The Grant County Election Board accepted four returned ballots for the 2026 general election, discussed an ongoing review of reports about possible school referendum ballot errors, and recessed without certifying the election while awaiting possible additional ballots.
Discussion Points
•A staff member said machine tally and poll-pad figures and a spreadsheet had a 3 p.m. Friday posting deadline.
•The board discussed four additional mismatched ballots that had not been returned and were expected by the stated deadline.
•The certification deadline was identified by the chairman as Monday.
•The chairman reported anecdotal third-party concerns about possible incorrect ballots related to school referenda.
•The chairman said the board had no evidence confirming incorrect ballots and was continuing its review.
•The chairman said the board might seek outside assistance and intended to release findings publicly.
•The chairman said the materials had been circulated by email and that members' signatures would reflect approval.
•Up to four additional ballots could arrive by noon.
Decisions
•The board approved the four returned ballots and said they would be processed and added to final tabulations.
•The board recessed without taking a final certification vote and announced a conditional reconvening plan.
Directions
•A staff member requested copies of election-day and early-voting materials for posting.
•Nancy Bryant was instructed to notify the board if additional ballots arrived by noon.
•The chairman said notice of any reconvening time would be posted at courthouse locations.
The Grant County Board of Zoning Appeals on Nov. 2, 2026 approved a special exception and variance for Indiana Michigan Power to replace a 180‑foot communications tower with a 430‑foot P25 radio tower, granted a setback variance for a Fairmount homeowner who started construction without a permit, and heard a permitting report showing a record number of permits this year.
Discussion Points
•Applicant admitted to starting construction before a permit; contractor North Edge Steel identified.
•Board asked for measurements to nearest homes and documentation for inspections; applicant agreed to provide measurements by email.
•Board debated scope and whether additional help would be needed if the matter moves toward trial.
•Board discussed enforcement options including fines and contractor registration.
•Board members praised the permitting staff and had no follow‑up questions.
•Engineers described inspection schedule and ANSI/TIA‑222 design standards for the proposed tower (Rob Franciscus).
•I&M said existing 180‑foot tower no longer meets coverage needs for P25 network and emergency operations (Daniel Waldmerian).
•Motion to investigate unclear paperwork presented after executive session (Wilbur Webb).
•Public commenter cited county ordinance 150.999 regarding daily fines for noncompliance.
•Tammy Holloway presented permit totals and compared them to historical years.
Decisions
•Amendment to include investigation of fines and official notice passed; underlying motion to pursue discovery and investigation also passed.
•Motion to approve variance and special exception passed; applicant to comply with permitting and documentation requirements.
•Variance granted with conditions that fines be addressed and permit/inspections be completed.
Directions
•Applicant to provide distance measurements to neighboring homes and submit inspection documentation to the clerk and permitting staff before final permit issuance.
•Counsel and staff to gather documents, investigate fines and official notice requirements, and report back to the board.
•Owner to pay fines as required and register contractor; building inspector to inspect anchors/foundation as part of permit process.
The Grant County Board of Commissioners held a regular session covering routine consent items, IT and highway updates, public testimony and a tabled request to transfer county land to the 18 12 festival organizers, adoption of a fee ordinance and two one-year moratoriums (data centers and standalone battery energy storage), notice of an opioid settlement, a sheriff's grant application, and a county benefits update for 2027.
