Lancing USD 469 board meeting: the board appointed an interim clerk, honored students and staff, reviewed district assessment results and curriculum pilots, advanced expansion of the Kansas Heartland Virtual Academy, approved multiple capital and operational bids, voted to purchase secured phone pouches and add a $30 cell‑phone fee with opt‑out, and adopted personnel and policy actions including a termination resolution and an interim principal appointment.
Discussion Points
•Administration recommended yonder pouches as least disruptive; board debated funding model and burden on families/staff.
•Administrators will continue to focus on attendance, CCR time, and targeted interventions for students at level one and two.
•Board asked administration to design opt‑out, waiver and implementation procedures.
•Board then considered internal transfer to fill principal vacancy and discussed effective dates and staffing continuity.
•District will pilot two structured‑literacy K–3 ELA programs for a full school year before adoption.
•FastBridge and state assessment data show improvements in several grades but declines in math in some cohorts; presenters stress interventions and PLLD alignment.
•KHVA enrollment far exceeded early expectations and required operational redesign.
•New state law requires devices be secured from bell to bell; several compliance options were considered (home/car, lockers, software, pouches).
•Staff recommended dedicated academic learning coach roles and org‑chart changes to maintain student supports.
The Lansing Board of Education voted 6–1 to approve a resolution to close the Lansing Early Childhood Center, prompting several parents to urge the board to delay or find alternatives. The board also approved the district QISA action plan, purchases for school safety badges and an iPad refresh, and heard a detailed special-education funding overview.
•Board members debated raising tuition, soliciting donations, or exploring partnerships (YMCA) before closing; some members said options were infeasible given building constraints and costs.
•Costs: $32,560 first-year package, recurring annual subscription approx. $21,000; badges replaced under subscription; approximate $8 charge for lost badges.
•Move to annual action-plan accreditation and focus on structured literacy EC–5 and standards alignment 6–12.
•Parents said they learned of closure late and described financial, childcare and employment impacts; administration cited $5,000,000 in facility repairs as the catalyst.
•Rationale: security updates, testing compatibility and management difficulties with mixed device generations.
•Special-education director reported December 1 count of 475 students (about 18%) and described funding complexity and rising service intensity.
•System design: single-button localized/campus alerts, Bluetooth receivers, battery maintenance and reunification module.
Decisions
•Board approved iPad refresh 7–0.
•Board approved QISA action plan 7–0.
•Board approved Raptor purchase and subscription.
•Board approved resolution to close the Early Childhood Center (6–1).
Directions
•Administration to confirm cross-building notification behavior for staff who move between buildings.
•Administration to implement attendance-center closure steps, relocate preschool program to elementary space, and continue YMCA negotiations.
•Administration to proceed with vendor implementation under next year’s safety/security budget and schedule training.
•Administration to provide details and timeline to board for affected families and staff.
•Administration to submit the action plan to KSDE and track implementation benchmarks; staff to engage community and legislators about funding needs.
•Explore buyback/liquidation of older devices to offset cost.
•Proceed with procurement; plan phased deployment starting with secondary.
The Lansing USD 469 Board of Education on a regular meeting directed the superintendent to pursue closing the district's early childhood center and approved a package of budget reductions and related motions; several other routine contracts and approvals also passed. Public commenters urged the board to protect child-care services and warned against using religious justification for policy.
Discussion Points
•Administration noted phased closure would delay savings by about two years and require continued building costs.
•Bus purchase intended to restore district capacity for activity trips after an accident reduced fleet.
•KASB membership supports professional development; one trustee objected to public funds used for an organization that lobbies.
•KSDE required clearer local documentation for special education processes; changes ensure compliance.
•Need to stabilize finances following failed bond; move $1.4M salaries funding lines; increase reserves to $4M; $30M in infrastructure needs cited.
•Public commenters warned legal and community impacts of closure; trustees discussed phased closure vs immediate action.
Decisions
•Board voted 5-1 to approve staffing reductions/transfers contingent on closure.
•Board voted 5-1 to direct superintendent to pursue closure effective July 1, 2026.
•Multiple administrative and procurement motions approved with recorded roll-call tallies: KASB membership and legal fund 5-1; bus bid 5-1; capacity and special-ed handbook 6-0.
Directions
•Process contract payments; post capacity table and handbook updates; finalize bus procurement paperwork.
•Superintendent to initiate closure process and prepare required legal/resolution steps; administration to prepare staffing reassignment and mitigation plans; return with detailed proposals and required public notifications.
