Board discussed student assessment data and interim growth measures (iReady, FastBridge), reviewed a middle-school bus transload plan, approved updated job descriptions and a playground relocation (cost cap $200,000), reviewed budget comparisons including $341,234.52 bond interest, and recessed into two executive sessions under the Kansas Open Meetings Act.
Discussion Points
•Bond interest and bond-related sheets being finalized
•Chair indicated no further discussion
•City coordination for traffic flow near Eisenhower and new middle school
•Detailed transload plan presented with bus windows and staffing
•Invoices beginning to arrive for fire alarms (~$180,000) and iCon bills (~$35,000)
•Motion read for playground relocation with $200,000 cap
•Motions cited Kansas Open Meetings Act exemptions and specified participants
•Proposal to create a monthly rotation of meaningful data for board review
•Public session recessed to allow closed deliberations
•Requests for signage, painted curbs and temporary enforcement
•Request to pair interim assessments with state assessment results
•Special education costs shown 14% higher due to payment timing
•Superintendent had been tasked to return updated job descriptions
Decisions
•Board entered executive sessions as stated
•Job descriptions approved (transcript recorded tally)
•Motion approved per transcript
Directions
•Staff to finalize and file documents
•Staff to install signage/paint by end of week and communicate changes to families; staff to request patrol/SRO presence for early enforcement
•Staff to manage relocation within approved cap and report invoices to board
•Staff to monitor invoices and report routine updates to the board
•Staff to present June state assessment package and provide growth-monitoring metrics
Participants discussed plans to create an outdoor classroom and event space behind a building, including drainage and flooding fixes, and flagged a $100,000 allocation approved last month that needs paperwork and compliance review. The chair announced a return to executive session for further discussion.
Discussion Points
•Committee member requested staff access to documents to check signatures and compliance.
•Participants asked for better documentation and communications before advancing the project.
•Plans to convert rear area into outdoor classroom and event space; drainage and flooding fixes needed.
•Reference that $100,000 had been approved previously and that paperwork needs review.
Decisions
•No formal decision recorded in the provided transcript; Chair announced return to executive session.
•No new vote recorded; matter set for further discussion in executive session.
Directions
•Staff or responsible parties to gather paperwork and review compliance (implied request).
•Staff tasked (implied) to obtain and review the paperwork.
McPherson USD board meeting covering major facility project design updates for the middle and high schools, a proposed fast-track pre-cast schedule for the new CTE building, approval of summer elementary improvement contracts, and a three-year industry partnership (SME PRIME).
Discussion Points
•ICON Structures TIPS contract for elementary summer projects proposed and approved (amount not to exceed $170,800).
•Internal cost estimate ~10% over budget; CM to produce refined estimates and options.
•Proposal to procure pre‑cast panels and roof steel early to secure production slot for CTE building; target procurement in July after CM onboarding.
•Schematic design for middle and high school complete; move into design development through August (presenter Mr. Cash).
•SME PRIME includes an industry‑held sustainability fund and potential shared endowment applications; curriculum alignment with MCC and local pathways must be done in the 2026‑27 year.
•SME PRIME three‑year partnership agreed; sustainability fund discussed; launch targeted for fall 2027.
•Whether temporary office work should be paid from bond funds vs capital outlay (administration to clarify).
Decisions
•Accept updated job description draft and accept handbooks as draft for later approval.
•Approve ICON Structures proposals up to $170,800; approve SME PRIME agreement.
•Approve ICON Structures TIPS contract for elementary summer projects not to exceed $170,800.
•Approve SME PRIME partnership agreement as presented.
Directions
•Administration to coordinate SME PRIME grant tracking and identify training calendar for 2027.
•Administration to provide a list of non‑negotiable elements for the project and prioritized trade‑off options if costs exceed targets.
•Administration to provide clear funding allocations for summer projects and coordinate grant tracking for SME PRIME.
•CTE staff and finance to plan teacher training and consumable/spare parts budgets for SME PRIME program.
•Facility committee to interview and recommend construction manager; board to consider hiring CM at June 29 meeting.
•Finance/staff to clarify whether selected summer projects will be paid from bond funds or capital and report back.