Discussion Points
•18 12 seeks 32 acres for private access drive and to qualify for grants; reported 32,000 visitors and $900,000 impact
•APC held a public hearing and forwarded the recommendation
•APC proposed moratoriums for data centers and BESS to allow time to study impacts and draft regulations
•Commissioners asked clarifying questions about costs
•Commissioners thanked Cassie for pursuing grants
•Contract must be in place within three months to secure funds
•Four dump trucks arriving with beds and snow plows
•Grant awarded $537,049.32 for 14th Street project
•Grant would fund two Tahoes and 12 desktops for detectives
•Marcus identified two unused AT&T lines and a proposed internet upgrade to 1 Gbps
•Marcus reported no cancellation fees for unused accounts and said upgrades add IP space and speed
•Ordinance aligns fees to county costs, requires dedicated fund (1240), and limits increases to every five years tied to CPI
•Prescription drug costs rose from about $851,000 (Jan-Aug 2023) to nearly $1,500,000 in the same period this year
•Proposed Albertsons opioid settlement presented; no monetary details available
•Residents objected to giving away county property and asked about appraised value and floodplain; county council expressed concern about transparency
•RxBenefits/CVS may provide stronger rebates and co-pay assistance that produced an estimated $400,000 repricing savings
•Staff cited electrical demand, utility infrastructure, fire and emergency response, decommissioning and compatibility as concerns
•Staff suggested a ~4% premium-equivalent increase for 2027 and raised stop-loss renewal timing concerns
Decisions
•Board approved application submission
•Board approved removal of unused lines and internet upgrade by voice vote
•Both moratoriums adopted by voice vote
•Item tabled
•Ordinance amendment adopted
Directions
•Chair to table the item and schedule future public discussion with additional documentation
•Highway staff to pursue contract and coordinate delivery logistics
•Marcus to coordinate order with AT&T and county finance
•Sheriff's office to submit application
•Staff to continue legal review and subcommittee work; return with draft ordinance language
•Staff to follow up with allocation details when available
•Staff to publish required public notice and await statutory delay
•Staff to seek extension of stop-loss quote and return with further detail
Council meeting in Grant County where the county council held an impromptu public hearing and voted 6-0 to send an email to county commissioners opposing a proposed transfer/giveaway of roughly 60 acres of county land to the nonprofit referenced as "18 12."
Discussion Points
•Council estimated potential value using illustrative per-acre figure and suggested sale proceeds could fund purchases such as vehicles.
•Highway department uses part of the property for dumping and storage; a permanent conveyance could remove that functional space.
•Motion to notify commissioners and include public input.
•Multiple members and residents urged transparency, lease or revenue-sharing alternatives, and warned of loss of a highway department dumping site.
•Open Door Law requires public comment on readings affecting taxpayers; executive session cannot be used to make final decisions without public hearings.
•Public commenters supported 18 12's mission but opposed permanent land giveaways and called for alternatives like lease or revenue-sharing.
•Surveyor observed on county-owned land west of Garthwaite Road; Council lacks details about potential transfer to '18 12' and is concerned about loss of asset and public input.
•Voice vote recorded 6-0 in favor.
Decisions
•Motion approved 6-0.
•Motion to send email to commissioners approved 6-0.
Directions
•Citizens may file complaints with the Public Access Counselor if they believe the Open Door Law was violated.
•Council office to compile and send comments before Monday's commissioners' meeting.
•Council suggested potential legal options (injunction, complaint to Public Access Counselor) if transfer occurs without proper process.
•Council to send an email to county commissioners reporting public comments and expressing opposition prior to the Monday meeting at 1:30 p.m.
Public hearing and board actions focused on drainage assessments for Carr (Cart) Creek and other ditches; board approved claims and set assessment rates for Carr Creek (Number 664) after public comment; survey-mapping delays and categorization for Back Creek were discussed.
Discussion Points
•Board debated homesite fee and overlapping charges for properties on tile and open ditch
•Board discussed that several jobs exceeded the $4,000 emergency spending threshold
•Board requested estimates and a specific job scope to get quotes
•Concerns about administrative complexity and fairness for small businesses and trailer courts
•Mapping accuracy and mailing deadlines constrain hearing timing
•Members recommended a brief phone-call notification and email when jobs exceed the threshold
•Motion to pursue and get estimate failed for lack of support
•Petitioner requested Pike Creek maintenance and staff was asked to pursue it
•Public commenter Nolan Holloway requested a lower open-ditch rate citing an existing $62.50 tile assessment
•Some legal descriptions are harder to transcribe and require a detailed scope for estimates
•Some members indicated work should start with problem stretches and a cost estimate is needed
•Staff presented parcel counts and a proposed rate schedule for Carr Creek No. 664
•Staff read claims and fund balances for multiple vendors and ditch funds
•Surveying firms (Ashton, Muncie, Bunnell, Woodmansey, Commonwealth) are busy and availability varies
•Whether to classify properties by acreage, homesite, commercial status or hard surface for Back Creek assessments
Grant County Council advanced routine transfers and approved the 2027 budget after debates over transfers and the county's 0.2% correctional rehabilitation income tax; the council rejected rescinding the tax following public comment and a roll-call vote.
Discussion Points
•A public commenter asked whether legal service requests were connected to an internal investigation and requested costs and taxpayer benefits.
•Council confirmed funds origin (HFI) and legal review had occurred.
•Council debated whether the tax should be rescinded absent a defined project or kept to fund maintenance or future projects.
•Council members asked whether this transfer is an annual requirement; staff said adjustments made for next year could reduce recurrence but it remains possible.