Lansing USD 469 board met in regular session to recognize a student of the month, hear a community K's Club presentation, review finances and department reports, approve technology upgrades (a Wanrack fiber lease and switch replacement bids), adopt an AI use policy with implementation guidance to return in April, discuss next steps after a failed bond measure, and approve a principal contract extension.
Discussion Points
•Board entered executive session on personnel matters and returned to take formal action.
•Bond election failed by a significant margin; district cash carryover target ~ $4M; immediate capital needs include roofs, HVAC and boilers.
•District per‑pupil spending comparisons to state averages presented to assess efficiency.
•One board member voted no, citing lack of information.
•Policy committee recommended adopting KASB model IIB with implementation guidance tailored to district needs and bounding K‑5 access.
•Project economics: total $659,000; after rate match district share ~ $197,000; 14.5 year payback shown in staff analysis.
•Staff described filtering tools and logging (Securely, MagicSchool AI) and a DFIT trial for differentiation.
•Staff presented two procurement approaches: continue with Spectrum for internet access or lease dedicated fiber via Wanrack.
•Wanrack lease would provide a looped fiber route (redundancy) and ability to light more capacity later; Pine Cove chosen for enterprise switches after two bids.
Decisions
•Board agreed to further study, community engagement and targeted planning; no bond reauthorization motion taken.
•Board approved Pine Cove switch contract.
•Board authorized moving forward with Wanrack proposal contingent on state match.
•Contract extension approved by majority vote.
•Policy IIB adopted; implementation guidance to return for second reading in April.
Directions
•Bring final Wanrack contract back to board for final approval only if funding confirmed.
•Consider forming a focused task force and hold additional workshops and community outreach prior to any future bond proposal.
•District leadership to return revised implementation guidance to limit active instructional AI to middle and high school and codify citation/transparency standards.
•HR to finalize contract paperwork and onboarding.
•Staff to develop prioritized list of 'must do' capital repairs with time frames and cost estimates.
•Staff to file for state rate match and E‑rate special construction rule financing.
Lansing school board held its regular meeting with public comments urging a bond vote, presentations on winter student achievement data and interventions, discussion of updated KASB policy templates (AI policy excepted), financial projections and routine agenda votes.
Discussion Points
•Administration stated denial would be rare and require legal review.
•Board member proposed multiple detailed edits to policy templates.
•Board members requested follow-up and clarifications on adaptive tools and cohort tracking.
•Board recorded motions and roll-call votes for each action.
•Concern that opt-out language could be interpreted to allow denial of religious exemptions.
•January bank reconciliation baseline ($5.3M) explained.
•Presenters described CFAs, I Ready, Kite and PLC/MTSS alignment as central to improving in-year instruction.
•Projected negative balances in some funds will be corrected by transfers/reclassifications at year-end.
•Several routine approvals took place; the AI policy was removed from adoption for additional review.
•Staff reported algebra 1 freshman pass-rate improvement and variable winter results in early grades due to test changes.
Lansing USD 469 board met to organize officers and committees, hear public comment and a detailed presentation on a proposed two-question bond to address deferred maintenance and CTE expansion, review the 2025 audit, consider security and camera upgrades, debate student safety reporting and playground accessibility/grant matching, and take several personnel actions.
Discussion Points
•Alternative financing (ESCO) considered but viewed as partial and potentially operationally stressful.
•Committee membership volunteer process and roll-call voting method discussed.
•Community phone survey of 300 residents used to gauge tax tolerance (±5%).
•Grant deadline required immediate board approval to apply.
•Grants are reimbursement-based leading to timing-driven small negative fund balance.
•Legacy system compatibility issues with previous vendor work; need for integrator who can provide long-term support.
•Need for measurable metrics and semiannual reporting to provide the board with accurate data given underreporting concerns.
•Playground committee requested student and parent review of RFP responses; timing issues due to winter/installation season.
•Presentation of two-question bond: Question 1 (core facility needs, safety, CTE, early childhood); Question 2 (extracurricular facilities/turf) contingent on Q1.
•Recommendations to strengthen procurement policies and consider conflict-of-interest policy.
•Regulatory-basis audit opinion unmodified; GAAP opinion adverse (standard practice when waivers applied).
•Trade-offs between camera placement for asset coverage vs. personnel safety at the transportation building.
•Warranty terms (equipment 5 years, parts/labor 1 year) and start date at installation to be clarified.