The McPherson Unified School District board met in a hybrid session to approve a bond resolution, adopt a state-required student cellphone policy, move toward a four-tier employee health plan, and review major design and schedule updates for high school, middle school and CTE projects.
Discussion Points
•Deductibles increased by $500; coinsurance shifts and plan design elements changed.
•Finalized interest rate 4.8% for 30-year bond; estimated $3M investment earnings; expected closing May 28.
•Initial insurer proposal above 15%; negotiations lowered renewal to ~6.5% across pool.
•Projected district savings from a four-tier transition were discussed but depend on employee redistribution across tiers.
•RFQ issued May 8; responses due May 29; shortlisting June 3; interviews week of June 22; board approval around June 29. Team recommends building a new CTE building on a different pad to avoid flooding and minimize interim moves.
•Statute requires bell-to-bell prohibition; exceptions limited to documented medical needs; storage and enforcement require local procedures.
•Students and parents expressed privacy and contact concerns; lockers, parent contact protocols and accommodations for medical needs must be addressed.
Decisions
•Board accepted updated project schedule and directed staff to continue CMR procurement and design work.
•Board adopted policy JCDC and directed staff to return with implementation details.
•Board approved moving to a four-tier plan design.
•Board approved the bond resolution to authorize issuance and related actions.
Directions
•Proceed with RFQ/RFP procurement schedule; perform soil borings week of May 18; bring CM input once procured.
•Staff to prepare handbook language, implementation procedures, and parent outreach for board review prior to start of 2026–27 school year.
•Staff to provide employee counts by coverage type and propose mitigation options for employees on family plans.
USD 418 Board of Education - Regular Meeting - April 13, 2026
McPherson USD 418 board meeting covered authorization to offer $89.5 million in general-obligation bonds, detailed bond financing terms and lease payoffs, professional learning community (PLC) presentations on curriculum and data tracking, a new state cell-phone policy overview, and approval of elementary transition logistics and several calendar and personnel items.
Discussion Points
•A district data tracker aggregates formative-assessment results across elementary schools to flag standards needing reteaching.
•Administrator contracts were approved following executive-session personnel discussion.
•Board members asked about enforcement mechanics, liability protections and communication to families.
•Board members questioned trustee function and market timing; staff described flexibility to lock rates under parameters authorized by the board.
•Board members raised concerns about childcare for families and the need for timely parent communication.
•Calendar committee described trade-offs for holiday timing and teacher workdays; board encouraged earlier calendar planning next year.
•Elementary principals requested converting the May 15 half day to a full workday for staff to pack and prepare classrooms during consolidation.
•Finance presenter explained premium use, investment earnings during construction, lease/bond early payoffs and amortization schedules.
•MCC recommended course-credit changes and middle school advanced math tracks; committee vetting and enrollment thresholds discussed.
•Reorganized PLC drives and unit-plan templates give teachers access to common materials and pacing guides.
•The draft makes personal electronic devices prohibited throughout the school day, with narrow exceptions for IEP/504 needs or medical monitoring.
Decisions
•Board adopted a resolution authorizing offering the Series 2026 bonds; staff will proceed with market preparations.
•Board approved MCC recommendations, the proposed 2026–27 calendar and administrator contracts; routine items were approved as presented.
•Board approved the calendar adjustment to make May 14 the final elementary attendance day; the motion carried as recorded in the meeting.
•No board action required; board received the informational presentation.
•No final action; board reviewed draft and directed staff to continue developing enforcement procedures.
Directions
•Administration to refine policy language, consult legal counsel on enforcement and liability, and return with a recommended final policy and communication plan ahead of state certification.
•Administration will coordinate communication to families and finalize logistics with elementary principals and classified staff.
•Calendar committee to start earlier next year and bring options sooner for board review.
•Continue refining trackers and accountability forms; provide summer supports to integrate tools into teacher practice.
•Curriculum office to update catalogs and schedule options if enrollment thresholds met.
•Staff to pursue rating call and distribute final sale materials to the rating agency; staff to return with final bond terms for board approval.
•Staff to work with facilities and movers to stage moves and ensure checkout/sign-off processes for teachers.