•Council noted that advertised rates may be adjusted downward in final settlement with the state.
•Councilors questioned moving preventative maintenance funds to pay legal expenses and expressed a need to review bills with county staff.
•Estimated shortfall of about $6,904 if pay were granted.
•Health representative described EMS confirmation of deployable machines and need for brief funding to purchase two units.
•Precedent from other departments (e.g., highway) versus the budgetary impact of awarding longevity pay.
•Public commenters provided data and urged the council to demand a clear plan from commissioners before removing the tax.
•Technical corrections to salary and health insurance distribution were discussed and clarified.
Decisions
•Adopt 2027 budgets and levies as presented; sign adoption paperwork.
•Approved $10,300 appropriation for two portable oxygen machines.
•Approved the transfer of $42,283 to the pretrial diversion account.
•Council denied longevity pay for the central dispatch director.
•Motion to rescind 0.2% failed; tax remains in place.
•Motion to table transfer requests passed.
Directions
•Commissioners asked to develop and present a preventive maintenance and project plan to the council.
•Council may revisit the tax next year depending on plan results.
•Do not award longevity pay to the specified position; HR to handle payroll adjustments.
•Procure machines and store at EMA for deployment by EMS/health department.
•Staff and Greene County representatives to provide detailed documentation and meet with councilors for review.
•Staff to complete reconciliations and submit forms to state by required deadlines.
•Staff to monitor budget and advise council if further transfers are forecast.
Grant County Area Plan Commission held a special meeting Oct. 15, 2026, and voted to recommend one-year moratoria to county commissioners on new data centers and on battery energy storage systems while staff and subcommittees finish draft ordinances. The meeting included public testimony both supporting moratoria to allow ordinance development and opposing limited exemptions for existing crypto-mining sites seeking conversion.
Discussion Points
•Commission considered using the Nov. 2 meeting date for a working committee.
•Commissioners favored a pause to allow ordinance drafting and technical review.
•Commissioners favored finishing the subcommittee's ordinance before considering exceptions.
•Developers requested exemptions for existing powered mining sites under 50 MW converting to AI computing; supporters asked for protections tied to conversions.
•Need to distinguish residential backup batteries from utility-scale systems; staff said residential accessory backup systems are not included.
•Staff explained the 90‑day certification clock for ordinances transmitted to county commissioners and towns.
•Supporters emphasized subcommittee work and need for careful drafting; opponents urged exemptions for existing mining sites under 50 MW; commissioners noted concerns about noise and water usage at an existing bitcoin site.
Decisions
•APC moved to recommend a one‑year moratorium (docket 029-26) to county commissioners and town legislative bodies.
•APC recommended a one‑year moratorium (docket 030-26) to county commissioners and town legislative bodies.
•No exemption adopted at the hearing.
•No substantive policy decision; scheduling guidance taken under consideration.
Directions
•Staff and subcommittee to finalize draft ordinance by end of year; stakeholders asked to provide input to Director Glancy.
•Staff to accept materials from developers and subcommittee to consider conversion language in the draft ordinance.
•Staff to distribute materials to clerks and representatives and to attend town meetings if requested.
•Staff to draft BESS ordinance and consult legal counsel; present draft to subcommittee and APC.
The Grama Canyon Drain Board met Oct. 13, 2026, approved multiple contractor payments and awarded brushing/dredging contracts after reviewing competitive bids; members discussed a complex Back Creek study and timing for a public hearing, permitting confusion around an easement prompted an apology from staff, and surveyor reports flagged underwater culverts needing follow-up.
Discussion Points
•A wrong bill was voided and communicated via email.
•Board asked staff not to sign permits for work inside easements unless documentation is explicit.
•Board discussed advertising and remonstrance timing for an assessment public hearing.
•Lowest bid and contractor availability influenced decision.
•Private culvert on a property that may need replacement; board discretion on paying for private crossings.
•Several culverts are underwater; staff to inspect post-harvest.
•Staff clarified the nature of claims (rip-rap, brush, bridge abutment, debris removal)
•Staff has not completed Back Creek analysis; mapping/parcels changed requiring rework.
•Staff misremembered seeing the permit and apologized.
Decisions
•Claims package approved by voice vote
•Contract awarded to Extreme Estimating
•Contract awarded to Finrod
•No assessment adopted; further analysis required.
•Process confirmed; no new rule adopted.
Directions
•Aim for a late-January public hearing if advertising and remonstrance deadlines are met.