•Whether board-issued 'directives' to staff in public session are procedurally/legal appropriate; superintendent recommended 'statement' language instead.
•Whether to defer leadership to more experienced returning members; nominations and withdrawals occurred in open floor.
•Whether to proceed now with a $100,000 allocation for playground equipment or bundle with March bond $1M playground allocation.
Decisions
•Amended motion to approve the statement failed 4–3 (abstain counted as no). Board requested continued staff implementation and reporting.
•Approve intercom upgrade with INA (7–0), camera upgrade with ADS ($32,822.79, 7–0), and transportation building project with ADS ($57,152.54, 5–2).
•Audit accepted as presented; no material federal single-audit findings.
•No vote taken to place a bond on the ballot at this meeting.
•Officers elected and committee rosters approved (individual votes recorded).
•RFP tabled; 50/50 grant match approved.
Directions
•Amend intercom motion to name INA as contractor; confirm quotes and warranty start dates at installation; proceed with ADS for camera and transportation projects as approved.
•Approve 50/50 grant match and allow staff to submit the application before the grant deadline.
•Clerk to publish committee rosters and email new lists to board members.
•Replace 'directive' with 'statement' where appropriate; superintendent advises caution with personnel directives in public forum.
•Staff to consider budget amendments when additional grant funding is received to avoid budget-to-actual overages.
•Staff to forward referenced studies and cost-modeling documents to board members.
•Staff to provide building-by-building breakdowns and schedule community outreach meetings (evening sessions).
•Staff to review procurement and bidding documentation and consider conflict-of-interest policy updates.
•Table RFP; committee to return in February with revised options and matching plan.
Board meeting in Lansing covered student recognitions, a lengthy discussion and board direction on student safety/reporting procedures, debate and a vote on a two-question bond resolution (30M + 5M) including a heated turf debate, approval of an MOU with Lansing Police, hiring actions, and a move to executive session.
Discussion Points
•Board discussed requirement for prior approval of investigative expenses exceeding $20,000.
•Board favored a draft plan from administration rather than immediate policy adoption.
•Members cited statutes requiring law‑enforcement reporting for conduct that would be a misdemeanor/felony for an adult; they requested legal clarification.
•Multiple board members and parents reported inconsistent referral entry and possible deletion in Skyward; suggested objective thresholds for referrals at schools.
•Public commenters and trustees raised fiscal responsibility concerns, citing capital outlay vs. bonding and survey turnout limitations.
•Some trustees recommended letting voters decide the optional athletic improvements.
•Transcript roll‑call entries recorded for multiple votes; some tallies partial in excerpt.
•Trustees debated injury research on turf, maintenance and heat issues versus field availability and fewer cancellations.
Decisions
•Board advanced the resolution and instructed counsel to proceed with preparatory steps.
•Board asked for a written draft plan at next meeting; did not adopt new policy today.
USD 469 Nov 17 2025 Special Board of Education Meeting
The Lansing school board received a presentation from Insight Design Studio and financial advice from Raymond James on a proposed bond package to address facility repairs and program expansions. The board directed staff to draft a resolution for a March bond election and voted to present a base package with a separate, contingent ballot question for athletic upgrades.
Discussion Points
•Board members emphasized the need for a long-term maintenance plan and asked for homeowner tax-impact examples for median and $400,000 homes.
•Board questioned potential dual use (alternative school) and the enrollment trend effects on early-childhood space needs.
•Board requested clear tax-impact examples and a maintenance plan before finalizing a bond scope.
•Consultants recommended separating athletic projects into their own question to avoid risking core renovation projects.
•IDS and staff described current condition of tennis courts and middle-school track and cost structure for turf installation and replacement.
•IDS described functional deficiencies of the early-childhood center and asked the board to consider replacement, renovation or a limited upgrade.
•IDS outlined three early childhood options: full renovation (~$18.6M), new building (~$15.3M), or limited upgrade (~$5.0M).
•IDS presented survey results showing highest project support for CTE expansion and moderate support for repurposing early childhood for behavioral supports.
•Presenters cautioned about unknowns in renovation (asbestos, structural), and logistics of housing students during construction.
•Raymond James presented financing scenarios: $30M (no mill-levy increase under assumptions) and $35M (modest mill-levy increase).
•Research was cited (systematic review) suggesting higher injury rates on artificial turf (58% higher overall injury risk cited).
Decisions
•Board approved a base bond package and a separate athletic-question contingency.