USD 418 Board of Education - Regular Meeting - March 9, 2026
McPherson USD board meeting where parents and instructors urged the board not to cut the middle-school orchestra as administrators outlined budget savings; the board approved a two-year exploratory join with the McPherson County CAPS program, heard bond/construction timelines, and adopted new elementary attendance boundaries for 2026–27.
Discussion Points
•Administration confirmed program locations (life‑skills to Washington; pre‑K at Lincoln) and said numbers were factored into capacity calculations.
•Administration said the orchestra is included in preliminary savings estimates but no recommendation has been made.
•After returning to open session the board accepted the superintendent's resignation; no further details were released in open session.
•Board entered multiple executive sessions for personnel and negotiations under the Kansas Open Meetings Act.
•Board inquired about future staffing and cost if implementation follows.
•Board requested detailed enrollment, staffing and student interest data before making a decision.
•Bond funds expected to be sold early June with proceeds invested to support construction.
•CAPS exploratory phase is two years and nonbinding; foundation to fund travel and investigation.
•Design team is conducting visioning, LIDAR scanning and schematic design with touch points in April and May.
•District processes over 1,046 students for meal assistance and has ongoing staffing challenges.
•High‑school construction could require phased work and CMAR input to refine schedule and costs.
•Minor documentation changes and staff categorization updates were required; no fiscal findings.
•One district liaison commitment expected; student participation during years 1–2 is unlikely.
•Option 1 favored by public survey and admin for minimizing disruption and balancing capacity.
•Parents and instructors argued the orchestra is crucial to student development and could affect enrollment and future music study.
•State audit reviewed production records, special‑diet substitutions and procurement documentation.
•Trustees raised issues about grandfathering for rural Eisenhower families, fifth graders and siblings, plus busing and SPED placement.
Decisions
•Adopt Option 1 as the recommended elementary attendance boundary plan for 2026–27 (6–1).
•Board approved MOU to participate in two‑year CAPS study (7–0).
•Resignation accepted; board to conduct further transition work in closed session.
Directions
•Administration to collect student interest and staffing scenarios and return with a concrete analysis in April.
•Administration to finalize and publish grandfathering rules, communicate boundaries to families before kindergarten roundup, and process transfer requests earlier as needed.
•Administration to formalize MOU and identify liaison(s).
•Board and administration will manage transition steps and communicate to the community through normal administrative channels.
•Facility committee to review CMAR timing and procurement steps; administration to share finance and schedule details at April meeting.
•Food service director to provide further budget detail on cash‑balance changes when requested by trustees.
•Provide further detail on scope and timeline at next board meeting.
Presentation: local economic-development group and the SME Education Foundation pitched the PRIME manufacturing-education program for McPherson USD 418; superintendent warned of special-education funding shortfalls at the state level; the board ratified a negotiated agreement and entered executive sessions.
Discussion Points
•Board clarified who would attend executive sessions and noted no immediate public action would be expected from them.
•Board discussed the need for further information before approving major program/service changes and the food service audit.
•Governor proposed $50.6M increase to special education funding; House K‑12 recommended $10M; statutory target cited near 92% of excess cost.
•Presenters described PRIME program structure, deliverables, and funding model; board raised questions about facilities, staffing, Perkins alignment, and maintenance.
•Superintendent emphasized local general fund covers shortfalls, which reduces capacity for new programs and compensation.
Training by a Kansas Association of School Boards attorney reviewed Open Meetings/Open Records rules, executive session requirements, social media guidance and limits on using district resources ahead of a planned bond election; the agenda was approved 7-0.
Discussion Points
•Executive session motion language and minute requirements
•Limits on use of district funds for advocacy around bonds
•Open Meetings Act elements (interactive communication, majority of membership, school business)
•Quorum and voting procedures; abstentions counted as no votes in practice
•Serial meetings risk from emails/social media
•Social media risks and separation of personal vs official accounts
Decisions
•Agenda approved 7-0
Directions
•Administration to receive and distribute KASB materials (presenter offered to share slides with Superintendent Doctor Vincent)
•Follow up on committee membership and notice procedures as needed
Regular Board Meeting - January 12, 2026 at 6:00PM
McPherson Board of Education held a regular meeting featuring approval of the agenda, acceptance of a $6,950 Booster Club donation, updates on a bond-backed flood mitigation project for the roundhouse, kickoff of an elementary boundary review with consultant RFP and Associates, and a high-school-led book study on cell-phone policy that referenced pending state legislation.