•Engineer to advise on proper culvert diameter if replacement is needed.
•Prioritize field inspections and develop clearing recommendations.
•Staff to coordinate scheduling and paperwork.
•Staff to coordinate with area planning and refrain from signing until easement status is explicit.
Grant County Public Safety Communications Policy Board Meeting 10-14-26
The Kern County Public Safety Communications Policy Board met to review staffing, technical issues with radios and notification systems, training and policy-handbook concerns, and interagency response maps. Members discussed equipment refreshes, Active911/dispatch message limits, and a county pay raise that could affect scheduling and staffing.
Discussion Points
•Active911 sends the first narrative box to responders, causing truncated messages.
•AT&T contract administrative side runs through 2027; vendor choices under review.
•Board emphasized need for training and rotation to avoid single-point dependency.
•Council approved $2,000 raise for full-time employees and 3% for part-time.
•County handbook provisions do not match dispatch shift patterns.
•Disparities in hourly pay between part- and full-time staff could create issues.
•Low-volume audio reported from Gas City radios, often at night.
•Need for consistent, countywide dispatcher training.
•Need to extract and track dispatch-specific policies with review dates.
•One new hire, Tiffany Hicks, currently training on night shift.
•Phone-system software dated to 2015–2016; refresh needed.
•Potential causes include programming differences, simulcast behavior, and control-channel changes.
•Some counties show Active911 messages that update as more notes are added.
•Two dispatcher vacancies after an unexpected night-shift departure.
•Vendor will provide four hours of training for each dispatcher.
Directions
•Director Hicks to attend council meetings to advocate for department clarifications.
•Director Hicks to provide current policies and coordinate with HR; committee to prioritize 5–6 policies for immediate review.
•Prepare an RFP for phone-equipment/software replacement and schedule demos.
•Staff to contact Active911/Cushing to explore increasing character limits or sending additional narrative fields.
•Staff to continue recruiting and schedule interviews; report back at next meeting.
•Technical staff (Kevin) to investigate radio programming and control-channel behavior; schedule upgrades.
•Training committee to draft and propose a regular annual schedule for board review.
Commissioners held a lengthy 2027 budget session, approving across-the-board raises for most county employees (with exclusions), multiple departmental appropriation adjustments, and several contract and staffing decisions; several items (including a proposed jail treatment coordinator and an appointed-position longevity question) were tabled for further review.
Discussion Points
•Commissioners debated paying now versus spreading payments; some preferred paying now to avoid burdening future councils.
•Commissioners discussed the risk of approving county coverage and the expectation of state restoration in 2028.
•Concerns raised about affordability and future tax/revenue changes; commissioners noted flexibility of current operating balance.
•Cost estimates showed roughly 231 full‑time employees; after excluding sheriff union, estimates were adjusted (examples cited ~141 employees impacted).
•Multiple line items including overtime, longevity, holiday compensation and part‑time reductions were grouped for efficiency.
•Position salary cited at $67,000; commissioners want clarity if role is pre‑ or post‑sentence.
•Purdue representative noted service areas (community development, ag and natural resources, health and human sciences, 4‑H) and step‑up options.
•Purdue requested a 42% increase; commissioners preferred a 6% increase consistent with levy growth.
•Questions raised about who will perform assessments and whether the duties require a mental‑health background; legal issues about pre‑sentencing information were noted.
•Staff confirmed fund balances and how appropriations would be moved between accounts.
•State reductions created a $417,000 benefits shortfall for 2027.
•Vendor offered multi‑year payment options at 0% interest.
Decisions
•Approve $2,000 raise for most full‑time employees (exclusions noted); commissioners/council $1,000; part‑time 3% increase.
•Approve 6% increase; approve $2,000 raise for the Purdue office employees covered by the contract.
•Approve county coverage of the $417,000 shortfall for 2027.
•Approve purchase and one‑time payment in 2027.
•Approve transfers and adjustments as voted during session (voice votes).
•Item tabled for further information and review.
Directions
•Approve temporary county funding for 2027; request staff to monitor and report on state funding progress.
•Clerk to proceed with purchase and staff to record appropriation in budget accounts.
•County staff to negotiate contract details with Purdue within the approved appropriation.
•Finance staff to update appropriation accounts and prepare salary orders for formal adoption at a later date.
•If Purdue does not accept the county offer, commissioners to revisit the item.
•Staff to update appropriation accounts and prepare documents for final budget adoption in November.