•Board approved directing Raymond James to draft the bond resolution for Dec. consideration.
•Board decided on a walk-in (in-person) election in March if the board adopts the resolution.
•Place athletics on a separate, contingent second ballot question (contingent on passage of the base package).
Directions
•District staff to prepare homeowner impact examples (e.g., $300k and $400k homes) and compare walk-in vs mail-ballot costs with the county clerk.
•District staff to research injury-safety literature cited by trustees and report findings to the board.
•If replacement is included in the base package, present options for site, scope and life-cycle costs.
•Include early-childhood options and tax-impact numbers in draft bond resolution materials for Dec. 8.
•Prepare ballot language that makes the athletics question contingent on the passage of the base package.
•Provide life-cycle cost comparisons for turf vs. natural-surface maintenance and replacement before final ballot language is drafted.
•Raymond James to draft a resolution and repayment scenarios for Dec. 8.
The Lansing USD board convened for a regular meeting featuring extended public comment from parents alleging unsafe conditions and poor communication at Lansing Elementary, a district presentation on new state assessment scoring, behavior interventions and a KinderBoost initiative, and a facilities report showing major roofing needs tied to a possible $30 million bond. The board scheduled a special meeting to discuss the bond and voted to move into an executive session to address student personnel matters after inviting several parents to attend privately. Multiple personnel hires and separations were approved and the board adopted an updated mandatory-reporting policy (GAAD).
Discussion Points
•Administration said the superintendent had previously promised to meet with building administrators about a reporting policy but parents contested lack of subsequent action.
•Board members discussed whether student matters should be addressed in executive session under personnel or student exemptions.
•District strategies: K–8 math alignment, use of IXL/iReady/FastBridge, PBIS/BIST, SBS rooms, expanded counseling, KinderBoost program for incoming kindergarteners.
•Estimated full replacement of all red areas approximately $15M; mixed replacement + overlays around $6M; wet insulation replacement estimates by building totaled tens to hundreds of thousands.
•Financing options include ESCO/escrow and bonds; administration noted estimated annual payments of $500k–$800k for a large roofing package and advised timing considerations for March bond window.
•Infrared testing identified wet insulation and areas that may need full replacement vs. overlay.
•New unified scoring scale (400–700) and KSDE performance-level descriptor changes; caution that scores are not comparable year to year.
•Parents reported alleged assaults, lack of timely response from principal and superintendent, and requested districtwide reporting procedures for assaults.
Decisions
•Board entered executive session to discuss non-elected personnel and invited parents to attend one at a time; hires and separations were approved in open session after the executive session.
•Special meeting scheduled for Nov. 17 to discuss bond options and to receive architect/finance input.
Directions
•Administration to continue semester monitoring of tiers, cohort tracking, and follow-up reports tying discipline and safety metrics to academic outcomes.
•Invite named parents into executive session individually to discuss personnel/student matters.
•Post roofing report online for public review.
•Prepare a district action plan addressing safety and reporting procedures to present at the December board meeting (requested by parents; board agreed to follow up).
•Prepare bond resolution and financing scenarios; host special workshop with architects and finance staff on Nov. 17.
•Administration noted procurement options (cooperative purchasing) and advised funds could come from capital carryover.
•Administration presented projected revenues and additional expenditures including Heartland Virtual Academy revenue, increases in insurance and wages, textbook adoption, and potential bus needs.
•Administration said the title has not been processed to shelves, the district uses review services and a formal reconsideration policy applies.
•Administrators confirmed they will follow policy and remove the title if it violates policy.
•Administrators had researched other districts and legal counsel had reviewed the draft, but several board members asked for additional legal confirmation and student input.
•Board and public raised compatibility, student-yield, and infrastructure concerns.
•Board discussed trauma-informed supports and logistics for public ceremonies.
•Board member raised concern about explicit passages in a titled book on the monthly bills list.
•Board members discussed optics, co-funding and whether to include more sites in a future bond.
•Board members pressed for a five-year facilities maintenance plan and for exact dollar impacts to homeowners.
•Developer explained costs, proposed lot sizes, and projected revenues; cited Lansing housing study.
•Developer said RHID would reimburse approx. $3M of $12M yet developer bears construction risk until reimbursement.
•Parent requested formal policy after being declined an honorary diploma; draft allows family choice of delivery method.
•Playground committee presented fundraising history, proposals and preferred equipment.
•Public comments urged both revenue-neutral and modestly higher taxes to fund urgent deferred maintenance.
