50,000 transfer from Extra Help to Professional Services; approved project requisitions and conditional body-armor purchase.
•Approved order appointing humane officer for 2026.
•Approved Parks & Rec hire; commissioners requested follow-up documentation.
•Elected Susan Thomas as president; elected David Henkel as president pro tem; approved meeting schedule and courthouse hours; adjusted Sept. 4 holiday closing to 11:00 a.m.
Directions
•Commission staff to coordinate funding through Harrison County School Board.
•Finance to update ledgers and departments to be notified; procurement to confirm vendor pricing.
•Parks director to produce and present plans and budgets in coming weeks.
•Staff to ensure compliance with state code as needed.