•Table the item pending legal and operational clarification; assign staff to coordinate with the sheriff and jail alternatives committee.
Grant County Community Corrections Advisor Board Meeting 10-6-26
Grant County local advisory council met to approve minutes and financials, spotlighted a probation officer for strong outcomes, discussed DOC funding outlook and municipal vehicle leasing, dissolved a detention-center work group, debated reuse of a closed facility for rehab, reviewed pretrial services data, and heard member reports and health access updates.
Discussion Points
•2027 grant likely will not provide additional funds; commissioners asked to cover benefits.
•2028 restoration is reported as likely but details and program-level recovery unclear.
•Board discussed approvals required from DMH and DOC, tradeoffs of program‑based beds vs. raw capacity, and staffing shortages.
•Board discussed procurement, financing agency roles, and pilot options.
•Board members expressed appreciation and connected his work to larger program goals.
•Data points presented showing shorter length of stay for those on supervision and low violent reoffense rate.
•Grant County featured in Justice Partners report and shows large increases in in‑house group interventions.
•Judge and members noted existing practices such as granting motion withdrawals and entering status of counsel.
•Melissa presented quantitative and qualitative evidence supporting Seth's performance.
•Potential legislative changes (preventative detention) may increase pretrial workload.
•S7 presented staffing and cost estimates to run DHOME as a separate facility.
•Staff described municipal leasing options and initial price ranges.
•Staff use pre/post testing and surveys to evaluate outcomes.
•Whitfield described delays and lack of contact info for appointed counsel.
Decisions
•Motion passed to explore option and report back.
•Work group dissolved and responsibilities consolidated.
Directions
•Encourage follow‑up discussion between judiciary and public defender office.
•Fold topic into jail alternatives work group and set follow‑up meeting(s).
•Pretrial policy team will meet Oct. 28 for recertification planning.
•Staff to investigate detailed pricing, procurement routes, and present findings.
•Staff to monitor legislative developments and report back.
The Grant County Area Plan Commission met Oct. 5, 2026, and spent the night reviewing a staff-drafted 2027 fee and fine schedule (Appendix A) required by recent state changes. The commission approved several targeted amendments — including a minimum $40 fee floor, reduced special-exception/variance fees, and language to add outside-technical-review costs — and passed a resolution recommending the package to the county commissioners.
Discussion Points
•Balancing per-square-foot rates and base fees for large projects.
•Commissioners requested graduated enforcement steps (notice, plan, monitoring) before large penalties.
•Commissioners reviewed individual and group findings of fact prepared by staff for the CAFO application.
•Legal counsel described process to obtain judgments and liens for unpaid fines.
•Methodology linking fees to inspector time and fully loaded staff cost.
•Minimum fee to reduce administrative burden for minor charges.
•Possible compromise: lower per-square-foot rate and raise base fee to protect small applicants.
•Recover outside technical review costs from applicants for complex modifications.
•Staff has received inquiries about converting existing facilities into data centers and has been contacted by potential applicants.
•Staff-justified 13¢/sq ft may produce large fees for big projects.
•Subcommittee has been working on a draft ordinance; staff will circulate a revised draft and schedule a final subcommittee meeting.
Decisions
•Add note to Appendix A stating certificates of occupancy will not be awarded until outstanding fees and fines are paid.
•Adopted staff-prepared group findings of fact for the CAFO matter.
•APC to consider a temporary moratorium at the Oct. 15 meeting; staff will not accept new data-center applications in the interim.
•APC voted to recommend the amended Appendix A and Exhibit B to the county commissioners via Resolution No. 6.
•Both amendments approved by roll call and included in the recommended package.
•No final change to section b; further discussion expected.
Directions
•Staff to circulate the subcommittee-incorporated draft for review and to schedule the Oct. 15 public meeting.
•Staff to make non-substantive cross-reference corrections as empowered by resolution language.
•Staff to track assessed fines and consider enforcement thresholds before pursuing lien/judgment actions.
•Staff to update Appendix A to show the $40 minimum and to add 'plus actual outside technical review cost' where specified.
The Grant County Board of Zoning Appeals on Oct. 5, 2026 approved a variance allowing a detached garage/storage building at 103 West 9th Street in Matthews after hearing applicant testimony and board questions about setbacks, wells and permitting. County legal staff updated the board on ongoing enforcement cases, including a filed answer on the Heimlich matter and a pending appeal regarding a cell tower review.
Discussion Points
•Answer filed in Heimlich matter; pretrial likely.