Decisions
•Board approved the policy addendum allowing posthumous/honorary diplomas and asked staff to prepare implementation guidance.
•Board approved the procedural revenue-neutral resolution required to consider exceeding revenue neutral and proceeded with the budget process (see actions).
•Board authorized up to $100,000 from capital carryover for Lansing Elementary inclusive playground.
•No additional board action; administration will follow policy and report back if necessary.
•No board vote on RHID; matter to continue under intergovernmental review.
Directions
•Administration to continue fiscal review and coordinate with county and city planning staff.
•Administration to finalize procedures for trauma supports and ceremony logistics.
•Administration to finalize procurement, join cooperative purchasing if needed, and return a contract schedule.
•Administration to follow the districta
ormal review and reconsideration process; temporarily return the title to vendor pending review.
•Administration to highlight which deferred maintenance items could be funded within the proposed budget and which would require bond funds.
•Administration to solicit feedback from site councils and student leadership before finalizing details.
•Developer to share additional model-home examples and engineering plans with city and county.
•Facilities to schedule installation to minimize downtime and coordinate site review with school staff.
•Staff to return with line-item options to reduce spending and to show exact dollar changes to homeowner bills under multiple assessed-value scenarios.
•Board requested a wording clarification in the cardiac response plan and approved that amendment.
•Board requested that printed publications explicitly state parents' rights to medical and religious exemptions and include the relevant state statute reference.
•Board scheduled the statutory public hearing date; discussed state filing timelines.
•Calculations depend heavily on enrollment phasing, statewide assessed valuation per pupil, and what portion of taxes the RHID captures.
•Item 2.5 includes routine annual rescinding of orphaned handbook statements and review of immunization publicity materials.
•KSDE and AG guidance are not aligned; the district is operating in a period of unsettled state/federal direction.
•Observers warned additional students could create operating and facility pressures; state aid increases are limited to bond repayment formulas.
•Personnel motions were presented after executive session and passed in omnibus votes.
•Raymond James provided illustrative calculations showing possible revenue capture inside an RHID and potential state-aid increases for certain bond formulas.
•Whether to adopt a 2025 nondiscrimination statement now that includes gender identity and sexual orientation, or to submit the existing 2022 agreement to avoid immediate administrative burden and risk to federal funds.
Decisions
•Approved 2.5 as adjusted; one recorded no vote referencing a book purchase and concerns about matters that may need executive session.
•Approved public hearing date (Sept. 8); approved cardiac response plan with amendment; ratified negotiated agreement; approved personnel hires/transfers/exits; approved 3% raise for classified/admin staff.
•Approved the 2022 CNP agreement for submission.
•No formal action on RHID approval; board requested further analysis.
Directions
•District to share RSP Associates demography and development-pressure data with Raymond James for a follow-up analysis.
•Publish the Sept. 8 public hearing notice; update cardiac plan verbiage and file with state; implement negotiated agreement and apply classified/admin raises.
•Staff to add exemption language to publications and confirm use of health‑department form containing exemption language.
•Submit 2022 CNP agreement to KSDE by the deadline and update forms if and when CNW/USDA issues written directives.
•District loss ratios for multiple coverage lines were presented (property ~17%, general liability ~255%, auto ~294%, legal-defense/linebacker ~832%).
•EMC applied high roof deductibles (5% of building value) that could leave district with multimillion-dollar out-of-pocket costs on a major wind event.
•Estimated full-coverage roof work across the district cited at roughly $6 million (overlay) to $6$9 million in some board discussion; high school excepted.
•Financing alternatives discussed: bond referendum, escrow (energy-savings contract), lease-purchase, and the implications for capital outlay and deferred maintenance.
•KICKS/CRMIP offers lower member deductible ($150,000) but a higher premium (~$812,000) and a three-year membership obligation.
Decisions
•Board approved moving property and casualty insurance to KICKS (CRMIP).
Directions
•Staff to develop and present financing scenarios (bond vs. escrow/lease-purchase) including estimated interest and impact on capital outlay.
•Staff to identify line-item budget cuts to cover immediate premium increase.
•Staff to resend roofing assessment/cost estimates to board.
•Property/casualty insurance renewals showed a substantial premium increase and possible exposure on roof deductibles; staff requested a special meeting to finalize quotes.
•Revenue-neutral notice does not itself raise taxes but allows the district to consider exceeding the rate later.