Discussion Points
•Board members raised questions about implementation logistics for bell‑to‑bell rules, off‑campus juniors/seniors, and staff communications (e.g., Remind, team apps).
•Board members raised safety and ADA access concerns and asked for clearer public communication and visuals.
•Consultants described community open‑house style input plus an online survey (Social Pinpoint) and translation options.
•Dr. Herbst summarized research linking device access to decreased attention, increased anxiety and classroom disruption and outlined restorative disciplinary practices used at the high school.
•RFP presented nine boundary criteria, enrollment projections, and utilization targets; board members asked about pre‑K inclusion and the K‑4 vs K‑5 projection method.
•Superintendent described temporary repairs (pumps, temporary flood wall) and that the bond would fund a permanent elevation fix.
Decisions
•Board accepted the Booster Club donation; no formal vote on bond measures recorded at this meeting.
•No formal district‑wide policy adopted at this meeting; administration will continue planning and await possible legislative action.
•Board to include related supports and behavior discussion in a February work session.
•Staff and consultants to update enrollment numbers to reflect current pre‑K–5 totals and to prepare materials and maps for the scheduled community meetings.
•Staff to continue stakeholder engagement, refine logistics (storage, lockers, containers), and coordinate communications planning with the district communications team.
•Staff to provide documentation/photographs and further details for public communication about mitigation work.
The Board of Education convened, approved the agenda unanimously, and voted to enter executive session to discuss the superintendent's evaluation under the Kansas Open Meetings Act; the meeting resumed after the executive session and was adjourned. Next regular meeting scheduled for next Monday.
Discussion Points
•Approval of the meeting agenda by voice vote.
•Initial proposal for a 30‑minute executive session, followed by an agreed reduction to 15 minutes.
•Pledge of Allegiance and logistical opening remarks.
•Proposal to enter executive session for superintendent evaluation under the Kansas Open Meetings Act.
Decisions
•Agenda approved unanimously; meeting adjourned after executive session.
•Board agreed to shorten the executive session to 15 minutes.
•Motion to enter executive session approved by voice vote (6‑0).
Directions
•Board to meet in executive session with the superintendent present; reconvene in the boardroom when the time elapsed.
Regular Board Meeting - December 15, 2025 at 6:00PM
Eligible civic meeting: McPherson school board held a regular meeting that included approval of routine items and donations, an auditor presentation and approval of the audit report, scheduling a special meeting for negotiations, a vote to proceed with an RSP boundary study (excluding an optional $13,500 enrollment study), and acceptance of a three-year SDAC consortium membership (one abstention).
Discussion Points
•Auditor explained GAAP waiver language and management responsibilities.
•Board discussed logistics and options for a special meeting for negotiations.
•Board emphasized community access—preferred at least one evening meeting and one daytime option.
•Board recognized staff assistance during audit.
•Board weighed whether to purchase updated enrollment work ($13,500) or rely on recent data from prior study.
•Presenter described SDAC membership and rationale for a multiyear commitment.
•Presenter proposed RSP-assisted boundary process including demographer, admin meetings and community nights; estimated costs varied depending on updated enrollment input.
Decisions
•Approve audit report; schedule a special meeting for negotiations; accept three-year SDAC membership (one abstention).
•Approve RSP boundary contract excluding the $13,500 enrollment study (motion passed).
Directions
•Administration to handle logistics for executive sessions and follow-up on audit recommendations if any.
•Admin to schedule community meetings to maximize accessibility (consider daytime and later evening options).
•Place special meeting on calendars and public notices; administration to return with finalized insurance agreement in January.
•Proceed with RSP contract excluding the optional $13,500 enrollment study; keep shorter timeline and two community meetings; administration to finalize dates and contract.
USD 418 Board of Education - Special Meeting - December 8, 2025 at 6:00PM
The McPherson Unified School District board approved a long-range facility plan, set a March bond election with two ballot questions, and voted to transition from four to three elementary schools, designating Eisenhower Elementary to be reconfigured as a future middle school.
Discussion Points
•Board debated which elementary to close; financial data suggested Lincoln but Eisenhower was chosen for transition due to long-term district considerations.