•Applicant explained small lot sizes necessitate variance; intends personal storage use.
•Board asked about setbacks, well, utilities and whether the lot was vacant.
•Board requested staff prepare monthly totals and descriptions going forward.
•Cell-tower appeal underway and record preparation needed.
•Enforcement approach may include injunction then compliance/fines.
•Monthly permit reports missing for several months; one May report available.
•No public opposition present.
Decisions
•Board to receive monthly permit reports going forward.
•No formal board action taken; updates provided for information.
•Variance for Docket 026-26 approved by roll-call vote.
Directions
•Applicant to obtain permits and stake location for inspection; county staff to process building permit per code.
•Staff to continue preparing records and pleadings; attorney to proceed with filings as appropriate.
•Staff to provide outstanding May report and resume monthly permit reporting.
Grant County Board of Commissioners met Oct. 5, 2026. Commissioners approved routine consent items, authorized multiple MOUs and grant applications (including courthouse panic buttons and oxygen equipment), approved a school resource officer MOU, authorized digitization of historical surveyor books, and endorsed preliminary planning to expand rural transit under the 5311 program.
Discussion Points
•Commissioners asked about pay raises affecting future agreements; sheriff said updates could follow if necessary.
•Commissioners asked about potential future local match and timing; Hamilton said local fiscal commitments would be considered later if the project advances.
•Commissioners asked about timing and funding; Mr. Cunningham said the application deadline was Oct. 21 and that awards are usually known before year end.
•Hamilton outlined NDOT timetable (Nov. 30 deadline for commissioner confirmation; application opens in March and would be submitted in May for a 2028 start).
•Health representative described an assisted‑living transfer that highlighted oxygen needs and introduced a deployable oxygen system option.
•Mr. Cunningham summarized previous uses of court reform grants (cameras, audio) and proposed panic buttons for security.
•Quote of two‑unit cost ($10,300) and use of carryover HFI funds.
•Sheriff Barrett described 61 books containing legal ditch descriptions dating back to 1832 and a vendor quote of $6,722 to digitize.
•Sheriff explained the MOU changes were mainly name updates and that Oak Hill applies annually for grant support.
•Surveyor and IT staff discussed hosting options and funding constraints; the surveyor's office will pursue county funding authorization.
Decisions
•Motion to apply approved unanimously.
•Motion to approve scanning and proceed subject to funding arrangements.
Grant County Board of Health meeting on 2026-09-28 covered division reports (including a rabies-positive bat), a budget increase for legal counsel, a $25,000 preparedness grant application, and a $10,300 purchase for two rapidly deployable oxygen systems for EMA; public comment raised social-media allegations about complaint handling and board appointment timing was discussed.
Discussion Points
•Board had earlier emailed about two items; staff recommended increasing legal counsel fee authorization.
•Board queried whether MOU should permit EMA deployment for facility system failures outside declared disasters.
•County has received this grant since 2001; a backup is designated to help meet deliverables.
•Environmental staff reported an August rabies-positive bat and an increase in bat submissions this year.
•Equipment intended for mobile unit to support assisted-living oxygen needs during emergencies; each unit expected to serve ~10–12 individuals.
•Preparedness grant has 17 deliverables and $25,000 in funding.
Grant County drainage-board meeting covering claims and payments, tile/ditch maintenance and mapping, an engineering authorization for Echo Barker Circle, easement disputes over Thompson Ditch, acceptance of a dredging bid, and multiple citizen maintenance requests.
Discussion Points
•Applicant had already begun building before getting final permit and area-plan routing.
•Applicant requested funds to pay an engineer to create bid-ready plans.
•Board members cited precedent concerns for broad easement reductions.
•Board wanted specs to be submitted to the board before sending the job out for bids.
•Chair read itemized claims and fund balances for multiple ditch funds.
•Landowner said removal of culvert would leave her landlocked.
•Members asked clarifying questions about individual funds and whether future assessments would be required.
•Need to map Long Branch tile and reconcile Ballinger legal description.
•Potential contribution from a solar company and need to negotiate with landowners.
•Residents reported flooding and property damage and requested dredging.
•Staff said contractor may be able to lower or reinstall pipe during dredging; county not committed to paying for pipe.
•Staff shared assessment scenarios that would change annual revenue from $22,600 to about $120,434 under one example.
Decisions
•Approved payment of listed claims and accepted McCain Brothers bid for a portion of dredging work.