•RSP study will inform capacity planning and possible future bond decisions.
•Trustees asked staff to check titles and suggest policy adjustments if needed.
•Use of SMART goals to set measurable targets.
•Workers' compensation renewal options were compared; KASB bid was recommended as cost-saving compared to incumbent renewal estimate.
Decisions
•Approve KASB workers' comp bid and schedule property/casualty insurance special meeting.
•Approve RSP agreement ($19,500).
•Approve school fees for 2025–26.
•No immediate removal beyond the motion to pull the named title pending review; action referred to staff for recommendation.
•Send county notice that the district may exceed revenue-neutral tax rate.
Directions
•Business office to prepare two budget scenarios for August/September.
•District will use PLC/CFA data to inform curriculum renewal and resource allocation.
•Special meeting scheduled June 20 at noon to review property/casualty insurance quotes before July 1.
•Staff to finalize RSP contract and begin study.
•Staff to return with a recommendation on removal/retention and any proposed policy changes at the next board meeting.
•Staff to review flagged titles and provide copies for trustees to inspect.
•Staff will continue to embed CFAs in the GBC and make assessments available to incoming staff.
•Board concerns about student-generation assumptions, developer profit disclosure, and post-RHID effects on taxation
•Fairlane Townhomes Phase 2 RHID presentation and site/cost constraints
•Riverbend Heights (Ad Astra) RHID presentation and Raymond James analysis of state aid impacts
Decisions
•No formal board approval of either RHID plan at this meeting; developers directed to provide additional data and the district to commission localized studies.
Directions
•Place a localized student-generation and capacity study on the June 9 agenda (RFP/RSP to be recommended)
•Request to have Raymond James run alternative scenarios (e.g., fewer out-of-district students; without a future bond)
•Addition ties to district priority on early intervention and literacy training for early grades.
•BIST is an early intervention, general‑education behavior program focusing on skill instruction, accountability and maximizing instructional time.
•Board agreed to return the matter next month for fuller review and public transparency.
•Board asked for measurable student‑level targets and regular progress reports.
•Board discussed the need for early intervention staff for students with limited vocabularies.
•Board emphasized meeting is informational; no commitments made.
•Board member argued four of 31 books contained sexual content, underage drinking, illicit drug references and graphic violence and believed purchases violated district policy and statute.
•District presented data (FastBridge and local tracking) showing declines in behavior incidents at participating schools.
•KISA plan emphasizes structured literacy (science of reading) for EC–5 and standards alignment and PLCs for 6–12; milestones set for teacher certification (LETRS/structured literacy).
•Monthly bills and certain library purchases prompted a public objection and a request for follow-up.
•Presenters said they would confirm details about which assessments teachers can modify and provide follow‑up.
•Several routine administrative and personnel items were approved with roll calls.
•Some trustees asked whether the city should attend; others preferred to hear developers first.
•Staff noted purchases came through Follett and invoices were on the protected side of packet.
•Staff secured multi‑year discounts and the ability to spread payments to reduce one‑year budget impact.
•The accreditation plan and developer workshop votes included follow‑up directions to staff.
•Trustees inquired about assessment customization (formative vs. summative).
•Trustees preferred an all‑board workshop so everyone hears developers directly.
Decisions
•Adoption approved; implementation to begin over summer.
•Board approved submission of the accreditation action plan and will receive progress updates; staff prioritized teacher certification before setting districtwide numeric student targets.
•Consent agenda approved as amended; matter of library purchases to be discussed next month.
•Formal approvals recorded; follow-up tasks assigned to departments.
•Position addition approved; staff to implement recruitment.
•Special work session approved by majority vote; details to be scheduled by staff.
Directions
•Consider inviting city officials depending on development details.
•Contracts to be finalized and returned as informational report.
•District to submit KISA one‑page summary to KSDE within the 60‑day window and to provide follow‑up detail to site councils and staff.
•Post position and begin recruitment.
•Return to board with hiring timeline and budget information.
•Staff to confirm assessment modification capabilities and to provide implementation timeline and training plan.
•Staff to prepare public list of titles, vendor invoices and an explanation of vetting/ordering procedures for next meeting.
•Staff to produce timeline for professional learning, and to map interim student‑level progress measures tied to FastBridge and state assessments.
•Staff to provide invoices/list of titles, finalize math contracts, submit KISA materials within 60 days, post early‑childhood position, and schedule developer workshop.
•Staff to set possible dates and circulate to board members; invite developers.