•Board members discussed contingency language for two ballot questions and logistics of holding a March special election.
•Consultant reported 550 completed surveys and recommended communication strategies to reduce the 'I don't know' response group.
•Consultants presented three bond/package options (no-tax-increase smaller package; larger bond options with tax increases) and preliminary cost ranges.
•ThoughtExchange produced 701 thoughts from 832 participants; top themes were safety, educational quality, transparency, facility condition, and finances.
Decisions
•Adopted long-range facility plan (7–0).
•Adopted resolution calling a bond election for March with two ballot questions (roll call, all yes).
•Approved transition from four to three elementary schools; Eisenhower designated for transition (5 yes, 1 no, 1 abstain).
•Authorized executive session for teacher contract negotiations under the Kansas Open Meetings Act.
Directions
•Consultants to provide follow-up materials and targeted messaging for the community and staff to reduce uncertainty and build trust.
•District administration to prepare transition plan for Eisenhower and a communications strategy to build community support.
•Staff to submit bond documentation to the State Board of Education and provide the cost estimate for a March special election at the next meeting.
USD 418 Board of Education - Special Meeting - December 1, 2025 at 6:00PM
Special school board meeting focused on a proposed long-range facilities plan and bond structure, including debate over repurposing Eisenhower Elementary as a middle school, a two-question bond approach, and a district savings target. Board members heard consultant and superintendent input, discussed survey results and redistricting impacts, and voted to set a $1.75M savings target while tabling final action on repurposing.
Discussion Points
•Need for contingency options if the second ballot question fails and how to reassign programs and transportation.
•Operational impacts of repurposing schools, redistricting, and transportation logistics.
•Questions about classroom inventories and whether secure entrances reduce usable classroom counts.
•Survey data indicate price sensitivity; messaging must tie specific elements to community priorities.
•Whether Eisenhower should be the repurposed middle‑school site and the operational impacts of closing/repurposing.
•Whether to split the long‑range facilities plan into two ballot questions to increase passage odds.
Decisions
•Board tabled final identification of a specific school (voice vote reported as 6–1) pending additional information.
•No final decision on ballot language or school repurposing; staff to return with further data.
•Set district savings target of $1,750,000 (approved 7–0).
Directions
•Bring pros/cons analysis and high‑level transportation impact estimates to Dec. 8 work session.
•Staff to prepare concise tie‑ins between each ballot question and community feedback, updated classroom and capacity counts by elementary, and a contingency plan if a question fails.
•Staff to provide draft ballot language and legal timeline for Dec. 8 review; informational campaign planning to follow.
•Staff to return with classroom‑by‑school capacity figures and redistricting scenarios, a contingency plan for Eisenhower if Question 2 fails, and concise mapping of ballot questions to community survey findings.
USD 418 Board of Education - Special Meeting - November 25, 2025 at 6:00PM
McPherson Public Schools board heard a presentation of a revised long-range facility plan that outlines an $89.5 million package and two ballot questions: a $62.5 million no-levy-increase ask for a new high school (Question 1) and a $27.9 million ask for a new middle school and safety upgrades (Question 2). Administrators also reviewed phone-survey results showing stronger support for smaller/no-tax options, and discussed a target of $1.75 million in operational savings that could require staff reductions and a transition from four elementary schools to three.
Discussion Points
•Consider consolidation from four elementary schools to three
•Long-range facility plan goals: safety, efficiency, modern learning spaces
•Survey indicates strongest immediate support for a smaller/no-tax option
•Tax impact examples and communication strategy (annual costs recommended)
•Two‑question bond structure (Question 1: $62.5M no-levy; Question 2: $27.9M with 4.75 mills)
Decisions
•Approved meeting agenda (6–0). No bond questions or closures were decided at this meeting.
Directions
•Administrators to return Dec. 1 with refined project cost breakdowns, pros/cons for elementary building options, and staffing impact scenarios
•Continue community engagement via digital 'thought exchange' and publish survey results to the public
•Community engagement produced ~160 survey responses (52 students, 41 parents, 46 community members, 21 staff).
•Community priorities cited: student learning experience (≈67% selected), fiscal responsibility, safety and security, teacher support and retention, and community identity.