•Approved up to $10,000 to hire Scott Rogers for design work.
•Board agreed to pursue mapping, cost estimates and a public hearing when staff returns with specifics.
•Board did not commit to paying for a new culvert but will explore contractor options for repositioning the existing pipe.
•Initial broad easement reduction motion failed; a narrower reduction limited to the first building footprint was approved.
•Proceed with outreach and mapping planning before any assessments are levied.
Directions
•Board to review specifications before advertising and bidding.
•Staff to approach local landowners and developers to discuss voluntary easement changes and mapping efforts.
•Staff to ask the contractor whether the pipe can be reinstalled or lowered as part of the job and then report results to the landowner and the board.
•Staff to confirm contract paperwork and schedule with the accepted contractor.
•Staff to coordinate specification development and receive engineer’s plans.
•Staff to prepare a detailed cost estimate for dredging and an annual maintenance cost estimate; return next meeting with figures for the proposed assessment roll.
•Staff to report back on fund balances and when accounts will collect sufficient revenue for larger projects.
•Staff to verify permitting and coordinate with area-plan office for documentation and future permit routing.
The Grant County Election Board met for a short session to approve prior minutes, set a public test of voting machines for Monday the 28th at 10:00, adopt a campaign-finance notice clarifying social media ad reporting, review electioneering etiquette, and confirm a vote-center transfer requiring notification to the state election division.
Discussion Points
•Board jurisdiction extends over candidates/campaigns, not social-media platforms.
•Board likely did not notify the state election division as required.
•Clarify in-kind and joint advertising reporting.
•Clarify whether tabulation equipment was moved during the primary.
•Ensure copies and materials available for public observers.
•Inspector at each location is charged with enforcing site rules.
•Need to bring reporting guidance up to date for social media and paid consulting.
•Prior transfer to Herbst United Methodist Church and interim use of other sites.
•Reminder that candidates and representatives should not approach voters at polling places.
Grant County Commissioners met Sept. 21, 2026, approving routine consent items, appointing Kyle Persinger as interim county attorney, awarding several departmental contracts and grants, and adopting a resolution delegating administrative powers to the county administrator. Multiple highway projects and routine purchases were discussed and several consent motions passed by voice vote.
Discussion Points
•Annual request for $10,000 county funding to match state appropriation; district chairman available to answer questions.
•Chair announced termination and appointment; Mr. Harker contested notice terms; staff said transition services will run through Sept. 30.
•Four quotes presented for two floors; Kyle's recommended as lowest and quickest to start.
•Health department uses Google Translate presently; vendor offers billed on‑demand service including ASL.
•Kickoff for Bridge 254; Bridge 791 match commitment; Branson Street supplemental hydraulic study estimated up to $84k–$87k; paving program totals and costs discussed.
•Multiple routine and programmatic approvals recorded; voice votes used for most actions.
•No substantive board questions; consent given.
•Staff explained statutory basis (Indiana Code 36‑2‑2‑14) and past resolution (2005) and emphasized that the county administrator will handle day‑to‑day matters under board oversight.
•Vendor offer to reimburse deductibles if 40 vehicles repaired; 10 done to date; county had 64 vehicles on the list.
Decisions
•Appointment of Kyle Persinger approved; Harker's contract terminated effective for transition through Sept. 30.
•Approved agreement with Heartland Interpretation and Translation Services.
•Approved the $10,000 allocation by voice vote.
•Approved vendor contract and accepted recommendation to proceed.
•Award approved by voice vote.
•Multiple approvals and one notable personnel appointment approved by voice vote.
Grant County Council Meeting - Wednesday, September 16, 2026
Grant County Council met to approve routine minutes and several budget actions: health department vehicle replacement and related appropriations, a CDC preparedness grant and retroactive pay, discussion of replacing voting equipment, juvenile detention out-of-county appropriations and several sheriff transfers, a small planning-related transfer for permitting, a request to fill a highway mechanic position, and a decision to hold a public hearing on whether to keep the 0.2% correctional/rehabilitation local income tax.
Discussion Points
•Council asked whether COVID vaccine fund may be used; staff said yes and offered evidence.
•Council member reported negative balances in commissioners' legal accounts and questioned missing bills and lack of explanation.
•Council questioned potential double-paying for contracted beds if local beds become available.
•Council raised a FICA calculation discrepancy that staff agreed to reconcile.
•County attorney/clerk reminded the body that statute requires the revenue to be maintained in a dedicated fund and restricts eligible uses.
•Grant delayed by state/CDC; coordinator performed deliverables without pay since June 30.
•Grant-funded positions are reimbursable; staff submit monthly invoices for prior month’s expenses.
•Health Dept explained insurance settlement and replacement costs.
•Members discussed the need for transparency and agreed to seek clarification from the county auditor and State Board of Accounts.
•Members emphasized the need for public input and to invite criminal-justice stakeholders to the hearing.
•Motion to appropriate funds carried by voice vote.
•No procurement motion taken; item deferred for further budget consideration.
•Sheriff described contracted bed usage, including a recent contract reserving five beds at Madison County.
•Some council members argued to rescind the tax until commissioners propose a project; others urged keeping funds for rehabilitation or operational uses allowed by statute.
•Transfers requested to cover courthouse special deputies and overtime due to major trials.
•Vendor explained that panels and components are aging (components ~26 years old) and that chip shortages affect lead times and prices.
•Vendor offered multi-year payment options and recommended a procurement decision by March for 2027 delivery.
Decisions
•$100,000 appropriation for juvenile placements approved; transfers for deputies and overtime approved.
•Appropriation approved by voice vote.
•No immediate punitive action; matter referred for external review.
•No purchase decision made at this meeting.
•Public hearing scheduled for Oct. 21; council to solicit stakeholder input prior to any final action.
•Retroactive pay and appropriation approved by voice vote.
Directions
•Clerk/County attorney to prepare statutory language and options in case the council moves to rescind or revise.
•Clerk/finance to record appropriation in accounts.
•Clerk to coordinate vendor details and provide options to council ahead of the Oct. 7 special meeting.
•Council to await findings before taking further action.
•County auditor and State Board of Accounts to be asked to review and advise.
•County to process retroactive pay and request reimbursement from the grant.
•Health Department to provide supporting email to finance.
•Prepare and advertise public hearing for Oct. 21.
•Sheriff to coordinate bed use with probation and courts; finance to process transfers and report back.
•Sheriff to monitor juvenile counts and return with utilization updates if needed.
•Staff to reconcile FICA calculation and provide evidence to finance.
Grant County Area Plan Commission approved a property reconfiguration at 8225 E. 100 S. and voted to approve both preliminary and final development plans for Nolan Holloway's proposed 9,000-head confined feeding operation after a lengthy public hearing in which neighbors and experts raised water, floodplain, wildlife and monitoring concerns.
Discussion Points
•Applicant counsel argued the moratorium lacked required notice and APC process and therefore is not a valid zoning moratorium; staff noted the instrument was a resolution, not an ordinance, and highlighted procedural gaps.
•Applicant emphasized ordinance compliance, investment ($3.2M) and local economic benefits.
•Commissioners asked whether a future division with building would trigger a major-subdivision review and potential county highway/bridge responsibilities.
•Counsel debated whether a prior 2018 moratorium remains in effect.
•Opponents asserted the moratorium remained in effect because the APC never followed up as contemplated; counsel argued approval in light of an active moratorium would be unlawful.
•Opponents raised groundwater, floodplain, odor, traffic and wildlife risks and argued the application was incomplete.
•Opponents said the application lacks adequate groundwater samples and mapping of the 100-year floodplain and flagged potential contamination pathways to Hart Creek and Mississinewa Reservoir.
•Staff explained ordinance requirements and confirmed the split will not create a new parcel; easement agreements must be recorded.
•Staff said baseline testing and monitoring are required by ordinance and that applicant identified two operational wells for county monitoring, but that code requires wells to be developed to provide representative sampling.
Decisions
•Approve preliminary and final development plans for Docket 020-26; record final plan; applicant must obtain required state permits before county construction permits issue.
•Commission proceeded to vote. The moratorium issue remains preserved in the hearing record and could be litigated if challengers file an appeal.
•No additional conditions were added at the hearing; commission approved the plans but opponents signaled potential appeal and cited missing documentation.
•Preliminary/Final approval granted for reconfiguration, conditioned on recorded easements.
Directions
•Commissioners to sign individual findings of fact to support votes.
•Opponents requested denial; staff recommended that findings of fact must reflect any unresolved technical gaps and that IDEM permitting will address many technical details.
•Staff to ensure easements are recorded and to prepare findings of fact for signature.
•Staff to ensure written determinations are completed and recorded.
•The disagreement was entered into the record; staff and counsel advised commissioners on the legal distinctions and the need for a clear written record of findings of fact.