•Three principal facility options were presented: Option 1 — new high school on a new site; Option 2 — renovate and renew existing high school (convert Eisenhower Middle School as needed); Option 3 — phased $50M–$65M approach (phase 1).
•Trustees emphasized the need for clear, itemized descriptions of what bond proceeds would fund (e.g., storm shelters, secure entries, square footage replaced).
•Trustees requested property-price research for Option 1 and clarified that purchasing land does not commit the district to building immediately.
•When dollar amounts were shown, renovate-and-renew (Option 2) gained preference; students and parents were more supportive of a new site than other groups.
Decisions
•Board consensus expressed preference to advance Option 2 work as the baseline for refinement; no final bond or ballot decision was made during the session.
•Schedule two special work sessions: Nov. 25 at 6 p.m. and Dec. 1 at 6 p.m.
Directions
•Identify available properties that could serve as a future new high-school site and provide price/availability estimates to the board.
•Prepare renderings and community-facing materials that clearly state what a bond would fund and the expected mill-levy impact ranges.
•Provide raw telephone-survey data and share the survey instrument and methodology; confirm whether calls are recorded.
•Refine Option 2 into a baseline concept with a higher-fidelity cost model and contingencies and return to the board at the Nov. 25 special work session.
•Board debate over whether to set a financial cap (example figure $50 million) prior to public input
•Detention-pond storage to increase from ~16,000 cu ft to ~40,000 cu ft (~150% increase)
•Importance of avoiding leading questions in polling to capture honest public input
•June 1718 storms flooded the Roundhouse; engineers recommended detention-pond expansion and drainage line replacement
•Overview of Senate Bill 13 (2021) and revenue-neutral hearing requirements
•Public-notice and publication steps (budget notice published Aug. 27)
•Pumps: three installed; one was nonfunctional and two were operating; pipe near weld shop had sediment and settlement issues reducing effective capacity
•Staff will present building report cards at community meetings
•Statutory levy rules including 20-mill general-fund levy and previously voter-approved capital outlay and LOB authorities
Decisions
•Adopt 2025-26 budget and Resolution 2025-12 LOB percentage (5-0)
•Adopt Resolution 2025-11 to exceed the revenue-neutral rate (5-0)
•Authorize administration to investigate Kingdom Courts temporary floor solution (approved)
•No board decision to set a dollar cap; board will review community feedback and consider guiding principles at a future meeting
•Proceed with detention-pond enhancements and bidding process (approved)
•Proceed with gym-floor replacement contract with clause to allow coordination for temporary option (approved)
Directions
•Administration to contact Kingdom Courts and return with feasibility study and logistics/costs
•Business office to finalize budget and submit required documents to KSDE and county clerk by statutory deadlines
•Compile raw table notes and poll results and return a synthesized report to the board for prioritization
•Hold three committee meetings and one districtwide session; collect open-ended input at tables and via polling as appropriate
•Issue bid documents for detention-pond expansion including requirement that contractor provide temporary flood mitigation
•Proceed with Langford Enterprise for floor replacement but allow contractor/admin coordination to delay installation if temporary option is viable
USD 418 Board of Education - Special Board Meeting - September 8, 2025
Discussion Points
•Board debated risk of installing a new gym floor before permanent flood mitigation is in place versus the operational impact of leaving spaces unusable.
•Board discussed short-term deployable barriers (flexible tube or modular barrier systems) as possible interim protection while pond project is permitted and constructed.
•Civil engineer recommended enlarging detention pond and relocating the pump/outlet; noted that the existing flap-gate outlet can be ineffective when regional floodplain level exceeds pond elevation.
•Consultants presented district facility grades, deferred-maintenance estimates and enrollment forecasts; attendees discussed building-by-building needs and educational programming impacts.
Decisions
•No final capital appropriation for Roundhouse gym floor or full-long-term mitigation at this meeting; matter tabled pending additional cost/timeline detail.
Directions
•Administration to schedule community engagement sessions and special board meetings already set for Sept. 25 and Dec. 8.
•Consultants to return with phased project buckets tied to facility grade improvements and estimated cost-to-move-grade.
•Kaw Valley Engineering to finalize construction documents for pond enlargement and provide bid-ready plans; staff to obtain vendor quotes for temporary barrier options.